August 30, 2004 Ms. Mary G. Korsnick Vice President R. E. Ginna Nuclear Power Plant R. E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - R.E. GINNA NUCLEAR POWER PLANT
Dear Ms. Korsnick:
On August 4, 2004, the NRC completed its mid-cycle plant performance assessment of the R.E.
Ginna Nuclear Power Plant. The mid-cycle review for Ginna involved the participation of all technical divisions in evaluating performance for the first half of the calendar year 2004 assessment cycle. The process included a review of performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have the opportunity to prepare for these inspections and inform us of any planned inspections that may conflict with your plant activities.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Proprietary Information in accordance with 10 CFR 2.390(d)(1)" will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). The significance of a fire protection finding regarding the impact of a transformer fire on the cable tunnel has been under review as part of the Significance Determination Process and was recently determined to be of very low safety significance (Green).
The details of our analysis will be provided in our next integrated inspection report. Therefore, we plan to conduct only reactor oversight process (ROP) baseline inspections at your facility through March 31, 2006.
Additionally, on March 30, 2004, the staff issued a Severity Level III Notice of Violation in accordance with the NRCs enforcement policy. This issue related to an occurrence in March 2002, involving manipulation of valves by the outage manager in violation of plant procedures.
The NRC has previously concluded that your corrective actions taken regarding this matter were appropriate, therefore no additional follow-up inspection is planned.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2006. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their
Ms. Mary G. Korsnick 2
ongoing and continuous nature. The inspections in the last twelve months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.govreading-rm/adams.html (Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5186 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mr. James M. Trapp, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket No. 50-244 License No. DPR-18
Enclosure:
R.E.Ginna Inspection/Activity Plan cc w/encl:
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law J. M. Petro, Jr., Esquire, Counsel, Constellation Energy Group, Inc.
P. R. Smith, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority D. Stenger, Ballard, Spahr, Andrews and Ingersoll, LLP T. Wideman, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness T. Judson, Central New York Citizens Awareness Network Institute of Nuclear Power Operations (INPO)
Ms. Mary G. Korsnick 3
Distribution w/encl:
(via E-mail)
S. Collins, RA J. Wiggins, DRA C. Miller, RI EDO Coordinator R. Laufer, NRR R. Clark, PM, NRR P. Milano, PM, NRR J. Trapp, DRP N. Perry, DRP K. Kolaczyk, DRP, Senior Resident Inspector M. Marshfield, DRP, Resident Inspector S. DiMora, Resident OA Region I Docket Room (with concurrences)
D. Screnci, PAO N. Sheehan, PAO DRS Director DRS Deputy Director DRS Branch Chiefs RidsNrrDipmlipb DOCUMENT NAME: G:\\DRP\\BRANCH1\\BRANCH1\\2004 ROP 5 Mid-Cycle Review\\2004 Mid-Cycle Letters\\Ginna 2004 Mid-Cycle Letter.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRS NAME NPerry/NSP JTrapp/JMT JRogge/JFR DATE 08/25/04 08/30/04 08/25/04 08/ /04 08/ /04 OFFICIAL RECORD COPY
Ginna Inspection / Activity Plan 07/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2004 10:34:12 Report 22 1
7111107B
- HEAT SINK Baseline Inspections 07/12/2004 07/16/2004 Heat Sink Performance IP 7111107B 1
1 7112203
- PUB RAD SAFETY - REMP Baseline Inspections 07/26/2004 07/30/2004 Radiological Environmental Monitoring Program IP 7112203 1
3 7111117B
- MODS & 50.59 Baseline Inspections 08/16/2004 08/20/2004 Evaluation of Changes, Tests, or Experiments IP 7111102 1
Baseline Inspections 08/16/2004 08/20/2004 Permanent Plant Modifications IP 7111117B 1
1 71121
- OCC RAD SAFETY Baseline Inspections 08/23/2004 08/27/2004 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 08/23/2004 08/27/2004 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 08/23/2004 08/27/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
Baseline Inspections 08/23/2004 08/27/2004 Performance Indicator Verification IP 71151 1
2 11/1 EXM
- OPERATOR LICENSING EXAM - UPGRADE Not Applicable 11/01/2004 11/03/2004 GINNA INITIAL EXAM (4/5-9/04)
U01571 1
1 71121
- OCC RAD SAFETY Baseline Inspections 10/04/2004 10/08/2004 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 10/04/2004 10/08/2004 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 10/04/2004 10/08/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
Baseline Inspections 10/04/2004 10/08/2004 Performance Indicator Verification IP 71151 1
4 71152B
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 10/18/2004 10/22/2004 Identification and Resolution of Problems IP 71152B 1
Baseline Inspections 11/01/2004 11/05/2004 Identification and Resolution of Problems IP 71152B 1
2 7111108P
- INSERVICE INSPECTION Baseline Inspections 03/28/2005 04/01/2005 Inservice Inspection Activities - PWR IP 7111108P 1
1 71121
- OCC RAD SAFETY Baseline Inspections 03/28/2005 04/01/2005 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 03/28/2005 04/01/2005 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 03/28/2005 04/01/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
Baseline Inspections 03/28/2005 04/01/2005 Performance Indicator Verification IP 71151 1
6 7111121
- SSDI Baseline Inspections 05/09/2005 05/13/2005 Safety System Design and Performance Capability IP 7111121 1
Baseline Inspections 05/23/2005 05/27/2005 Safety System Design and Performance Capability IP 7111121 1
1 7111112B
- MAINTENANCE RULE Baseline Inspections 05/16/2005 05/20/2005 Maintenance Effectiveness IP 7111112B 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Ginna Inspection / Activity Plan 07/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2004 10:34:12 Report 22 1
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 05/16/2005 05/20/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1
1 7111401
- EXERCISE EVALUATION & EP PI VERIFICATION Baseline Inspections 07/18/2005 07/22/2005 Exercise Evaluation IP 7111401 1
Baseline Inspections 07/18/2005 07/22/2005 Performance Indicator Verification IP 71151 1
1 71121
- OCC RAD SAFETY Baseline Inspections 08/15/2005 08/19/2005 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 08/15/2005 08/19/2005 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 08/15/2005 08/19/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
Baseline Inspections 08/15/2005 08/19/2005 Performance Indicator Verification IP 71151 1
2 7111111B
- LO REQUALIFICATION INSPECTION Baseline Inspections 11/13/2005 11/17/2005 Licensed Operator Requalification Program IP 7111111B 1
1 71121
- OCC RAD SAFETY Baseline Inspections 12/12/2005 12/16/2005 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 12/12/2005 12/16/2005 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 12/12/2005 12/16/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
Baseline Inspections 12/12/2005 12/16/2005 Performance Indicator Verification IP 71151 1
1 71121
- OCC RADIATION SAFETY Baseline Inspections 03/20/2006 03/24/2006 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 03/20/2006 03/24/2006 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 03/20/2006 03/24/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1
Baseline Inspections 03/20/2006 03/24/2006 Performance Indicator Verification IP 71151 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.