IR 05000244/2022011

From kanterella
Jump to navigation Jump to search
R. E. Ginna Nuclear Power Plant, LLC - Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000244/2022011
ML21350A040
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/16/2021
From: Glenn Dentel
NRC/RGN-I/DORS
To: Rhoades D
Exelon Generation Co LLC, Exelon Nuclear
Dentel G
References
IR 2022011
Download: ML21350A040 (8)


Text

December 16, 2021

Mr. David P. Rhoades Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: R.E. GINNA NUCLEAR POWER PLANT, LL C - INFORMATION REQUEST FO R THE CYBER SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000244/2022011

Dear Mr. Rhoades :

On April 25, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber Security, Revision 0 at your R.E. Ginna Nuclear Power Plant. The inspection will be performed to evaluate and verify your ability to meet the requirements of the NRCs Cyber Security Rule, Title 10 of th e Code of Federal Regulations (CFR), Part 73, Section 54, Protection of Digital Computer and Communication Systems and Network The onsite portion of the inspection will take place April 25 - 29, 202 Experience has shown that bas eline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staf In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspectio These documents have been divided into four group The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., sam ple set ) to be inspected by IP 71130.1 This informatio n should be made available either on an online repository (preferred) or digital media (CD/DVD) no later than January 31, 202 The inspection team will review this information and, by February 28, 2022, will request the specific item s that should be provided for review.

The se co nd group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of the licensees Cyber Security Program selected for the cyber security inspectio This inform ation will be requested for review in the regional office prior to the inspection by March 28, 2022, as identified abov The third group of requested documents consists of those items that the inspection team will review, or need access to, during the inspectio Please have this information available by the first day of the onsite inspection, April 25, 2022.

D. Rhoades 2

The fourth group of information is necessary to aid the inspection team in tracking issues identified as a result of the inspectio It is requested that this information be provided to the lead inspector as the information is generated during the inspectio It is important that all of these documents are up to date and complete in o rder to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspectio The lead inspector for this inspection is Brandon Pinson. We understand that our regulatory contact for this inspection is Ann Walter of your organizatio If there are any questions about the inspection or the material requested, please contact the lead inspector at 610-337-5091 or via e-mail at brandon.pinson@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-001 The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the reques ting document displays a currently valid Office of Management and Budget control numbe In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web s ite at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety

Docket N License N DPR-18

Enclosure:

Cyber Security Inspection Document Request

cc: Distribution via ListServ

D. Rhoades 3

SUBJECT: R.E. GINNA NUCLEAR POWER PLANT, LLC - INFORMATION REQUEST FOR THE CYBER SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000244/2022011 DATED DECEMBER 16, 2021

DISTRIBUTION:

ECarfang, DORS SHaney, DORS JHawkins, DORS CDukehart, DORS JSchussler, DORS, SRI SMonarque, DORS, RI ACass, DORS, AA RWilliams, RI, OEDO RidsNrrPMREGinna Resource RidsNrrDorlLpl1 Resource

DOCUMENT NAME: https://usnrc.sharepoint.com/teams/EngineeringBranch2/Shared Documents/Cyber Security/_Baseline Inspections/2022/Ginna/Inspection Prep/Ginna Cyber Security RFI 1.docx ADAMS ACCESSION NUMBER: ML21350A040 SUNSI Review n -Sensitive Publ Available Sensite n -Publ Avaible

OFFICE RI/DO RI/DO ME BPinson GDt TE 12// 12//

OFFICIAL CORD CO

R.E. GINNA NUCLEAR POWER PLANT, LLC CYBER SECURITY INSPECTION DOCUMENT REQUEST

Inspection Report: 05000244/2022011

Inspection Dates: April 25 - 29, 2022

Inspection Procedure: IP 71130.10, Cyber Security, Revision 0

Reference: ML21330A088, Guidance Document for Development of the Request for Information (RFI) and Notification Letter for Full-Implementation of the Cyber Security Inspection, Revision 2

NRC Inspectors: Brandon Pinson, Lead Louis Dum ont 610-337-5091 610-337-5183 brandon.pinson@nrc.gov louis.dumont@nrc.gov

NRC Contractors: Alan Konkal TBD alan.konkal@nrc.gov Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate components and Cyber Security Program ( CSP) elements to develop a site-specific inspection pla The first RFI is used to identify the list of crit ical systems and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control portions of the CSP to be chosen as the sample set required to be inspected by the cyber security inspection procedur The first RFIs requested information is specified below in Table RFI # Th e Table RFI #1 information is requested to be provided to the regional office by January 31, 2022, or sooner, to facilitate the selection of the specific items that will be reviewed during the onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused follow -up request to develop th e second RF The inspection team will su bm it the specific system s and equipm ent list to your staff by February 28, 2022, which will identify th e specific system s and equipm ent that will be utilized to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the cyber security inspectio We request that t he additional information provided from the second RFI be made avail able to the regional office prior to the inspection by March 28, 202 Enclosure R.E. GINNA NUCLEAR POWER PLANT, LLC CYBER SECURITY INSPECTION DOCUMENT REQUEST

The required Table RFI 1 information shall be provided on an online repository (preferred) or digital media (CD/DVD) to the lead inspector by January 31, 202 Th e preferred file form at for all lists is a searchable Excel spreadsheet file. The inform ation should be indexed and hyper -linked to facilitate ease of us If you have any questions regarding this information, please call the inspection team leader as soon as possibl Table RFI #1 Section 3, Paragraph Number/Title: IP Ref A list of all Identified Critical Systems and Critical Digital Assets -

1 highlight/note any additions, deletions or reclassifications due to new Overall guidance from white papers, changes to NEI 10-04, 13-10, etc. since the last cyber security inspectio A list of EP and Security onsite and offsite digital communication systems Overall 3 Network Topology Diagrams to include information and data flow for Overall critical systems in levels 2, 3 and 4 (If available)

4 Ongoing Monitoring and Assessment program documentation 03.01(a)

5 The most recent effectiveness analysis of the Cyber Security Program 03.01(b)

6 Vulnerability screening/assessment and scan program documentation 03.01(c)

Cyber Security Incident response documentation, including incident detection, response, and recovery documentation as well as contingency 03.02(a)

7 plan development and implementation, including any program and documentation tha t requires testing of security bou nd ary device 03.04(b)

functionality 8 Device Access and Key Control documentation 03.02(c)

9 Password/Authenticator documentation 03.02(c)

10 User Account/Credential documentation 03.02(d)

11 Portable Media and Mobile Device control documenta tion, including kiosk 03.02(e)

security control assessment/documentation Design change/ modification program documentation and a List of all 12 design changes completed since the last cyber securi ty inspection, including 03.03(a)

either a summary of the design change or the 50.59 do cumentation for the chang.03(a),

13 Supply Chain Management documentation including any security impact analysis for new acquisitions (b) and (c)

14 Configuration Management documentation including any security impact 03.03(a)

analysis performed due to configuration changes since the last inspection and (b)

15 Cyber Security Plan and any 50.54(p) analysis to suppo rt changes to the 03.04(a)

plan since the last inspection 16 Cyber Security Metrics tracked (if applicable) 03.06 (b)

17 Provide documentation describing any cyber security changes to the a ccess Overall authorization program since the last cyber se curity inspectio Provide a list of all procedures and policies provided to the NRC with their Overall descriptive name and associated number (if available)

19 Performance testing report (if applicable) 03.06 (a)

R.E. GINNA NUCLEAR POWER PLANT, LLC CYBER SECURITY INSPECTION DOCUMENT REQUEST

In addition to the above information please provide the following:

(1) Electronic copy of the UFSAR and technical specification (2) Name(s) and phone numbers for the regulatory and technical contact (3) Current management and engineering organizational chart Based on this information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and subm it a list of specific system s and equipm ent to your staff by February 28, 2022 for the second RFI (i.e., RFI #2).

I Additional Information Requested to be Available Prior to Inspectio As stated in Section I above, the inspection team will exam ine the returned documentation requested f ro m Table RFI #1 and submit the list of sp e cif ic systems and equipm ent to your staff by February 28, 2022 fo r th e second RFI (i.e., RFI #2). Th e second RFI will request additional information required to evaluate the CSs /CDAs, defensive architecture, and the areas of the licensees CSP selected for the cyber security inspectio The additional information requested for the specific systems and equipm ent is identified in Table RFI # The Table RFI 2 information shall be provided to the lead inspector by March 28, 202 The preferred file format for all lists is a searchable Excel spreadshee The information should be indexed and hyper -linked to facilitate ease of us If you have any questions regarding this information, please call the inspection team leader as soon as possibl Table RFI #2 Section 3, Paragraph Number/Title: Items For the system(s) chosen f or inspection provide:

1 Ongoing Monitoring and Assessment activity performed on the system(s) 03.01(a)

2 All Security Control Assessments for the selected system(s) 03.01(a)

All vulnerability screenings/assessments associated with or scans 3 performed on the selected system(s) since the last cyber securi ty 03.01(c)

inspection Documentation (including configuration files and rules sets) for Network-4 based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-based 03.02(b)

Intrusion Detection Systems (HIDS), and Security Information and Event Management (SIEM) systems for system(s) chosen for inspection)

Documentation (including configuration files and rule sets) for intra-5 security level firewalls and boundary devices used to p rotect the selected 03.02(c)

system(s)

6 Copies of all periodic reviews of the access authorizati on list for the 03.02(d)

selected systems since the last inspection 7 Baseline configuration data sheets for the selected CDAs 03.03(a)

8 Documentation on any changes, including Security Impact Analyses, 03.03(b)

performed on the selected system(s) since the last ins pection

R.E. GINNA NUCLEAR POWER PLANT, LLC CYBER SECURITY INSPECTION DOCUMENT REQUEST

Table RFI #2 Section 3, Paragraph Number/Title: Items 9 Copies of the purchase order d ocumentation for any n ew equipment 03.03(c)

purchased for the selected systems since the last inspe ction 10 Copies of any reports/assessment for cyber security dr ills performed since 03.02(a)

the last inspectio.04(b)

11 Copy of the individual recovery plan(s) for the selected system(s) including 03.02(a)

documentation of the results the last time the backups were execute.04(b)

Corrective actions taken as a result of cyber security incidents/issues to 12 include previous NRC violations and Licensee Identified Violations since 03.04(d)

the last cyber security inspection

II Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identi fied in Section II above, provide the following RFI (i.e., Table 1ST Week Onsite) to the team b y April 25, 2022, the first day of the inspection.

Table 1ST Week Onsite Section 3, Paragraph Number/Title: Items 1 Any cyber security event reports submitted in accorda nce with 10 CFR 03.04(a)

73.77 since the last cyber security inspection Updated Copies of corrective actions taken as a result of cyber security 2 incidents/issues, to include previous NRC violations and Licensee 03.04(d)

Identified Violations since the last cyber security inspection, as well as vulnerability-related corrective actions

In addition to the above information please provide the following:

(1) Copies o f the following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to th em. Updated Final Safety Analysis Report, if not previously provided; Original FSAR Volumes; Original SER and Supplements; Quality Assurance Plan; Technical Specifications, if not previously provided; Latest IPE/PRA Report; and

R.E. GINNA NUCLEAR POWER PLANT, LLC CYBER SECURITY INSPECTION DOCUMENT REQUEST

(2) Vendor Manuals, A sse ssm en t and Corrective Actions: The most recent Cyber Security Quality A ssurance (QA) audit and/or self-assessment; and Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent Cyber Security Quality Assurance (QA) audit and/or self -assessmen I Information Requested T o Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the inspection teams questions or queries during the inspectio (2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection team leade