ML20238D875

From kanterella
Jump to navigation Jump to search
Ack Receipt of Transmitting Proposed Amend to Physical Security Plan.Response to Encl Comments Requested within 30 Days of Ltr Receipt
ML20238D875
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/27/1987
From: Pastis H
Office of Nuclear Reactor Regulation
To: Tucker H
DUKE POWER CO.
References
GL-87-08, GL-87-8, NUDOCS 8709110462
Download: ML20238D875 (3)


Text

'

Alj6 87 )El  :

Docket No. 50-269/270/287 -

Mr. Hal ~ B. ' Tucker -

Vice President, Nuclear Production

' Duke Powcr Company P.O. Box 33189 422 South Church Street Char.lotte, North Carolina 28242

Dear Mr. Tucker:

This.is to acknowledge receipt of the Duke Power Company letter dated December 2, 1986, which transmitted a proposed amendment to the Oconee Nuclear Station, Units 1, 2 and 3 Physical Security Plan in response to the Miscellaneous Amendments and Search Requirements.

l The submitted document has been reviewed and we have determined'that additional information and revisions to the plan are required prior to our approval.. The enclosed comments are based upon pertinent NRC regu-lations and published guidance describing methods, acceptable to the NRC.

staff, for implementing specific parts of those regulations.

It is requested that you provide your response to these comments within  ;

30 days from receipt of this letter;  ;

The reporting and/or record keeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required 'a under P. L.96-511.

Should you have any questions concerning the enclosed comments, please contact the reviewer, Jane Gibson, at (301) 492-8457. ,

Sincerely,.

1 Helen N. Pastis, Project Manager Project Directorate II-3 Division of Reactor Projects;I/II Office of Nuclear Reactor Regulation i

Enclosure:

DISTRIBUTION W/ ENCLOSURES:

Physical Security Plan Comments RSGB rf Sec rf JGibson l CBuracker (2)  !

cc w/ enclosure: Region II  !

See next page HPastis Case File E..MDuncan -Docket @i1!

NRC PDR RErickson w/o encl Local PDR LBush w/o enci  !

J OFC :RSGB ' g.........

RSGB  : RSGB :PD II- :PD  :

NAME :JGibs n/an :CBurber.

4 ..::LBus W

. R$GB ,gq,p .

REr on-

., g . .......

MDuncan
H s s.

I)

............................................................................................. 1 DATE$8/g/87 8//0 /87 $8/p87 $8/ Jy87 8/lYM7 $8/[87

, OFFICIAL RECORD COPY kF A [

l

I e

Mr. H. B. Tuckor Ocotiee Nuclear Station Duke Power Company Units Nos. 1, 2 a.nd 3 CC:

Mr. A. V. Carr, Esq. Mr. Paul Guill Duke Power Company Duke Power Company P. O. Bcx 33189 Post Office Box 33189 422 South Church Street 422 South Church Street Charlotte, North Carolina 28242 Charlotte, North Carolina 28242 J. Michael McGarry, III, Esq. )

Bishop, Liberman, Cook, Purcell & Reynolds 1200 Seventeenth Street, N.W. ,

Washington, D.C. 20036 l

Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 Fanager, LIS NUS Corporation '

2536 Countryside Boulevard Clearwater, Florida 33515 Senior Resident inspector U.S. Nuclear Regulatory Commission .

Route 2, Box 610 Seneca, South Carolina 29578 l

Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 l Mr. Heyward G. Shealy, Chief l Bureau of Radiological Health South Carolina Department of Health and Environmental Cor. trol 2600 Bull Street i Columbia, South Carolina 29201 Office of Intergovernmental Relations 4 116 West Jones Street i Raleigh, North Carolina 27603 l Honorable James M. Phinney l Ccunty Supervisor of Oconee County Walhalla, South Carolinn 29621 l

l

o Docket No. 50-269/270/287 '

OCONEE NUCLEAR STATION, UNITS 1, 2 AND 3 COMMENTS ON PHYSICAL SECURITI PLAN CHANGES (MISCELLANEOUS AMLNDMENTS AND SEARCH REQUIREMENTS)

Provide a schedule for implementing the amenc'ed safeguards requirements.

Reference 10 CFR 73.55.

State that vital area access controls will not be dropped for life threatening situations not involving public health and safety. Reference 10 CFR 50.54.(x) l and (y) and Generic Letter 87-08 (Q&A #3).

Provide a commitment that if security force members leave the protected area to perform official duties subsequent to their initial entry and search, they will be seerched prior to re-entry into the protected area if they have not been under direct observation or accompanied by another member of the security force. Reference 10 CFR 73.55(d)(1) and Generic Letter 87-08 (Q&A #11).

Provide a commitment that the secondary power supply systems for both the alarm annunciator equipment and non portable communications equipment shall be located within a vital area. Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A #16).

Indicate what components of the secondary power supply system will be protected as vital. Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A #18).

l l

l l

l l

I L___________-__-____