Annual Assessment Letter EOC 2007 ROP8 - Ginna Station (05000244/2008001)
ML080610014
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/03/2008
From: Collins S
Region 1 Administrator
To: John Carlin
Ginna
Dentel, G RGN-I/DRP/BR1/610-337-5233
References
IR-08-001
Download: ML080610014 (7)


See also: IR 05000244/2008001

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD

KING OF PRUSSIA, PA 19406-1415

March 3, 2008

Mr. John T. Carlin

Vice President R. E. Ginna Nuclear Power Plant

R. E. Ginna Nuclear Power Plant, LLC

1503 Lake Road

Ontario, NY 14519

SUBJECT:

ANNUAL ASSESSMENT LETTER - R. E. GINNA NUCLEAR POWER PLANT

(REPORT 05000244/2008001)

Dear Mr. Carlin:

On February 12, 2008, the U.S. Nuclear Regulatory Commission (NRC) staff completed its

performance review of R. E. Ginna Nuclear Power Plant (Ginna). Our technical staff reviewed

performance indicators (PIs) for the most recent quarter and inspection results for the period

from January 1 through December 31, 2007. The purpose of this letter is to inform you of our

assessment of your safety performance during this period and our plans for future inspections at

your facility.

This performance review and enclosed inspection plan do not include security information. A

separate letter designated and marked as Official Use Only-Security Information will include

the security cornerstone review and resultant inspection plan.

Overall, Ginna operated in a manner that preserved public health and safety and fully met all

cornerstone objectives. Plant performance for the most recent quarter for Ginna was within the

Licensee Response column of the NRCs Action Matrix, based on all inspection findings being

classified as having very low safety significance (Green) and all PIs indicating performance at a

level requiring no additional NRC oversight (Green).

While plant performance for the most recent quarter was within the Licensee Response column

of the Action Matrix, Ginna was within the Degraded Cornerstone column for the 1st quarter of

2007 due to one Yellow Emergency Preparedness PI. Specifically, the Emergency Response

Organization (ERO) Drill Participation PI crossed the Yellow threshold during the 1st quarter of

2007, when Ginna staff determined that control room communicators, a key ERO position, did

not receive the required drill or exercise opportunity after qualification. The ERO PI rating

returned to Green in the 2nd quarter of 2007. The NRC has completed a supplemental

inspection in accordance with inspection procedure 95002. The results of that inspection,

conducted the weeks of January 28 and February 18, 2008, will be provided in NRC

Supplemental Inspection Report 05000244/2008502. Based on the PI rating returning to Green,

we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection,

scheduled through June 30, 2009. In addition to baseline inspections, we plan on conducting

an independent spent fuel storage installation (ISFSI) inspection and license renewal

J. Carlin

2

commitments inspection. The inspection plan is provided to allow for the resolution of any

scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. The

inspections in the last nine months of the inspection plan are tentative and may be revised at

the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

If the results of the supplemental inspection, or any other circumstances, cause us to change

the inspection plan, we will contact you to discuss the change as soon as possible. Please

contact Glenn Dentel of my staff at 610-337-5233, with any questions you may have regarding

this letter or the inspection plan.

Sincerely,

/RA/

Samuel J. Collins

Regional Administrator

Docket No. 50-244

License No. DPR-18

cc w/encl:

M. J. Wallace, President, Constellation Energy Nuclear Group, LLC

J. M. Heffley, Senior Vice President and Chief Nuclear Officer

P. Eddy, Electric Division, NYS Department of Public Service

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, Inc.

B. Weaver, Director, Licensing, Constellation Energy Nuclear Group, LLC

P. Tonko, President and CEO, New York State Energy Research and Development Authority

J. Spath, Program Director, New York State Energy Research and Development Authority

G. Bastedo, Director, Wayne County Emergency Management Office

M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness

T. Judson, Central New York Citizens Awareness Network

Institute of Nuclear Power

J. Carlin

2

commitments inspection. The inspection plan is provided to allow for the resolution of any

scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. The

inspections in the last nine months of the inspection plan are tentative and may be revised at

the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

If the results of the supplemental inspection, or any other circumstances, cause us to change

the inspection plan, we will contact you to discuss the change as soon as possible. Please

contact Glenn Dentel of my staff at 610-337-5233, with any questions you may have regarding

this letter or the inspection plan.

Sincerely,

/RA/

Samuel J. Collins

Regional Administrator

Docket No. 50-244

License No. DPR-18

cc w/encl:

M. J. Wallace, President, Constellation Energy Nuclear Group, LLC

J. M. Heffley, Senior Vice President and Chief Nuclear Officer

P. Eddy, Electric Division, NYS Department of Public Service

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, Inc.

B. Weaver, Director, Licensing, Constellation Energy Nuclear Group, LLC

P. Tonko, President and CEO, New York State Energy Research and Development Authority

J. Spath, Program Director, New York State Energy Research and Development Authority

G. Bastedo, Director, Wayne County Emergency Management Office

M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness

T. Judson, Central New York Citizens Awareness Network

Institute of Nuclear Power

DISTRIBUTION

See next page

SUNSI Review Complete: BAB (Reviewer=s Initials)

DOCUMENT NAME: S:\\ROP-8 EOC Review\\Annual Assessment Letters\\Branch 1\\GINNA Annual Assessment Ltr.doc

After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE

RI/DRP

RI/DRP

RI/DRP

ORA

NAME

  • BBickett/BAB4
  • GDentel/GTD
  • DLew/DCL

SCollins/SJC

DATE

02/25/08

02/25/08

02/28/08

02/29/08

OFFICIAL RECORD COPY

  • see previous concurrence page

J. Carlin

3

Distribution w/encl:

S. Collins, RA

M. Dapas, DRA

G. West, RI OEDO (Acting)

J. Lubinski, NRR

D. Pickett, PM, NRR

M. David, PM, NRR

G. Dentel, DRP

K. Kolaczyk, Senior Resident Inspector

M. Marshfield, Resident Inspector

M. Rose, DRP, OA

Region I Docket Room (with concurrences)

ROPreports@nrc.gov (All IRs)

J. Trapp, DRS

J. Rogge, DRS

S. Hansell, DRS

J. White, DRS

L. Doerflein, DRS

R. Conte, DRS

L. Scholl, DRS

P. Frechette, DRS

D. Silk, DRS

D. Screnci, PAO

N. Sheehan, PAO

R. Barkley, ORA

D. Holody, ORA

J. Thompson, NRR (JWT1@nrc.gov)

Ginna

Inspection / Activity Plan

01/01/2008 - 06/30/2009

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 1 of 3

02/28/2008

15:46:00

Report 22

3

95002

- 95002 SUPPLEMENTAL INSP FOR EP PI

EP Supplemental Inspec

Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Performance

Area

01/28/2008

02/01/2008

1

95002

IP

EP Supplemental Inspec

Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Performance

Area

02/18/2008

02/22/2008

1

95002

IP

1

ISFSI

- ISFSI INSPECTION

Other Routine

Operation of an Independent Spent Fuel Storage Installation at Operating Plants

01/28/2008

10/31/2008

1

60855.1

IP

1

71121

- OCC RAD SAFETY

Baseline Inspections

Access Control to Radiologically Significant Areas

02/11/2008

02/15/2008

1

7112101

IP

Baseline Inspections

ALARA Planning and Controls

02/11/2008

02/15/2008

1

7112102

IP

Baseline Inspections

Performance Indicator Verification

02/11/2008

02/15/2008

1

71151

IP

1

7111108P

- INSERVICE INSPECTION

Baseline Inspections

Inservice Inspection Activities - PWR

04/21/2008

04/25/2008

1

7111108P

IP

1

TI-172

- TI-172 RCS DISSIMILIAR METAL WELDS

Generic Safety Inspectio

Reactor Coolant System Dissimiliar Metal Butt Welds

04/21/2008

04/25/2008

1

2515/172

IP

1

7111108P

- INSERVICE INSPECTION

Baseline Inspections

Inservice Inspection Activities - PWR

04/28/2008

05/02/2008

1

7111108P

IP

3

LR

- LR COMMITMENTS

License Renewal Inspec

Post-Approval Site Inspection for License Renewal

04/28/2008

05/02/2008

1

71003

IP

5

8/25 EXM

- INITIAL OPERATOR LICENSING EXAM

Not Applicable

FY08 - GINNA INITIAL OPERATOR EXAM

07/14/2008

07/18/2008

1

U01687

Not Applicable

FY08 - GINNA INITIAL OPERATOR EXAM

08/25/2008

09/05/2008

1

U01687

1

71121

- OCC RAD SAFETY

Baseline Inspections

Access Control to Radiologically Significant Areas

04/28/2008

05/02/2008

1

7112101

IP

Baseline Inspections

ALARA Planning and Controls

04/28/2008

05/02/2008

1

7112102

IP

Baseline Inspections

Radiation Monitoring Instrumentation and Protective Equipment

04/28/2008

05/02/2008

1

7112103

IP

Baseline Inspections

Performance Indicator Verification

04/28/2008

05/02/2008

1

71151

IP

1

TI-166

- CONTAINMENT SUMP MODIFICATIONS

Safety Issues

Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

04/28/2008

05/02/2008

1

2515/166

IP

4

MODS

- PERMANENT PLANT MODIFICATIONS

Baseline Inspections

Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications

06/09/2008

06/13/2008

1

7111117B

IP

Baseline Inspections

Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications

06/23/2008

06/27/2008

1

7111117B

IP

2

EP

- EP PROGRAM INSPECTION

EP Baseline Inspection

Alert and Notification System Testing

06/02/2008

06/06/2008

1

7111402

IP

EP Baseline Inspection

Emergency Response Organization Augmentation Testing

06/02/2008

06/06/2008

1

7111403

IP

EP Baseline Inspection

Emergency Action Level and Emergency Plan Changes

06/02/2008

06/06/2008

1

7111404

IP

EP Baseline Inspection

Correction of Emergency Preparedness Weaknesses and Deficiencies

06/02/2008

06/06/2008

1

7111405

IP

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Ginna

Inspection / Activity Plan

01/01/2008 - 06/30/2009

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 2 of 3

02/28/2008

15:46:00

Report 22

2

EP

- EP PROGRAM INSPECTION

Baseline Inspections

Drill/Exercise Performance

06/02/2008

06/06/2008

1

71151-EP01

IP

Baseline Inspections

ERO Drill Participation

06/02/2008

06/06/2008

1

71151-EP02

IP

Baseline Inspections

Alert & Notification System

06/02/2008

06/06/2008

1

71151-EP03

IP

1

7111107B

- HEAT SINK INSP

Baseline Inspections

Heat Sink Performance

07/21/2008

07/25/2008

1

7111107B

IP

1

7112202

- PUB RAD SAFETY - RADWASTE

Baseline Inspections

Radioactive Material Processing and Transportation

07/21/2008

07/25/2008

1

7112202

IP

Baseline Inspections

Performance Indicator Verification

07/21/2008

07/25/2008

1

71151

IP

4

71152B

- PI&R

Baseline Inspections

Identification and Resolution of Problems

09/08/2008

09/12/2008

1

71152B

IP

Baseline Inspections

Identification and Resolution of Problems

09/22/2008

09/26/2008

1

71152B

IP

1

7112203

- PUB RAD SAFETY - REMP

Baseline Inspections

Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program

09/15/2008

09/19/2008

1

7112203

IP

Baseline Inspections

Performance Indicator Verification

09/15/2008

09/19/2008

1

71151

IP

1

71121

- OCC RAD SAFETY

Baseline Inspections

Access Control to Radiologically Significant Areas

11/17/2008

11/21/2008

1

7112101

IP

Baseline Inspections

ALARA Planning and Controls

11/17/2008

11/21/2008

1

7112102

IP

Baseline Inspections

Radiation Monitoring Instrumentation and Protective Equipment

11/17/2008

11/21/2008

1

7112103

IP

Baseline Inspections

Performance Indicator Verification

11/17/2008

11/21/2008

1

71151

IP

3

TI 171

- TI 171

Generic Safety Inspectio

Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies

11/17/2008

11/21/2008

1

2515/171

IP

3

7111111B

- BIENNIAL REQUAL INSPECTION

Baseline Inspections

Licensed Operator Requalification Program

01/12/2009

01/16/2009

1

7111111B

IP

1

71121

- OCC RAD SAFETY

Baseline Inspections

Access Control to Radiologically Significant Areas

02/16/2009

02/20/2009

1

7112101

IP

Baseline Inspections

ALARA Planning and Controls

02/16/2009

02/20/2009

1

7112102

IP

Baseline Inspections

Radiation Monitoring Instrumentation and Protective Equipment

02/16/2009

02/20/2009

1

7112103

IP

Baseline Inspections

Performance Indicator Verification

02/16/2009

02/20/2009

1

71151

IP

1

7112103

- OCC RAD SAFETY - INSTRUMENTS

Baseline Inspections

Radiation Monitoring Instrumentation and Protective Equipment

04/13/2009

04/17/2009

1

7112103

IP

2

EP EXER

- EP EXERCISE INSPECTION & PI VERIFICATION

EP Baseline Inspection

Exercise Evaluation

05/03/2009

05/09/2009

1

7111401

IP

EP Baseline Inspection

Emergency Action Level and Emergency Plan Changes

05/03/2009

05/09/2009

1

7111404

IP

Baseline Inspections

Performance Indicator Verification

05/03/2009

05/09/2009

1

71151

IP

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Ginna

Inspection / Activity Plan

01/01/2008 - 06/30/2009

Inspection

Type

Inspection Activity

Planned Dates

Start End

No. of Staff

on Site

Title

Unit

Number

Page 3 of 3

02/28/2008

15:46:00

Report 22

1

7112201

- PUB RAD SAFETY - RETS

Baseline Inspections

Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems

05/25/2009

05/29/2009

1

7112201

IP

Baseline Inspections

Performance Indicator Verification

05/25/2009

05/29/2009

1

71151

IP

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.