Similar Documents at Ginna |
---|
Category:Inspection Plan
MONTHYEARIR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) IR 05000244/20220052022-08-31031 August 2022 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2022005) IR 05000244/20210062022-03-0202 March 2022 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2021006) IR 05000244/20210052021-09-0101 September 2021 Updated Inspection Plan for the R.E. Ginna Nuclear Power Plant, Llc (Report 05000244/2021005 ML21119A1082021-04-27027 April 2021 Ti 2515/194 Inspection Documentation Request IR 05000244/20200062021-03-0303 March 2021 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2020006) ML21011A0872021-01-11011 January 2021 LLC: Notification of Conduct of a Fire Protection Team Inspection IR 05000244/20200052020-08-31031 August 2020 Updated Inspection Plan for the R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2020005) IR 05000244/20190062020-03-0303 March 2020 Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2019006) IR 05000244/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 0500244/2019005) IR 05000244/20180062019-03-0404 March 2019 Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2018006) IR 05000244/20180052018-08-28028 August 2018 R. E. Ginna Nuclear Power Plant LLC Updated Inspection Plan: Inspection Report 05000244/2018005 IR 05000244/20170062018-02-28028 February 2018 Annual Assessment Letter for R. E. Ginna Nuclear Power Plant, LLC (Reports 05000244/2017006, 05000244/2017402, and 05000244/2017501) IR 05000244/20170052017-08-28028 August 2017 Updated Inspection Plan for R. E. Ginna Nuclear Power Plant - Inspection Report 05000244/2017005 IR 05000244/20160062017-03-0101 March 2017 Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant (Report 05000244/2016006) IR 05000244/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for R.E. Ginna Nuclear Power Plant, (Report 0500244/2016005) IR 05000244/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2015006) IR 05000244/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2015005) ML15170A3942015-06-17017 June 2015 Document Request for Appendix R Licensing Basis (Updated and Modified Request List of Documents from the Inspection Plan) ML15147A0042015-05-26026 May 2015 LLC - Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information (9-2015) IR 05000244/20140012015-03-0404 March 2015 2014 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2014001)(w/Inspection Plan) IR 05000244/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - R.E. Ginna Nuclear Power Plant (Report 05000244-14-006) IR 05000244/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2013001)(w/Inspection Plan) IR 05000244/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - R.E. Ginna Nuclear Power Plant (Report 05000244-13-006) IR 05000244/20120012013-03-0404 March 2013 Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant (Report 05000244/2012001) ML12244A3322012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Ginna Nuclear Power Plant IR 05000244/20110012012-03-0505 March 2012 Annual Assessment Letter (Report 05000244-11-001) ML1124207882011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - R. E. Ginna Nuclear Power Plant IR 05000244/20100012011-03-0404 March 2011 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2010001) ML1024401992010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - R.E. Ginna Nuclear Power Plant ML1016600092010-06-15015 June 2010 Pre-Inspection Cover Sheet and Inspection Plan (6/21-6/25/10) ML1006208332010-03-0303 March 2010 Annual Assessment Letter (Report 05000244-10-001) ML0924402302009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - R.E. Ginna Nuclear Power Plant, Dated 09/01/09 IR 05000244/20090012009-03-0404 March 2009 IR 05000244-09-001, Ginna Nuclear Power Plant Annual Assessment Letter, Dated 03/04/09 IR 05000244/20080012008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, R.E. Ginna, (IR 05000244-08-001) ML0806100142008-03-0303 March 2008 Annual Assessment Letter EOC 2007 ROP8 - Ginna Station (05000244/2008001) ML0734709602007-12-13013 December 2007 ROP8 - Ginna - Change to Inspection Plan, 12/13/07 ML0724309382007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - R.E. Ginna ML0706106172007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Ginna Station (05-244/2007001) ML0624304962006-08-31031 August 2006 Mid-Cycle Performance Review and Inspection Plan - R. E. Ginna Nuclear Power Plant ML0606203182006-03-0202 March 2006 2006-001 - Annual Assessment Letter - R. E. Ginna Nuclear Power Plant (Report 05-244/2006001) ML0524206822005-08-30030 August 2005 Mid-Cycle Performance Review and Inspection Plan - R. E. Ginna Nuclear Power Plant IR 05000244/20050012005-03-0202 March 2005 Annual Assessment Letter - R.E. Ginna Nuclear Power Plant (Report 05000244/2005001) ML0424408312004-08-30030 August 2004 2004 Ginna Mid-Cycle Performance Review and Inspection Plan ML0406301752004-03-0202 March 2004 2003-04 Annual Assessment Letter - Ginna ML0306200212003-03-0303 March 2003 2003 Annual Assessment Letter - R.E. Ginna Nuclear Power Plant ML0223802522002-08-26026 August 2002 2002 Ginna Mid-Cycle Performance Review and Inspection Plan IR 05000244/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - R. E. Ginna (Report 50-244/02-01) 2023-08-31
[Table view] Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406.1415 September 1, 2010 Mr. John T. Carlln Vice President R E. Ginna Nuclear Power Plant R E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519 SUB~'ECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - R E.
GINNA NUCLEAR POWER PLANT
Dear Mr. Carlin:
On August 10, 2010, the Nuclear Regulatory Commission (NRC) staff completed its performance review of the R E. Ginna Nuclear Power Plant (Ginna). Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30. 2010. The purpose of this letter is to inform you of the results of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only~-Security Information" will include the security cornerstone review and resultant inspection plan.
Safety performance at Ginna for the most recent quarter was within the Degraded Cornerstone column of the NRC's Action matrix, based on two findings having low to moderate safety significance (White) and one White Performance (PI) in the Mitigating Systems Cornerstone.
The first White finding, originating in the first quarter 2009, was related to inadequate implementation of a preventive maintenance program for the turbine-driven auxiliary feedwater (TDAFW) pump governor. The second White finding, originating in the fourth quarter 2009, was related to inadequate corrective actions which led to binding of the governor control valve and failure of the same TDAFW pump. The White PI was related to exceeding the White Significance threshold for the Mitigating Systems Performance Index (MSPI). Heat Removal Systems PI, in the third quarter 2009, due to the reliability issues associated with auxiliary feedwater system and specifically, the TDAFW pump.
On July 23, 2010, we completed a supplemental inspection pursuant to Inspection Procedure 95002, "Inspection for One Degraded Cornerstone or Any Three White Inputs In a Strategic Performance Area." This inspection was conducted to provide assurance that the root and contributing causes for the risk significant performance issues (White findings and White PI) are understood, to independently assess the extent of condition, to independently determine if safety culture components contributed to the performance issues, and to provide assurance that the corrective actions are sufficient to prevent recurrEmce. The public exit meeting and the regulatory performance meeting for the supplemental inspection were conducted on August 4, 2010, and the report was issued on August 31,2010. Based on the results of the 95002 inspection, the NRC did not identify any findings of significance and determined that all of the 95002 objectives were satisfied. Therefore, based on these results, Ginna returned to the Regulatory Response Column of the NRC's Action Matrix in the third quarter of 201 O.
J. Carlin 2 The enclosed inspection plan details the inspections. less those related to physical protection, scheduled through December 31, 2011. In addition to the baseline inspections, we plan on conducting independent spent fuel storage installatiem inspections. The inspection plan is provided to allow for the resolution of any schedulint~ conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC's "Ru!l3s of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel of my staff at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
!!:::.?~
Acting Regional Administrator Region I Docket No. 50-244 License No. DPR-18 Enclosure Ginna Inspection I Activity Plan ccw/encl: Distribution via ListServ
J. Carlin 2 The enclosed inspection plan details the inspections, less those related to physical protection.
scheduled through December 31, 2011. In addition to the baseline inspections, we plan on conducting independent spent fuel storage installation inspections. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice,* a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room*
or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). .
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel of my staff at 610-337-5233 with any questions you may have regarding this Jetter or the inspection plan.
Sincerely, IRA!
Marc L. Dapas Acting Regional Administrator Region I Docket No. 50-244 License No. DPR-18 Enclosure Ginna Inspection I Activity Plan Distribution w/encl:(via E-mail)
M. Dapas, Acting RA J. Hawkins, DRP DRS Branch Chiefs (6)
D. Lew, Acting ORA G. Hunegs, DRP, SRI D. Serenci, PAO, J. Clifford, DRP L. Casey, DRP. RI N. Sheehan, PAO D. Collins, DRP M. Rose, DRP, OA R Barkley, ORA D. Roberts, DRS D. 8earde, DRS N. McNamara, SLO P. Wilson, DRS RidsNrrPMREGinna Resource D. Tifft, SLO
- l. Trocine, RI OEDO RidsNrrDorlLpl1-1 Resource A. Klett, NRR G. Dentel, DRP RidsNrrDirslpabResoul'ce@nrc.gov N. Perry, ORP ROPreportsResource@nrc.gov SUNSI Review Complete: JRH (Reviewer'S Initials) ML102440199 DOCUMENT NAME: S:\ROP-11 Mid-Cycle Review\Branch 1\Ginna MC LTR.doc After declaring this document "An Official Agency Record" it will be released to the Public.
To recelye a copy of this document, Indicate in the box: 'C' =Copy without attachmentlenclosura "E':: Copy with attachmenVenclosure "N' No copy OFFIC RIIDRP RIIDRP NAME GDentelfGTD JCliffordfJWC DATE 08/24 110 081 30 110 OFFICIAL RECORD COpy
Page 1 of2 Ginna 08/3012010 10:14:40 Inspection 1Activity Plan Report 22 08/0112010 - 12/31/2011 Planned Dates m~~:&~iMg~':'~~:~"il411 MiimtfMflg=CiIWifl'~lnb~~"'fU'Bninl'nWI~&l.iWiiW"!!~'jt'~iil.lili!liiia~iI'ii~'IIJ~i~:
Start End ISFSI -ISFSI DRY RUN AND INITIAL LOADING 8 1 0810212010 08127/2010 IP 60854 Preoperational Testing Of An ISFSI 0810212010 08127/2010 IP 60855 Operation Of An ISFSI 711111B
- REQUAL INSP WI P/F RESULTS 3 1 11/0812010 11/12/2010 IP 7111111B Licensed Operator Requalification Program TI179
- 25151T1179 NSTS VERIFICATION 1 1 09120/2010 1010812010 IP 25151179 Verification of Licensee Responses to NRC Requirement fOr Inventories of Materials Tracked in NSTS 71124 - RAD SAFETY - RAD HAZZARD ASSESS/ALARA 1 0912712010 10/0112010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 09/27/2010 10/0112010 IP 71124.02 Occupational ALARA Planning and Controls 09/2712010 10/01/2010 IP 71151 Performance Indicator Verification CDBI - COMPONENT DESIGN BASES INSPECTION 7 10/18/2010 10/2212010 IP 7111121 Component Design Bases Inspection 11/01/2010 1111212010 IP 7111121 Component Design Bases Inspection 71124.05 - RAD INSTRUMENTATION 1 01/10/2011 01114/2011 IP 71124.05 Radiation Monitoring Instrumentation 71124.01 - RAD HAZZARD ASSESS, ALARA, AIR, DOSE 1 03/2812011 04/01/2011 IP 71124.01 Radiological Hazard Assessment and Exposure COntrols 1 0312812011 04/0112011 IP 71124.02 Occupational ALARA Planning and Controls 1 03128/2011 04/0112011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 0312812011 04101/2011 IP 71124.04 Occupational Dose Assessment 1 03128/2011 04/0112011 IP 71124.05 Radiation Monitoring Instrumentatlon TI-177 - MANAGING GAS ACCUMULATION IN ECCS 2 1 04/0412011 04/08/2011 IP 25151177 Managing Gas Accumulation In Emergency Core Cooling. Decay Heat Removal & Containment Spray System 7111108P - INSERVICE INSPECTION 1 05/09/2011 05/20/2011 IP 7111108P Inservice Inspection ActiVities PWR 71124.01 - RAD HAZARD ASSESS, ALARA, AIR, DOSE 05/09/2011 05/27/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 05/09/2011 05/27/2011 IP 71124.02 Occupational ALARA Planning and Controls 05/09/2011 05/27/2011 IP 71124.03 In-Plant Airbome Radioactivity ContrOl and Mitigation 05/09/2011 05/27/2011 IP 71124.04 Occupational Dose Assessment 05/09/2011 05/27/2011 IP 71124.05 Radiation MonitOring Instrumentation 71124.06 -RETS 09/1212011 09/1612011 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 0911212011 09116/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment
Page 2of2 Ginna 08130/2010 10:14:40 Inspection I Activity Plan Report 22 08/01/2010 - 12131/2011 Planned Dates Start End Title 71124.06 - RETS 09/12/2011 09116/2011 IP 71151-0R01 Occupational Exposure Control Effectiveness 09/12/2011 09/16/2011 IP 71151*PR01 RETS/ODCM Radiological Effluent 7111107T - TRIENNIAL HEAT SINK 1 09/19/2011 0912312011 IP 7111107T Heat Sink Performance 7111117 - PERMANENT PLANT MODIFICATIONS 3 10/03/2011 10/07/2011 IP 7111117T Evaluations of Changes, Tests. or Experiments and Permanent Plant Modifications 10/1712011 10/2112011 IP 7111117T Evaluations of Changes. Tests. or Experiments and Permanent Plant Modifications EPEX - EP EXERCISE EVALUATION 4 10/2412011 10/2812011 IP 7111401 Exercise Evaluation 10/2412011 1012812011 lP 7111404 Emergency Action Level and Emergency Plan Changes 1 10/24/2011 10/2812011 IP 71151-EP01 DrililExercise Performance 1 10/24/2011 10/2812011 IP 71151-EP02 ERO Drill Participation 10/24/2011 10/28/2011 IP 71151-EP03 Alert & Notification System his report does not include INPO and OUTAGEactivllies.
This report shows only on,.gite and announced inspection procedures.
mr.arrm:ItU,R.i>il(~,h5.!d.HIHGtf?,(.t.""(;ar~,, ..i!'iti.,ntl. *..ttiiiIT',i'f0FIimt~:<<;,.... ;;:;! ""*IIPipphi(!'tf\3IH!bilh}f,l?lh,,,i,,.,+l;',,,i)I,;:1.,,hH>t,:'<i4>4i!-:-<k...)::u*.I."U
.---'-----~.-'--." ..-. --