2006-001 - Annual Assessment Letter - R. E. Ginna Nuclear Power Plant (Report 05-244/2006001)
ML060620318
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/02/2006
From: James Trapp
Reactor Projects Branch 1
To: Korsnick M
Ginna
Trapp J RGN-I/DRP/PB1/610-337-5186
References
IR-06-001
Download: ML060620318 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 2, 2006 Ms. Mary G. Korsnick Vice President R. E. Ginna Nuclear Power Plant R. E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519

SUBJECT:

ANNUAL ASSESSMENT LETTER - R. E. GINNA NUCLEAR POWER PLANT (REPORT 05000244/2006001)

Dear Ms. Korsnick:

On February 8, 2006, the NRC staff completed its performance review of R. E. Ginna Nuclear Power Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2005. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the physical protection review and resultant inspection plan.

Overall, Ginna operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2007. Planned inspections include power uprate. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

M. Korsnick 2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Brian McDermott at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

James M. Trapp, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket No. 50-244 License Nos. DPR-18

Enclosure:

R. E. Ginna Inspection/ Activity Plan cc w/encl:

M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, Inc.

P. R. Smith, New York State Energy Research and Development Authority J. Spath, SLO Designee New York State Energy Research and Development Authority T. Wideman, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness T. Judson, Central New York Citizens Awareness Network

M. Korsnick 3 Distribution w/encl: (via E-mail)

S. Collins, RA M. Dapas, DRA B. Holian, DRP A. Blough, DRS D. Lew, DRP M. Gamberoni, DRS B. Sosa, RI OEDO R. Laufer, NRR P. Milano, PM, NRR J. Boska, (Backup PM), NRR J. Trapp, DRP B. McDermott, DRP C. Khan, DRP K. Kolaczyk, DRP, Senior Resident Inspector M. Marshfield, DRP, Resident Inspector S. DiMora, DRP, Resident OA D. Screnci, ORA N. Sheehan, ORA DRS Branch Chiefs Institute of Nuclear Power Operations (INPO)

RidsNrrDirsIpab@nrc.gov ROPreports@nrc.gov (All IRs)

Region I Docket Room (with concurrences)

DOCUMENT NAME: S:\ROP-6 EOC Review\ROP-6 Annual Assessment Letters\GIN EOC.wpd SISP Review Complete: JMT (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME KKolaczyk/JMT for CKhan/JMT for JTrapp/JMT DATE 02/28/06 02/28/06 02/28/06 OFFICIAL RECORD COPY

Page 1 of 3 Ginna 03/02/2006 16:17:15 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RADIATION SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/20/2006 03/24/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 03/20/2006 03/24/2006 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/20/2006 03/24/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 03/20/2006 03/24/2006 Baseline Inspections 71114 - EP PRGM INSP & PI VERIFICATION 1 1 IP 7111402 Alert and Notification System Testing 04/03/2006 04/07/2006 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 04/03/2006 04/07/2006 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/03/2006 04/07/2006 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/03/2006 04/07/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/03/2006 04/07/2006 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 05/08/2006 05/12/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 05/08/2006 05/12/2006 Baseline Inspections TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 4 1 IP 7111105T Fire Protection [Triennial] 06/05/2006 06/09/2006 Baseline Inspections 1 IP 7111105T Fire Protection [Triennial] 06/19/2006 06/23/2006 Baseline Inspections 7/17 EXM - OPERATOR LICENSING INITIAL EXAMS 3 1 U01658 FY06 - GINNA INITIAL OPERATOR EXAM 06/26/2006 06/30/2006 Not Applicable 1 U01658 FY06 - GINNA INITIAL OPERATOR EXAM 07/17/2006 07/21/2006 Not Applicable 7111107B - HEAT SINK 2 1 IP 7111107B Heat Sink Performance 07/24/2006 07/28/2006 Baseline Inspections 71152B - PI&R 4 1 IP 71152B Identification and Resolution of Problems 08/14/2006 08/18/2006 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 08/28/2006 09/01/2006 Baseline Inspections MODS - MODS AND 50.59 2 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 08/07/2006 08/11/2006 Baseline Inspections 1 IP 7111117B Permanent Plant Modifications 08/07/2006 08/11/2006 Baseline Inspections 71004 - POWER UPRATE 3 1 IP 71004 Power Uprate 09/01/2006 09/30/2006 Other Routine 71004 - POWER UPRATE 3 1 IP 71004 Power Uprate 10/01/2006 12/31/2006 Other Routine 7111108P - INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/10/2006 10/13/2006 Baseline Inspections 1 IP 7111108P Inservice Inspection Activities - PWR 10/16/2006 10/20/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Ginna 03/02/2006 16:17:15 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 10/16/2006 10/20/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 10/16/2006 10/20/2006 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 10/16/2006 10/20/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 10/16/2006 10/20/2006 Baseline Inspections 7112202 - PUB RAD SAFETY - RADWASTE 1 1 IP 7112202 Radioactive Material Processing and Transportation 10/30/2006 11/03/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 10/30/2006 11/03/2006 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 11/27/2006 12/01/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 11/27/2006 12/01/2006 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 11/27/2006 12/01/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 11/27/2006 12/01/2006 Baseline Inspections 7111111B - LO REQUAL. PROG. + P/F REVIEW 4 1 IP 7111111B Licensed Operator Requalification Program 01/22/2007 01/26/2007 Baseline Inspections 1 IP 7111111B Licensed Operator Requalification Program 01/29/2007 02/02/2007 Baseline Inspections 71121 - OCC RAD PROT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/19/2007 03/23/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 03/19/2007 03/23/2007 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/19/2007 03/23/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 03/19/2007 03/23/2007 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 05/07/2007 05/11/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 05/07/2007 05/11/2007 Baseline Inspections 7111401 - EP EXERCISE & PI VERIFICATION 4 1 IP 7111401 Exercise Evaluation 05/21/2007 05/25/2007 Baseline Inspections 1 IP 71151-EP01 Drill/Exercise Performance 05/21/2007 05/25/2007 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation 05/21/2007 05/25/2007 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System 05/21/2007 05/25/2007 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 07/09/2007 07/13/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 07/09/2007 07/13/2007 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 07/09/2007 07/13/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/09/2007 07/13/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Ginna 03/02/2006 16:17:15 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111121 - CDBI 7 1 IP 7111121 Component Design Bases Inspection 08/13/2007 08/17/2007 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 08/27/2007 08/31/2007 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 09/10/2007 09/14/2007 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 09/17/2007 09/21/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.