UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2006 Ms. Mary G. Korsnick Vice President R. E. Ginna Nuclear Power Plant R. E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - R. E. GINNA NUCLEAR POWER PLANT
Dear Ms. Korsnick:
On August 9, 2006, the NRC staff completed its performance review of R. E. Ginna Nuclear Power Plant for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter at Ginna was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan to conduct several infrequent ROP inspections to assess activities related to your power uprate.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
2 M. Korsnick If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Brian J. McDermott, Chief Projects Branch 1 Division of Reactor Projects Docket No. 50-244 License No. DPR-18
Enclosure:
R. E. Ginna Inspection / Activity Plan cc w/encl:
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, Inc.
P. R. Smith, New York State Energy Research and Development Authority J. Spath, SLO Designee New York State Energy Research and Development Authority T. Wideman, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness T. Judson, Central New York Citizens Awareness Network
2 M. Korsnick If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Brian J. McDermott, Chief Projects Branch 1 Division of Reactor Projects Docket No. 50-244 License No. DPR-18
Enclosure:
R. E. Ginna Inspection / Activity Plan Distribution w/encl:
(via E-mail)
S. Collins, RA M. Dapas, DRA B. Sosa, RI OEDO R. Laufer, NRR J. Boska, PM, NRR B. McDermott, DRP A. Burritt, DRP K. Kolaczyk, DRP, SRI M. Marshfield, DRP, Resident Inspector S. DiMora, DRP, Resident OA Region I Docket Room (with concurrences)
D. Screnci, PAO N. Sheenhan, PAO DRS Director DRS Deputy Director DRS Branch Chiefs RidsNrrDiplipb@nrs.gov Institute of Nuclear Power Operations (INPO)
SUNSI Review Complete: BJM (Reviewers Initials)
DOCUMENT NAME: S:\\ROP 7 Mid Cycle Review\\2006 ROP7 Mid-Cycle Letters\\Ginna ROP-7 Mid-Cycle Ltr.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME Kkolaczyk/ALB FOR ABurritt BMcDermott DATE 08/25/06 08/25/06 08/28/06 OFFICIAL RECORD COPY
Ginna Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 08/31/2006 09:33:05 Report 22 3
8/28 EXM
- OPERATOR LICENSING INITIAL EXAMS Not Applicable 07/18/2006 07/22/2006 1
U01658 FY06 - GINNA INITIAL OPERATOR EXAM Not Applicable 08/28/2006 09/01/2006 1
U01658 FY06 - GINNA INITIAL OPERATOR EXAM 2
7111107B
- HEAT SINK Baseline Inspections 07/10/2006 07/14/2006 1
7111107B IP Heat Sink Performance 4
- PI&R Baseline Inspections 08/14/2006 08/18/2006 1
71152B IP Identification and Resolution of Problems Baseline Inspections 08/28/2006 09/01/2006 1
71152B IP Identification and Resolution of Problems 3
MODS
- MODS AND 50.59 Baseline Inspections 08/07/2006 08/11/2006 1
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 08/07/2006 08/11/2006 1
7111117B IP Permanent Plant Modifications 3
71004
- POWER UPRATE Other Routine 09/01/2006 09/30/2006 1
71004 IP Power Uprate 3
71004
- POWER UPRATE Other Routine 10/01/2006 12/31/2006 1
71004 IP Power Uprate 1
7111108P
- INSERVICE INSPECTION Baseline Inspections 10/10/2006 10/13/2006 1
7111108P IP Inservice Inspection Activities - PWR Baseline Inspections 10/16/2006 10/20/2006 1
7111108P IP Inservice Inspection Activities - PWR 2
71121
- OCC RAD SAFETY Baseline Inspections 10/16/2006 10/20/2006 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/16/2006 10/20/2006 1
7112102 IP ALARA Planning and Controls Baseline Inspections 10/16/2006 10/20/2006 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 10/16/2006 10/20/2006 1
71151 IP Performance Indicator Verification 1
TI-166
- TI 166 CONTAINMENT SUMP MODS INSPECTION Safety Issues 10/23/2006 10/27/2006 1
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
3 7111111B
- LO REQUAL. PROG. + P/F REVIEW Baseline Inspections 01/22/2007 01/26/2007 1
7111111B IP Licensed Operator Requalification Program Baseline Inspections 01/29/2007 02/02/2007 1
7111111B IP Licensed Operator Requalification Program 2
7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections 10/30/2006 11/03/2006 1
7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/30/2006 11/03/2006 1
71151 IP Performance Indicator Verification 2
TI-169
- MITIGATING SYSTEMS PERF IND TEMP INST Safety Issues 11/06/2006 11/17/2006 1
2515/169 IP Mitigating Systems Performance Index Verification 1
71004
- POWER UPRATE - EC/FAC Other Routine 11/13/2006 11/17/2006 1
71004 IP Power Uprate This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Ginna Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 08/31/2006 09:33:05 Report 22 1
71121
- OCC RAD SAFETY Baseline Inspections 11/27/2006 12/01/2006 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/27/2006 12/01/2006 1
7112102 IP ALARA Planning and Controls Baseline Inspections 11/27/2006 12/01/2006 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 11/27/2006 12/01/2006 1
71151 IP Performance Indicator Verification 1
71121
- OCC RAD PROT Baseline Inspections 03/19/2007 03/23/2007 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/19/2007 03/23/2007 1
7112102 IP ALARA Planning and Controls Baseline Inspections 03/19/2007 03/23/2007 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 03/19/2007 03/23/2007 1
71151 IP Performance Indicator Verification 1
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 05/14/2007 05/18/2007 1
7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 05/14/2007 05/18/2007 1
71151 IP Performance Indicator Verification 4
7111401
- EP EXERCISE & PI VERIFICATION Baseline Inspections 05/21/2007 05/25/2007 1
7111401 IP Exercise Evaluation Baseline Inspections 05/21/2007 05/25/2007 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 05/21/2007 05/25/2007 1
71151-EP02 IP ERO Drill Participation Baseline Inspections 05/21/2007 05/25/2007 1
71151-EP03 IP Alert & Notification System 1
71121
- OCC RAD SAFETY Baseline Inspections 07/09/2007 07/13/2007 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/09/2007 07/13/2007 1
7112102 IP ALARA Planning and Controls Baseline Inspections 07/09/2007 07/13/2007 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 07/09/2007 07/13/2007 1
71151 IP Performance Indicator Verification 6
7111121
- CDBI Baseline Inspections 08/13/2007 08/17/2007 1
7111121 IP Component Design Bases Inspection Baseline Inspections 08/27/2007 08/31/2007 1
7111121 IP Component Design Bases Inspection Baseline Inspections 09/10/2007 09/14/2007 1
7111121 IP Component Design Bases Inspection Baseline Inspections 09/17/2007 09/21/2007 1
7111121 IP Component Design Bases Inspection 1
71121
- OCC RAD SAFETY Baseline Inspections 11/12/2007 11/16/2007 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/12/2007 11/16/2007 1
7112102 IP ALARA Planning and Controls Baseline Inspections 11/12/2007 11/16/2007 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 11/12/2007 11/16/2007 1
71151 IP Performance Indicator Verification 1
3/16EXAM
- OPERATOR LICENSING INITIAL EXAM Not Applicable 02/17/2008 02/21/2008 1
U01687 FY08 - GINNA INITIAL OPERATOR EXAM This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Ginna Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 08/31/2006 09:33:05 Report 22 1
3/16EXAM
- OPERATOR LICENSING INITIAL EXAM Not Applicable 03/16/2008 03/20/2008 1
U01687 FY08 - GINNA INITIAL OPERATOR EXAM 1
71121
- OCC RAD SAFETY Baseline Inspections 02/11/2008 02/15/2008 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/11/2008 02/15/2008 1
7112102 IP ALARA Planning and Controls Baseline Inspections 02/11/2008 02/15/2008 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 02/11/2008 02/15/2008 1
71151 IP Performance Indicator Verification 3
7/12 ESM
- OPERATOR LICENSING INITIAL EXAMS Not Applicable 02/18/2008 02/22/2008 1
U01687 FY08 - GINNA INITIAL OPERATOR EXAM Not Applicable 03/17/2008 03/21/2008 1
U01687 FY08 - GINNA INITIAL OPERATOR EXAM 1
71121
- OCC RAD SAFETY Baseline Inspections 03/31/2008 04/04/2008 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/31/2008 04/04/2008 1
7112102 IP ALARA Planning and Controls Baseline Inspections 03/31/2008 04/04/2008 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 03/31/2008 04/04/2008 1
71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.