MONTHYEARIR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) IR 05000244/20220052022-08-31031 August 2022 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2022005) IR 05000244/20210062022-03-0202 March 2022 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2021006) IR 05000244/20210052021-09-0101 September 2021 Updated Inspection Plan for the R.E. Ginna Nuclear Power Plant, Llc (Report 05000244/2021005 ML21119A1082021-04-27027 April 2021 Ti 2515/194 Inspection Documentation Request IR 05000244/20200062021-03-0303 March 2021 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2020006) ML21011A0872021-01-11011 January 2021 LLC: Notification of Conduct of a Fire Protection Team Inspection IR 05000244/20200052020-08-31031 August 2020 Updated Inspection Plan for the R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2020005) IR 05000244/20190062020-03-0303 March 2020 Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2019006) IR 05000244/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 0500244/2019005) IR 05000244/20180062019-03-0404 March 2019 Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2018006) IR 05000244/20180052018-08-28028 August 2018 R. E. Ginna Nuclear Power Plant LLC Updated Inspection Plan: Inspection Report 05000244/2018005 IR 05000244/20170062018-02-28028 February 2018 Annual Assessment Letter for R. E. Ginna Nuclear Power Plant, LLC (Reports 05000244/2017006, 05000244/2017402, and 05000244/2017501) IR 05000244/20170052017-08-28028 August 2017 Updated Inspection Plan for R. E. Ginna Nuclear Power Plant - Inspection Report 05000244/2017005 IR 05000244/20160062017-03-0101 March 2017 Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant (Report 05000244/2016006) IR 05000244/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for R.E. Ginna Nuclear Power Plant, (Report 0500244/2016005) IR 05000244/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2015006) IR 05000244/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2015005) ML15170A3942015-06-17017 June 2015 Document Request for Appendix R Licensing Basis (Updated and Modified Request List of Documents from the Inspection Plan) ML15147A0042015-05-26026 May 2015 LLC - Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information (9-2015) IR 05000244/20140012015-03-0404 March 2015 2014 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2014001)(w/Inspection Plan) IR 05000244/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - R.E. Ginna Nuclear Power Plant (Report 05000244-14-006) IR 05000244/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2013001)(w/Inspection Plan) IR 05000244/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - R.E. Ginna Nuclear Power Plant (Report 05000244-13-006) IR 05000244/20120012013-03-0404 March 2013 Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant (Report 05000244/2012001) ML12244A3322012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Ginna Nuclear Power Plant IR 05000244/20110012012-03-0505 March 2012 Annual Assessment Letter (Report 05000244-11-001) ML1124207882011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - R. E. Ginna Nuclear Power Plant IR 05000244/20100012011-03-0404 March 2011 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2010001) ML1024401992010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - R.E. Ginna Nuclear Power Plant ML1016600092010-06-15015 June 2010 Pre-Inspection Cover Sheet and Inspection Plan (6/21-6/25/10) ML1006208332010-03-0303 March 2010 Annual Assessment Letter (Report 05000244-10-001) ML0924402302009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - R.E. Ginna Nuclear Power Plant, Dated 09/01/09 IR 05000244/20090012009-03-0404 March 2009 IR 05000244-09-001, Ginna Nuclear Power Plant Annual Assessment Letter, Dated 03/04/09 IR 05000244/20080012008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, R.E. Ginna, (IR 05000244-08-001) ML0806100142008-03-0303 March 2008 Annual Assessment Letter EOC 2007 ROP8 - Ginna Station (05000244/2008001) ML0734709602007-12-13013 December 2007 ROP8 - Ginna - Change to Inspection Plan, 12/13/07 ML0724309382007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - R.E. Ginna ML0706106172007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Ginna Station (05-244/2007001) ML0624304962006-08-31031 August 2006 Mid-Cycle Performance Review and Inspection Plan - R. E. Ginna Nuclear Power Plant ML0606203182006-03-0202 March 2006 2006-001 - Annual Assessment Letter - R. E. Ginna Nuclear Power Plant (Report 05-244/2006001) ML0524206822005-08-30030 August 2005 Mid-Cycle Performance Review and Inspection Plan - R. E. Ginna Nuclear Power Plant IR 05000244/20050012005-03-0202 March 2005 Annual Assessment Letter - R.E. Ginna Nuclear Power Plant (Report 05000244/2005001) ML0424408312004-08-30030 August 2004 2004 Ginna Mid-Cycle Performance Review and Inspection Plan ML0406301752004-03-0202 March 2004 2003-04 Annual Assessment Letter - Ginna ML0306200212003-03-0303 March 2003 2003 Annual Assessment Letter - R.E. Ginna Nuclear Power Plant ML0223802522002-08-26026 August 2002 2002 Ginna Mid-Cycle Performance Review and Inspection Plan IR 05000244/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - R. E. Ginna (Report 50-244/02-01) 2023-08-31
[Table view] Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] |
See also: IR 05000244/2010001
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD
KING OF PRUSSIA, PENNSYLVANIA 19406-1415
March 3, 2010
Mr. John T. Carlin
Vice President R. E. Ginna Nuclear Power Plant
R. E. Ginna Nuclear Power Plant, LLC
1503 Lake Road
Ontario, NY 14519
SUBJECT: ANNUAL ASSESSMENT LEDER ~ R. E. GINNA NUCLEAR POWER PLANT
(REPORT 05000244/2010001)
Dear Mr. Carlin:
On February 12, 2010, the NRC staff completed its performance review of R. E. Ginna Nuclear
Power Plant (Ginna). Our technical staff reviewed performance indicators (Pis) for the most
recent quarter and inspection results for the period from January 1 through December 31, 2009.
The purpose of this letter is to inform you of our assessment of your safety performance during
this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A
separate letter designated and marked as "Official Use Only-Security Information" will include
the security cornerstone performance review and resultant inspection plan.
Overall, Ginna operated in a manner that preserved public health and safety and met all
cornerstone objectives with moderate degradation in safety performance. Plant performance for
the most recent quarter was within the Degraded Cornerstone column of the NRC's Action
Matrix. based on two findings having low to moderatei safety Significance (White) and one White
PI in the Mitigating Systems Cornerstone. The first White finding, originating in the first quarter
2009, was related to Ginna's inadequate implementation of a preventive maintenance (PM)
program for, and the subsequent failure of, the turbine-driven auxiliary feedwater (TDAFW)
pump governor. The second White finding. originating in the fourth quarter 2009, was related to
inadequate corrective actions which led to binding of the governor control valve and failure of
the same TDAFW pump. Additionally, the assigned White PI resulted from exceeding the White
significance threshold for the Mitigating Systems Performance Index (MSPI), Heat Removal
Systems PI, in the third quarter 2009, due to the reliability and unavailability issues associated
with the TDAFW pump.
In addition to reactor oversight process (ROP) baseline inspection at your facility, based on our
current assessment of performance for Ginna, we plan to conduct a supplemental inspection
using Inspection Procedure 95002, "Inspection for One Degraded Cornerstone or Any Three
White Inputs in a Strategic Performance Area." The NRC has previously conducted inspections
(Ml093160122, ML093160200 and ML091250233)1 to ensure that deficiencies associated with
the TDAFW pump have been corrected. However, this inspection will be conducted, when your
staff notifies us of your readiness, to provide assurance that the root and contributing causes for
the risk significant performance issues are understood, to independentty assess the extent of
I DeSignation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter
are publicly available using the accession number in ADAMS
J. Carlin 2
condition and extent of cause, to Independently detennine if safety culture components
contributed to the performance issues, and to provide assurance that the corrective actions are
sufficient to prevent recurrence.
The enclosed inspection plan details the inspections, less those related to security, scheduled
through June 30, 2011. In addition to the previously noted 95002 supplemental inspection and
the baseline inspections, we plan on conducting independent spent fuel storage installation
(ISFSI) inspections. The inspection plan is provided to allow for the resolution of any scheduling
conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine
resident inspections are not listed due to their ongoing and continuous nature. The inspections
in the last nine months of the inspection plan are tentlative and may be revised at the mid-cycle
review.
In accordance with 10 CFR 2.390 of the NRC's ~Rules of Practice," a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to
discuss the change as soon as possible. Please contact Glenn Dentel of my staff at
610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
~~
Regional Administrator, Region I
Docket No. 50-244
License No. DPR-18
Enclosure: Ginna Inspection I Activity Plan
cc w/encl: Distribution via ListServ
J. Carlin 2
condition and extent of cause, to independently determine if safety culture components
contributed to the performance issues, and to provide assurance that the corrective actions are
sufficient to prevent recurrence.
The enclosed inspection plan details the inspections, less those related to security, scheduled
through June 30, 2011. In addition to the previously noted 95002 supplemental inspection and
the baseline inspections, we plan on conducting independent spent fuel storage installation
(ISFSI) inspections. The inspection plan is provided to allow for the resolution of any scheduling
conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine
resident inspections are not listed due to their ongoing and continuous nature. The inspections
in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle
review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
rmfadams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to
discuss the change as soon as possible. Please contact Glenn Dentel of my staff at
610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
IRA!
Samuel J. Collins
Regional Administrator, Region I
Docket No. 50-244
License No. DPR-18
G. Dantel. DRP RQPreportsResource@nrc.gov
Distribution w/encl: (via E-mail) N.Peny,DRP ORS Branch Chiefs (6)
S. Collins, RA (R1AMAIL RESOllRCE) J. Hawkins, DRP L. Scholl, DRS
M. Dapas. IlRA(R1MA1LRt!SOURCEI S. Sloan, ORP D.Silk, DRS
D. Lew, ORP (R1IlR_RESOURCE) K. Kolaczyk, DRP. SRI J. Trapp, DRS
J. Clifford, DRP (R1DRPMAIL RESOllRCIE) L. Casey, DRP, RI D. Serenci, PAO
D. Roberts, DRS (R1DR~oII R"o_1 M. Rose, DRP. OA N. Sheehan, PAO
P. Wilson, DRS (R1PRS.....1R**.,.) RidsNrrPMREGinna Res()urce R. Barkley, ORA
L. Trocine, RI OEDO RldsNrrOorlLpl1-1 Resource
SUNSI Review Complete: _N:.:,:P"'--_ _ _ (Reviewer's Initials) ML100620833
DOCUMENT NAME: S:\ROP*10 EOC Revlew\Branch 1\Ginna AA Letter 2.doc
After declaring this document "An Official Agency Record" it will be released to the Public.
To receive a copy of this document, indicate In the box: "C*;:: Copy without attachment/enclosure "En", Copy with
attachment/enclosure uN" ... No copy
OFFICE RI/DRP I RIIDRP I RIIDRP I RI/ORA I I
NAME NPerry/NP GDentellGTD DLew/DCL SCollins/SJC
DATE 03/0112010 03/01/10 03/01/10 03/01/10
OFFICIAL RECORD COPY
Page 1 012 Ginna
0211912010 10:14:25 Inspection / Activity Plan
Report2Z
01/01/2010 - 0613012011
Planned Dates
Start End Titi"
71124 - RADIATION SAFETY 1
01/1112010 01/1512010 lP 71124.01 Radiological Hazard Assessment and Exposure Controls
1 01/1112010 01f15/2010 IP 71124.02 Occupational ALARA Planning and Controls
EP PROG - EP PROGRAM INSPECTION
1 0210812010 0211212010 IP 7111402 Radiological Environmental Monitoring Program
0210812010 0211212010 IP 7111403 Emergency Response Organization Augmentation Testing
0210812010 02/1212010 IP 7111404 Emergency Action Level and Emergency Plan Changes
02/08/2010 0211212010 lP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies
02108/2010 02112/2010 IP 71151-EP01 DrilllExercise Performance
1 02108/2010 0211212010 IP 71151-EP02 ERO Drill Participation
1 0210812010 0211212010 IP 71151-EP03 Alert & Notification System
6f21EXAM - OPERATOR LICENSING INITIAL EXAMS 5
05/2412010 0512812010 U01766 FY10 - GINNA INITIAL OPERATOR LICENSING EXAM
06121/2010 0710212010 U01766 FY10 - GINNA INITIAL OPERATOR LICENSING EXAM
71124.08 * RAD SOLID WASTE PROCESS AND RAD MATL HAN 1
0312212010 03/26/2010 lP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage. and Transportation
ISFSI - ISFSI DRY RUN AND INITIAL LOADING
05ii7i20iQ OS/2812010 IP 80854 Preoperational Testing Of An ISFSI
05/1712010 0512812010 IP 80855 Operation Of An ISFSI
71152B *PI&R 4
05124/2010 05/2812010 IP 711528 Identffication and Resolution of Problems
1 0610712010 06111/2010 IP 711528 Identification and Resolution of Problems
2515/173 -INDUSTRY GROUND WATER INITIATIVE
0612112010 06125/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Inttlative
71124.07 .REMP 1
06121/2010 06125/2010 IP 71124.07 Public Radiation Safety
711111 B - REQUAL INSP WI P/F RESULTS 3
1110812010 11/12/2010 IP 71111118 Licensed Operator Requallficatlon Program
71124 - RAD SAFElY - RAe HAZZARD ASSESSIALARA
0912712010 1010112010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
0912712010 10/0112010 lP 71124.02 Occupational ALARA Planning and Controls
09/27/2010 10/0112010 IP 71151 Performance Indicator Verification
CDBI * COMPONENT DESIGN BASES INSPECTION 6
10/1812010 10/22/2010 IP 7111121 Component Design Bases Inspection
11/0112010 11/1212010 IP 7111121 Component Design Bases Inspection
his report does not inClude INPO andOlJTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 012 Ginna
02/1912010 10:14:25 Inspection / Activity Plan
Report 22
01/0112010 - 0613012011
Planned Dates
Start End Title
71124.05 - RAD INSTRUMENTATION
0110312011 01/0712011 IP 71124.05 Radiation Monitoring Instrumentation
71124.01 - RAe HAZZARD ASSESS, ALARA, AIR, DOSE 1
03128/2011 0410112011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
1 03/2812011 04/01/2011 IP 71124.02 Occupational ALARA Planning and Controls
1 03/2812011 04f01/2011 lP 71124.03 In*Plant Airborne Radioactivity Control and Mitigatlon
0312812011 0410112011 IP 71124.04 Occupational Oose Assessment
0312812011 0410112011 lP 71124.05 Radiation Monitoring InstrumentatiQn
TI-177 * MANAGING GAS ACCUMULATION IN ECCS 2
04/04/2011 0410812011 IP 2515/177 Managing Gas Accumulatlon In Emergency Core Cooling, Decay Heat Removal 8. Containment Spray System
7111108P *INSERVICE INSPECTION 1
05/0912011 05/2012011 IP 7111108P Inservice Inspection Activities - PWR
71124.01 - RAD HAZARD ASSESS, ALARA, AIR, DOSE 1
05/09/2011 05/2712011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
05/0912011 05127/2011 IP 71124.02 Occupational ALARA Planning and Controls
05/0912011 05/2712011 IP 71124.03 In-Plant Alrborne Radioactivity Control and MitigatJon
05/0912011 05127/2011 IP 71124.04 OccupatJonal Dose Assessment
05/09/2011 05i27i20ii iP 71124.05 Radiation ivionitoring Instrumentation
is report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.