[P K8Cg#'o UNITED STATES
g NUCLEAR REGULATORY COMMISSION
'
! " > f.
g REGION il
'
,
l 2-
-
/
r 230 PEACHTREE STREET, N.W. SUITE 1217 I
o ATLANTA, GEORGIA 30303 gv....f
,
'
Report Nos.:
50-269/78-10, 50-270/78-10 and 50-287/78-10 Docket Nos.:
50-269, 50-270 and 50-287 License Nos.:
DPR-38, DPR-47 and DPR-55 Licensee:
Duke Power Company 422 South Church Street Charlotte, North Carolina 28242 Facility Name: Oconee Units 1, 2 and 3 Inspection at: Oconee site, Seneca, South Carolina Inspection conducted: April 24-27, 1978 Inspector:
W. H. Bra 'o
'
/
Approved by:
[Y3 -
[
P.J.K4T1/"$Ief/onNo.2
/Date'
Nuclear Subport Secti
,
Reactor Operations and Nuclear Support Branch Inspection Summary Inspection on April 24-27, 1978: (Report Nos. 50-269/78-10.
50-270/78-10 and 50-287/78-10)
Areas Inspected: Routine, unannounced inspection of the fire prevention /protectica program, including work control procedures, quality control surveillance, design change controls, emergency shutdown procedures, facility inspection, fire insurance reports, periodic fire protection and fire detection surveillance testing. The inspection involved 36 inspector-hours by one NRC inspector.
Results: Within the areas inspected, no items of noncompliance or deviations were identified; an unresolved item was identified (78-10-01)
awaiting cable penetration fire stop flammability test; and open item (78-10-02) previous commitment to NRC to implement firefighting procedures for critical areas by September 1, 1979.
..
es0 7
,gn
.
= we sowmw
--.,ay....m
.
,m,
_
_
, _ _
_,
,, _ _ _ _,
_
i
-
-
!
.
.
!
9'
RII Rpt. Nos. 50-269/78-10, 50-270/78-10 and 50-287/78-10 1-1
,J DETAILS I Prepared by:N.
NL J
'/b
-
W.H.Bradford,peactorInspector
/Date Nuclear Support Section No. 2 Reactor Operations and Nuclear Support Branch Dates of Inspection-A 1 '
97 1978 If[7 Reviewed by:
/ _
"
~
(pace l
P. 31 va, icI3 7%
Nucle 9 port Secti n No. 2 Reactor Operations and Nuclear Support Branch
'
1.
Persons Contacted Duke Power Company
- R. M. Koehler, Superintendent of Technical Services J. M. Davis, Superintendent of Maintenance
- J T. McIntosh, Director of Administrative Services
- W. M. Harris, Operating Engineer'
W. E. Martin, Planning Engineer
- R.
T. Bond, Technical Services Engineer
- D. G. Austin, Training and Safety Coordinator
- W. G. Itin, Safety Supervisor C. T. Yongue, Station Health Physicist
- R.
T. Brackett, Station Senior QA Engineer
- E. D. Brockman, Jr., Design Engineer - C/E Division
- N. Broome, McNeary Insurance Co. Consultant
- Denotes those present at exit interview.
2.
Licensee Action on Previous Inspection Findings Not inspected.
3.
Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of noncompliance, or deviations.
One unresolved item disclosed during the inspect. ion is discussed in paragraph 5 of this report.
.
=. -
w e.~
,,.,. - = - - -
--me-
--
-+.e..
-. -.
.-...m
,...-,p
.e,m.
%.%
.
-
- p
- - _ _
.
- -..
-. - - -... -
.
.
-
-
-
-
.
.
.
.
i
!
RII Rpt. Nos. 50-269/78-10, 50-277/78-10 l
and 50-287/78-10 I-2 i
.
I
4.
Management Interview A management interview was conducted at the conclusion of the inspection on April 27, 1978, with R. M. Koehler and other licensee staff members (denoted in paragraph 1).
All subjects presented in these details were discussed. The licensee acknowledged these findings without comment.
5.
Fire Protection and Prevention The licensee's fire protection and prevention program was reviewed to verify that controls had been established to include: (1) work control procedures which control welding and burning, plant operations approval and control of all work done under the work control procedure, and a requirement for a fire watch for welding and burning operations with capability of communication with the control room; (2) requirements for quality assurance surveillance during, maintenance and modification of fire stop penetration seals; and (3) a 10 CFR 50.59 review of all replacement cable penetration seal material to assure that flammable material is not used.
The inspector reviewed emergency shutdown procedures, the latest fire insurance carrier inspection reports, and made an inspection tour of a major portion of the plant.
The program was evaluated for conformance to the Technical Specifications, 10 CFR 50.59; Criteria III and IV of Appendix A to 10 CFR 50; Section 3.2.3 of ANSI N45.2; and Section 6 of Appendix A to Regulatory Guide 1.33.
The plant was also inspected to the commitments set forth in the licensee's response to Inspection and Enforcement Bulletin Nos. 75-04 and 75-04A dated April 23, 1975, and the Duke Power Company response to Appendix A to Branch Technical Position APCSB 9,5-1, " Guidelines for Fire Protection for Nuclear Power Plants," and response to the NRC's " Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls and Quality Assurance."
Within the areas inspected, no items of noncompliance or deviations were identified; however, the material used in the cable penetration fire stop tests is questionable as to its flammability.
The licensee has made previous commitments to the NRC, by letter of February 17, 1978, to conduct cable penetration fire stop tests by April 30, 1978. At the time of the inspection this testing had not been completed.
This item is unresolved (No. 78-10-01) pending the cocpletion and results of the cable penetration fire stop tests.
P o
...
.__
..
-
- - - - - - -
'
.
..
'[
RII Rpt. Nos. 50-269/78-10, 50-270/78-10 and 50-287/78-10 I-3 The licensee has committed to develope and implement firefighting procedures for critical areas as outlined in Attachment No. 5 of the NRC's " Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls and Quality Assurance." This program will be implemented by September 1, 1979.
This matter is open item No.
78-10-02, pending the completion and implementing of these procedures.
.
aww