IR 05000244/2017006

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for R. E. Ginna Nuclear Power Plant, LLC (Reports 05000244/2017006, 05000244/2017402, and 05000244/2017501)
ML18058B292
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/28/2018
From: David Pelton
NRC Region 1
To: Bryan Hanson
Exelon Nuclear, Exelon Nuclear Generation Corp
References
IR 2017006, IR 2017402, IR 2017501
Download: ML18058B292 (6)


Text

February 28, 2018

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR R. E. GINNA NUCLEAR POWER PLANT, LLC (REPORTS 05000244/2017006, 05000244/2017402, AND 05000244/2017501)

Dear Mr. Hanson:

The NRC has completed its end-of-cycle performance assessment of R. E. Ginna Nuclear Power Plant LLC (Ginna), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017 through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Ginna during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

Ginna was in the Regulatory Response Column of the NRCs ROP Action Matrix until the end of first quarter 2017. This was based on a single inspection finding having low-to-moderate safety significance (i.e., White) in the Emergency Preparedness Cornerstone originating in the second quarter of 2016, and all PIs within the expected range (i.e., Green). This was documented in inspection report and assessment follow-up letter (05000244/2016009) (ML16262A213) dated September 20, 2016. On November 28, 2016, the NRC issued a supplemental inspection report (05000244/2016010) (ML16333A024) which stated that your actions to address the performance issue were acceptable and the finding was closed. On April 3, 2017, the NRC issued an assessment follow-up letter (05000244/2017009) (ML17093A560) returning Ginna to the Licensee Response Column of the NRC Action Matrix effective April 1, 2017.

The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In addition to normal baseline inspections, the NRC will be performing Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, and IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, at your facility.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Michelle Catts, Acting Branch Chief, Projects Branch 1, at 610-337-5012 with any questions you have regarding this letter.

Sincerely,

/RA/

David L. Pelton, Director, Division of Reactor Projects Docket No. 50-244 License No. DPR-18 Enclosure:

R. E. Ginna Inspection Plan cc: Distribution via ListServ

ML18058B292 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP R1/DRP NAME A.Rosebrook M.Catts D Pelton DATE 2/15/18 2/20/18 2/27/18

IP 22 Inspection Activity Plan Report Ginna 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count PI&R BIENNIAL 1 1 03/05/2018 03/09/2018 IP 71152B 000747 Problem Identification and Resolution 1 03/19/2018 03/23/2018 IP 71152B 000747 Problem Identification and Resolution RADIATION SAFETY - ALARA 1 1 03/19/2018 03/23/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls CYBER FULL IMP 4 1 03/26/2018 03/30/2018 IP 71130.10P 000741 Cyber Security 1 04/09/2018 04/13/2018 IP 71130.10P 000741 Cyber Security RADWASTE 1 1 04/16/2018 04/20/2018 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation ACCESS CONTROL, EQUIP PERF, TRAINING 3 1 05/21/2018 05/25/2018 IP 71130.02 000734 Access Control 1 05/21/2018 05/25/2018 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1 05/21/2018 05/25/2018 IP 71130.07 000739 Security Training 1 05/21/2018 05/25/2018 IP 71151 001338 Performance Indicator Verification TRIENNIAL FIRE PROTECTION 4 1 06/04/2018 06/08/2018 IP 71111.05T 000696 Fire Protection (Triennial)

1 06/18/2018 06/22/2018 IP 71111.05T 000696 Fire Protection (Triennial)

RADIATION SAFETY - AIRBORNE 1 1 06/25/2018 06/29/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation RADIATION SAFETY - DOSIMETRY 1 1 07/23/2018 07/27/2018 IP 71124.04 000729 Occupational Dose Assessment EP PROGRAM INSPECTION 1 1 07/30/2018 08/03/2018 IP 71114.02 000717 Alert and Notification System Testing 1 07/30/2018 08/03/2018 IP 71114.03 000718 Emergency Preparedness Organization Staffing and Augmentation System 1 07/30/2018 08/03/2018 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 07/30/2018 08/03/2018 IP 71151 001397 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

1/23/2018 9:38:36 AM

IP 22 Inspection Activity Plan Report Ginna 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count GINNA INITIAL OL EXAM 9 1 07/30/2018 08/03/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 08/27/2018 09/07/2018 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

RADIATION SAFETY - RAD HAZ & PIV 1 1 10/22/2018 10/26/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 10/22/2018 10/26/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 10/22/2018 10/26/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 10/22/2018 10/26/2018 IP 71151 000746 Performance Indicator Verification UNIT 1 INSERVICE INSPECTION 1 1 10/29/2018 11/09/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR GINNA REQUAL INSP W/ P/F RESULTS 2 1 11/12/2018 11/16/2018 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance -

Annual 1 11/12/2018 11/16/2018 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial GINNA LICENSE RENEWAL PHASE 4 2 1 03/11/2019 03/15/2019 IP 71003 000687 Post-Approval Site Inspection for License Renewal RADIATION SAFETY - RAD HAZ 1 1 03/25/2019 03/29/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls RADIATION SAFETY - INSTRUMENTS 1 1 05/13/2019 05/17/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation ISFSI OPERATIONAL INSPECTION 1 1 05/20/2019 05/24/2019 IP 60855 001001 Operation Of An ISFSI 1 05/20/2019 05/24/2019 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants DBAI - Teams 4 1 06/10/2019 06/14/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

1 06/24/2019 06/28/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

1/23/2018 9:38:36 AM

IP 22 Inspection Activity Plan Report Ginna 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RADIATION SAFETY - REMP 1 1 07/08/2019 07/12/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program FORCE-ON-FORCE PLANNING AND EXERCISES 8 1 08/05/2019 08/09/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1 08/26/2019 08/30/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing EP EXERCISE INSPECTION 5 1 08/19/2019 08/23/2019 IP 71114.01 000716 Exercise Evaluation 1 08/19/2019 08/23/2019 IP 71151 001397 Performance Indicator Verification Radiation Safety - RETS & PIV 1 1 09/30/2019 10/04/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1 09/30/2019 10/04/2019 IP 71151 000746 Performance Indicator Verification ACCESS AUTH & CONTROL, SGI CONTROL, FFD 3 1 10/21/2019 10/25/2019 IP 71130.01 000733 Access Authorization 1 10/21/2019 10/25/2019 IP 71130.02 000734 Access Control 1 10/21/2019 10/25/2019 IP 71130.06 000738 Protection of Safeguards Information 1 10/21/2019 10/25/2019 IP 71130.08 000740 Fitness For Duty Program 1 10/21/2019 10/25/2019 IP 71151 001338 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.

1/23/2018 9:38:36 AM