|
---|
Category:Inspection Plan
MONTHYEARIR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) IR 05000244/20220052022-08-31031 August 2022 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2022005) IR 05000244/20210062022-03-0202 March 2022 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2021006) IR 05000244/20210052021-09-0101 September 2021 Updated Inspection Plan for the R.E. Ginna Nuclear Power Plant, Llc (Report 05000244/2021005 ML21119A1082021-04-27027 April 2021 Ti 2515/194 Inspection Documentation Request IR 05000244/20200062021-03-0303 March 2021 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2020006) ML21011A0872021-01-11011 January 2021 LLC: Notification of Conduct of a Fire Protection Team Inspection IR 05000244/20200052020-08-31031 August 2020 Updated Inspection Plan for the R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2020005) IR 05000244/20190062020-03-0303 March 2020 Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2019006) IR 05000244/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 0500244/2019005) IR 05000244/20180062019-03-0404 March 2019 Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2018006) IR 05000244/20180052018-08-28028 August 2018 R. E. Ginna Nuclear Power Plant LLC Updated Inspection Plan: Inspection Report 05000244/2018005 IR 05000244/20170062018-02-28028 February 2018 Annual Assessment Letter for R. E. Ginna Nuclear Power Plant, LLC (Reports 05000244/2017006, 05000244/2017402, and 05000244/2017501) IR 05000244/20170052017-08-28028 August 2017 Updated Inspection Plan for R. E. Ginna Nuclear Power Plant - Inspection Report 05000244/2017005 IR 05000244/20160062017-03-0101 March 2017 Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant (Report 05000244/2016006) IR 05000244/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for R.E. Ginna Nuclear Power Plant, (Report 0500244/2016005) IR 05000244/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2015006) IR 05000244/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2015005) ML15170A3942015-06-17017 June 2015 Document Request for Appendix R Licensing Basis (Updated and Modified Request List of Documents from the Inspection Plan) ML15147A0042015-05-26026 May 2015 LLC - Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information (9-2015) IR 05000244/20140012015-03-0404 March 2015 2014 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2014001)(w/Inspection Plan) IR 05000244/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - R.E. Ginna Nuclear Power Plant (Report 05000244-14-006) IR 05000244/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2013001)(w/Inspection Plan) IR 05000244/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - R.E. Ginna Nuclear Power Plant (Report 05000244-13-006) IR 05000244/20120012013-03-0404 March 2013 Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant (Report 05000244/2012001) ML12244A3322012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Ginna Nuclear Power Plant IR 05000244/20110012012-03-0505 March 2012 Annual Assessment Letter (Report 05000244-11-001) ML1124207882011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - R. E. Ginna Nuclear Power Plant IR 05000244/20100012011-03-0404 March 2011 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2010001) ML1024401992010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - R.E. Ginna Nuclear Power Plant ML1016600092010-06-15015 June 2010 Pre-Inspection Cover Sheet and Inspection Plan (6/21-6/25/10) ML1006208332010-03-0303 March 2010 Annual Assessment Letter (Report 05000244-10-001) ML0924402302009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - R.E. Ginna Nuclear Power Plant, Dated 09/01/09 IR 05000244/20090012009-03-0404 March 2009 IR 05000244-09-001, Ginna Nuclear Power Plant Annual Assessment Letter, Dated 03/04/09 IR 05000244/20080012008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, R.E. Ginna, (IR 05000244-08-001) ML0806100142008-03-0303 March 2008 Annual Assessment Letter EOC 2007 ROP8 - Ginna Station (05000244/2008001) ML0734709602007-12-13013 December 2007 ROP8 - Ginna - Change to Inspection Plan, 12/13/07 ML0724309382007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - R.E. Ginna ML0706106172007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Ginna Station (05-244/2007001) ML0624304962006-08-31031 August 2006 Mid-Cycle Performance Review and Inspection Plan - R. E. Ginna Nuclear Power Plant ML0606203182006-03-0202 March 2006 2006-001 - Annual Assessment Letter - R. E. Ginna Nuclear Power Plant (Report 05-244/2006001) ML0524206822005-08-30030 August 2005 Mid-Cycle Performance Review and Inspection Plan - R. E. Ginna Nuclear Power Plant IR 05000244/20050012005-03-0202 March 2005 Annual Assessment Letter - R.E. Ginna Nuclear Power Plant (Report 05000244/2005001) ML0424408312004-08-30030 August 2004 2004 Ginna Mid-Cycle Performance Review and Inspection Plan ML0406301752004-03-0202 March 2004 2003-04 Annual Assessment Letter - Ginna ML0306200212003-03-0303 March 2003 2003 Annual Assessment Letter - R.E. Ginna Nuclear Power Plant ML0223802522002-08-26026 August 2002 2002 Ginna Mid-Cycle Performance Review and Inspection Plan 2024-08-29
[Table view] Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25
[Table view] |
Inspection Report - Ginna - 2020005 |
---|
|
|
Text
August 31, 2020
SUBJECT:
UPDATED INSPECTION PLAN FOR THE R.E. GINNA NUCLEAR POWER PLANT, LLC (Report 05000244/2020005)
Dear Mr. Hanson,
The enclosed inspection plan lists the inspections scheduled through June 30, 2022, for R.E. Ginna Nuclear Power Plant, LLC (Ginna). The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the Reactor Oversight Process (ROP), including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the May 28, 2020, memo, Inspection Guidance During Transition From COVID-19 Mandatory Telework (ML20141L766). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:
https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling. Additionally, during this period the NRC will perform inspections per Temporary Instruction (TI)
2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01), as well as Inspection Procedures (IP) 60854.1, Preoperational Testing of an Independent Spent Fuel Storage Facility Installations at Operating Plants and IP 60855.1, Operation of an ISFSI Independent Spent Fuel Storage Facility Installation at Operating Plants.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5120 with any questions you have regarding this letter.
Sincerely, X /RA/
Signed by: Erin E. Carfang Erin Carfang, Chief Projects Branch 1 Division of Reactor Projects Docket No. 50-244 License No. DPR-18 Enclosure:
Ginna Inspection Plan
ML20238C046 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CLally ECarfang DATE 8/26/20 8/31/20
IP 22 Inspection Activity Plan Report Ginna 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Material Control and Accountability - Ginna 1 1 07/13/2020 07/17/2020 IP 71130.11 000742 Material Control and Accounting (MC&A)
Access Control, Sec Training, Equipment, SPR-GN 3 1 07/20/2020 07/23/2020 IP 71130.02 000734 Access Control 1 07/20/2020 07/23/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1 07/20/2020 07/23/2020 IP 71130.07 000739 Security Training 1 07/20/2020 07/23/2020 IP 71130.09 001656 Security Plan Changes 1 07/20/2020 07/23/2020 IP 71151 001338 Performance Indicator Verification EP PROGRAM INSPECTION - GINNA 1 1 07/27/2020 07/31/2020 IP 71114.02 000717 Alert and Notification System Testing 1 07/27/2020 07/31/2020 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 07/27/2020 07/31/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 07/27/2020 07/31/2020 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 07/27/2020 07/31/2020 IP 71151 001397 Performance Indicator Verification TRIENNIAL HEAT SINK 1 1 08/17/2020 08/21/2020 IP 71111.07T 000700 Heat Sink Performance Radiation Safety - Airborne 1 1 08/17/2020 08/21/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 08/17/2020 08/21/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation ISFSI Dry Run & Initial Loading Inspection 4 1 08/24/2020 09/18/2020 IP 60854.1 000589 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1 09/21/2020 09/25/2020 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants FY2020 GINNA INITIAL OL EXAM 5 1 09/06/2020 09/12/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1 10/04/2020 10/17/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
50.59 INSPECTION 3 1 09/14/2020 09/18/2020 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments This report does not include INPO and OUTAGE activities. Page 2 of 4 This report shows only on-site and announced inspection procedures.
8/25/2020 9:07:26 AM
IP 22 Inspection Activity Plan Report Ginna 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Radwaste 1 1 09/14/2020 09/18/2020 IP 71124.08 - 2019 000732 2019 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Radiation Safety - Dose & PIV 1 1 10/05/2020 10/09/2020 IP 71124.04 000728 Occupational Dose Assessment 1 10/05/2020 10/09/2020 IP 71151 000746 Performance Indicator Verification Ginna Requal Inspection with P/F Results 2 1 11/01/2020 11/06/2020 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1 11/01/2020 11/06/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Design Basis Assurance Inspection - Programs - Power Operated Valves - Ginna Unit 1 3 1 11/02/2020 11/06/2020 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1 11/16/2020 11/20/2020 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements TI-194 Open Phase Condition Inspection - Ginna 2 1 11/30/2020 12/03/2020 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)
Radiation Safety - ALARA 1 1 04/05/2021 04/09/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls Fire Protection - Ginna 3 1 05/03/2021 05/07/2021 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1 05/17/2021 05/21/2021 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
Radiation Safety - Instrumentation 1 1 05/03/2021 05/07/2021 IP 71114.05 000720 Maintenance of Emergency Preparedness Radiation Safety - REMP 1 1 06/07/2021 06/11/2021 IP 71124.05 - 2019 000729 2019 Radiation Monitoring Instrumentation Access Control, Protective strategy, SPR, TSR 4 1 06/14/2021 06/18/2021 IP 71130.02 000734 Access Control 1 06/14/2021 06/18/2021 IP 71130.05 000737 Protective Strategy Evaluation This report does not include INPO and OUTAGE activities. Page 3 of 4 This report shows only on-site and announced inspection procedures.
8/25/2020 9:07:26 AM
IP 22 Inspection Activity Plan Report Ginna 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Access Control, Protective strategy, SPR, TSR 4 1 06/14/2021 06/18/2021 IP 71130.09 001656 Security Plan Changes 1 06/14/2021 06/18/2021 IP 71130.14 000743 Review of Power Reactor Target Sets 1 06/14/2021 06/18/2021 IP 71151 001338 Performance Indicator Verification Radiation Safety - RETS 1 1 07/12/2021 07/16/2021 IP 71124.06 - 2019 000730 2019 Radioactive Gaseous and Liquid Effluent Treatment EP Exercise Inspection - Ginna 5 1 08/23/2021 08/27/2021 IP 71114.01 000716 Exercise Evaluation 1 08/23/2021 08/27/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 08/23/2021 08/27/2021 IP 71151 001397 Performance Indicator Verification INSERVICE INSPECTION 1 1 10/10/2021 10/23/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
Radiation Safety - Radiation Hazards 1 1 10/25/2021 10/29/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Access Authorization, FFD-GN 2 1 02/07/2022 02/11/2022 IP 71130.01 000733 Access Authorization 1 02/07/2022 02/11/2022 IP 71130.08 000740 Fitness For Duty Program RADIOACTIVE SOLID WASTE PROCESSING AND RADIOACTIVE MATERIAL HANDLING, STORAGE, AND TRANSPORTATION 1 1 05/09/2022 05/13/2022 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &
Transportation EP PROGRAM INSPECTION - GINNA 1 1 06/20/2022 06/24/2022 IP 71114.02 000717 Alert and Notification System Testing 1 06/20/2022 06/24/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 06/20/2022 06/24/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 06/20/2022 06/24/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 06/20/2022 06/24/2022 IP 71151 001397 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 4 of 4 This report shows only on-site and announced inspection procedures.
8/25/2020 9:07:26 AM