IR 05000244/2022006

From kanterella
Revision as of 14:06, 15 March 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006)
ML23059A009
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/01/2023
From: Erin Carfang
NRC/RGN-I/DORS
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2022006
Download: ML23059A009 (1)


Text

March 1, 2023

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR R.E. GINNA NUCLEAR POWER PLANT, LLC (REPORT 05000244/2022006)

Dear David Rhoades:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of R.E. Ginna Nuclear Power Plant, LLC (Ginna), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2022 through December 31, 2022. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Ginna during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Ginna.

The enclosed inspection plan lists the inspections scheduled through December 31, 2024.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC adjusted inspection plans and schedules to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. While the PHE continues, overall conditions throughout the country support performance of our inspection and oversight activities returning to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection samples. We continue to monitor site-specific conditions and, as discussed in our November 2, 2021, memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ML21295A302), it may be necessary to alter how and when we perform our inspection and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission.

For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

Beginning on January 1, 2023, the engineering inspection frequency will transition from a triennial (3-year) to a quadrennial (4-year) cycle. The new engineering inspection program will consist of a Comprehensive Engineering Team Inspection (CETI) 1 and three Focused Engineering Inspections (FEIs) that will be performed in each quadrennial cycle. For the cycle beginning in 2023, the FEIs will be: Fire Protection Team Inspection, Commercial Grade Dedication, and an engineering inspection that reviews age-related degradation and management 2.

Aspects of the Design Basis Assurance Inspection (DBAI), Evaluations of Changes, Tests, & Experiments, and Heat Sink inspections will be included in the new CETI inspection. Previously scheduled Evaluation of Changes, Tests, & Experiments and Heat Sink inspections have been cancelled and removed from the attached Report 22.

The Age-Related Degradation procedure is publicly available and the NRC plans to implement the first inspection of this type beginning in July 2023. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5120 with any questions you have regarding this letter.

Sincerely, Digitally signed by Erin E.

Erin E. Carfang Date: 2023.03.01 Carfang 09:04:42 -05'00'

Erin Carfang, Chief Projects Branch 1 Division of Operating Reactor Safety Docket No. 05000244 License No. DPR-18 Enclosure:

As stated cc w/ encl: Distribution via LISTSERV

ML23059A009 x Non-Sensitive x Publicly Available x SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DORS RI/DORS NAME SHaney ECarfang DATE 2/27/2023 2/27/2023

Site Inspection Activity Plan Ginna 01/01/2023 - 12/31/2024 Unit Start End Activity CAC Title Staff Count Inservice Inspection - Ginna 1 1 4/17/2023 4/28/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP- Rad Hazards Assess and Control 71124.01 1 1 4/17/2023 4/21/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls RP - 71124.05 Instrumentation 1 1 5/8/2023 5/12/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation Access Control, Protective Strat Review, TS Review, Security Plan Review, PI-Ginna 4 1 6/26/2023 6/30/2023 IP 71130.02 000734 Access Control 1 6/26/2023 6/30/2023 IP 71130.05 000737 Protective Strategy Evaluation 1 6/26/2023 6/30/2023 IP 71130.09 001656 Security Plan Changes 1 6/26/2023 6/30/2023 IP 71130.14 000743 Review of Power Reactor Target Sets 1 6/26/2023 6/30/2023 IP 71151 001338 Performance Indicator Verification Material Control and Accounting - Ginna 1 1 7/24/2023 7/28/2023 IP 71130.11 000742 Material Control and Accounting (MC&A)

EP Program Inspection 1 1 10/9/2023 10/13/2023 IP 71114.02 000717 Alert and Notification System Testing 1 10/9/2023 10/13/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 10/9/2023 10/13/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 10/9/2023 10/13/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 10/9/2023 10/13/2023 IP 71151 001397 Performance Indicator Verification RP - 71151 PIV 1 1 10/23/2023 10/25/2023 IP 71151 000746 Performance Indicator Verification Focused Engineering Inspection - Aging Related 3 1 11/13/2023 11/17/2023 IP 71111.21N.04 001832 Age-Related Degradation 1 11/27/2023 12/1/2023 IP 71111.21N.04 001832 Age-Related Degradation Fire Protection - Ginna 3 1 3/4/2024 3/8/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1 3/18/2024 3/22/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

71124.08 (RadWaste) 1 1 3/11/2024 3/15/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Cyber Security - Ginna 4 1 6/10/2024 6/14/2024 IP 71130.10 000741 Cybersecurity Prepared on 1/30/2023 2:12:21 PM 1 of 2

Site Inspection Activity Plan PI&R Biennial Team Inspection - GN 4 1 7/15/2024 7/19/2024 IP 71152B 000747 Problem Identification and Resolution 1 7/29/2024 8/2/2024 IP 71152B 000747 Problem Identification and Resolution FY24 Ginna Initial Licensing Exam 3 1 7/8/2024 7/12/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 7/22/2024 7/26/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

EP Exercise Inspection - Ginna 5 1 8/19/2024 8/23/2024 IP 71114.01 000716 Exercise Evaluation 1 8/19/2024 8/23/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 8/19/2024 8/23/2024 IP 71151 001397 Performance Indicator Verification Inservice Inspection - Ginna 1 1 10/7/2024 10/18/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

71124.01 (Rad Hazard) 1 1 10/7/2024 10/11/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Access Control, Equipment Testing and Maintenance, Training, SPR 3 1 10/28/2024 11/1/2024 IP 71130.02 000734 Access Control 1 10/28/2024 11/1/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1 10/28/2024 11/1/2024 IP 71130.07 000739 Security Training 1 10/28/2024 11/1/2024 IP 71130.09 001656 Security Plan Changes 1 10/28/2024 11/1/2024 IP 71151 001338 Performance Indicator Verification Ginna Requal Insp with P/F Results 1 1 11/4/2024 11/8/2024 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1 11/4/2024 11/8/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance 71124.03 & 71124.04 (Airborne & Occupational Dose) & 71151 (PIV) 1 1 11/4/2024 11/8/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 11/4/2024 11/8/2024 IP 71124.04 000728 Occupational Dose Assessment 1 11/4/2024 11/8/2024 IP 71151 000746 Performance Indicator Verification Prepared on 1/30/2023 2:12:21 PM 2 of 2