># 8809
UNITED ST ATES
- o$L NUCLEAR REGULATORY COMMISSION p
.
3e n
Rett' Nil (]/, p* / f
-
/
230 PEACHTREE STr.EET, N.W. SulTE 819
..
~
ATLANTA, GEORGI A 30303 o
%...* /
Report Nos.:
50-269/78-2, 50-270/78-2 and 50-287/78-2 Docket Nos.:
50-269, 50-270 and 50-287 Licensee:
Duke Power Company 422 Church Street Charlotte, North Carolina 28242 Facility Name:
Oconee Nuclear Station Units 1, 2 and 3 Inspection at:
Oconee Nuclear Station Seneca, South Carolina Inspection conducted:
January 24-26, 1978 Inspector: p. L. Cunnin ghan Reviewed by:
\\N.
b-
J f W. Huf%n Chief Date i
Env'ronmenta land Special Projects Section Fe Facility and !'aterials Saf ety Branch Inspection Summar" Inspection on January 24-26, 1978 (Report ros. 50-269/78-2. 50-270/7S-2 and 50-28 7 / 78-2 )
Areas Inspected:
Routine unannounced inspection of nonradiological environmental protection program including administrative and manacement controls; environmental monitoring and surveillance assessment; review of procedures, follovup on previous inspection findings; inspection of status and operation of wastewater treatment system; review of station chemical discharges; review of special studies.
The inspection involved 22 inspector-hours on-site by one NRC inspector.
Results: Of the seven areas inspected, no apparent items of noncompliance or deviations were disclosed.
-
.
7911280 70 2
.
-
..
.
?
E
g
..
..
<,
.
Rff Rpt. Nos. 50-269/78-2, 50-270/78-2 and 50-287/78-2 I-1
//
f[..
DETAILS I Prepared by:
Y.
3 ('i/// /tefredd-_
'/.79
'
A. L. Cunningham, Env,1;efGhent al
' Date Scientist, Environmental and Special Projects Section Fuel Facility and Materials Safety Branch
,
u Dates of Inspection.
Jar uary 24-26, 1978
\\
Reviewedby:\\
N\\
'
.
.
m-J W. Hufh a Chief
\\Da't e iE6 ironment and Special Projects (Shetion Fual Facility and Materials Saf ety Branch
All information in the following Details applies equally to Units 1, 2 and 3.
1.
Individuals Contacted
- R.
M. Koehler, Superintendent of Technical Services B. C. Smith, Station Chemist
- J.
Sevic, Station Biologist M. Killough, Biologist
- L. J. Benge, Chemistry Supervisor n
- R.
T. Bond, ~echnical Services Engineer
,
- Denotes those present at exit interview.
2.
Licensee Action on Previous Inspection Findings (Closed)
Noncompliance (50-269/77-11, 50-270/77-11; 50-287/77-11):
Station Discharge pH Limits.
The inspector reviewed corrective action commitments defined in the licensees letter to NRC Region II Director on August 15, 1977. During the subject inspection, the inspector verified that all corrective actions were i=plemented as defined. This item was discussed with licensee representatives and formally closed out at the exit interview.
(Closed)
Deviation (50-269/77-5/ 50-270/77-5; 50-287/77-5): Incom-plete Corrective Action.
The inspector verified that the licensee implemented the corrective action commitment involving installation of a control room Hi/Lo pH alarm for the station waste water treat-
,,
'
ment system discharge pH.
Operation of the alarm under test conditions
,
was verified by the inspector. This item was discussed with licensee i
representatives and formally closed out at the exit interview.
...
-