September 2, 2008
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - R. E. GINNA NUCLEAR POWER PLANT (REPORT 05000244/2008001)
Dear Mr. Carlin:
On August 6, 2008, the NRC staff completed its performance review of R. E. Ginna Nuclear Power Plant for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter at Ginna was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
There were five inspection findings during the assessment period with documented cross-cutting aspects in the area of Problem Identification & Resolution (PI&R), and there is a cross-cutting theme associated with four of these findings. The cross-cutting theme involves the station taking appropriate and timely corrective actions to address issues commensurate with their safety significance, P.1(d)1. In evaluating your scope of efforts and progress in addressing the cross-cutting theme, the staff determined that you have appropriately identified the cross-cutting theme and scheduled or taken a range of corrective actions to address the cross-cutting theme. Additionally, station management has been actively involved in addressing this theme.
Based on the recent time-frame associated with some of these performance issues, corrective actions have not reasonably been in place long enough to determine the effectiveness of those corrective actions in addressing the cross-cutting theme. Therefore, the staff has concluded that a substantive cross-cutting issue in PI&R is not warranted at this time.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2009. In addition to baseline inspections, we plan on conducting an independent spent fuel storage installation (ISFSI) inspection, license renewal commitments inspection, and a traditional enforcement followup inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability
1 This is a descriptor which correlates to this cross-cutting aspect in the Inspection Manual Chapter 0305, Operating Reactor Assessment Program. issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA Original Signed By:/
Glenn T. Dentel, Chief Reactor Projects Branch 1 Division of Reactor Projects
Docket Nos. 50-244 License Nos. DRP-18
Enclosure: R. E. Ginna Nuclear Power Plant Inspection/ Activity Plan
cc w/enc.
M. J. Wallace, Vice - President, Constellation Energy B. Barron, President, CEO & Chief Nuclear Officer, Constellation Energy Nuclear Group, LLC P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law C. Fleming, Esquire, Senior Counsel, Nuclear Generation, Constellation Nuclear Energy Nuclear Group, LLC D. Wilson, Director, Licensing, Constellation Energy Nuclear Group, LLC P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority G. Bastedo, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness T. Judson, Central New York Citizens Awareness Network
Ginna Inspection / Activity Plan 08/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/29/2008 11:34:56 Report 22
- ISFSI INSPECTION Other Routine Operation of an Independent Spent Fuel Storage Installation at Operating Plants 01/28/2008 10/31/2008
60855.1 IP
10/27EXM
- INITIAL OPERATOR LICENSING EXAM Not Applicable FY08 - GINNA INITIAL OPERATOR EXAM 10/27/2008 11/06/2008
U01687
- PI&R Baseline Inspections Identification and Resolution of Problems 09/08/2008 09/12/2008
71152B IP Baseline Inspections Identification and Resolution of Problems 09/22/2008 09/26/2008
71152B IP
7112203
- PUB RAD SAFETY - REMP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 10/06/2008 10/10/2008
7112203 IP Baseline Inspections Performance Indicator Verification 10/06/2008 10/10/2008
71151 IP
92702
- SLIII FOLOW-UP Other Routine Followup On Corrective Actions For Violations And Deviations 10/14/2008 10/15/2008
92702 IP
7111107T
- HEAT SINK INSP Baseline Inspections Heat Sink Performance 10/20/2008 10/24/2008
7111107T IP
71121
- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 11/17/2008 11/21/2008
7112101 IP Baseline Inspections ALARA Planning and Controls 11/17/2008 11/21/2008
7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 11/17/2008 11/21/2008
7112103 IP Baseline Inspections Performance Indicator Verification 11/17/2008 11/21/2008
71151 IP
TI 171
- TI 171 Generic Safety Inspectio Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 11/17/2008 11/21/2008
2515/171 IP
7111111B
- BIENNIAL REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 01/12/2009 01/16/2009
7111111B IP
TI 176
- TI 176 Generic Safety Inspectio Emergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin Testing 12/08/2008 12/12/2008
2515/176 IP
71121
- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 02/16/2009 02/20/2009
7112101 IP Baseline Inspections ALARA Planning and Controls 02/16/2009 02/20/2009
7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 02/16/2009 02/20/2009
7112103 IP Baseline Inspections Performance Indicator Verification 02/16/2009 02/20/2009
71151 IP
7112103
- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 04/13/2009 04/17/2009
7112103 IP
EP EXER
- EP EXERCISE INSPECTION & PI VERIFICATION EP Baseline Inspection Exercise Evaluation 05/03/2009 05/09/2009
7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 05/03/2009 05/09/2009
7111404 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Ginna Inspection / Activity Plan 08/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/29/2008 11:34:56 Report 22
EP EXER
- EP EXERCISE INSPECTION & PI VERIFICATION Baseline Inspections Performance Indicator Verification 05/03/2009 05/09/2009
71151 IP
71003
- LR COMMITMENTS INSP - NON-OUTAGE License Renewal Inspec Post-Approval Site Inspection for License Renewal 05/04/2009 05/08/2009
71003 IP License Renewal Inspec Post-Approval Site Inspection for License Renewal 05/18/2009 05/22/2009
71003 IP
7112201
- PUB RAD SAFETY - RETS Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 05/25/2009 05/29/2009
7112201 IP Baseline Inspections Performance Indicator Verification 05/25/2009 05/29/2009
71151 IP
7111108P
- INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 09/14/2009 09/25/2009
7111108P IP
71121
- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 09/21/2009 09/25/2009
7112101 IP Baseline Inspections ALARA Planning and Controls 09/21/2009 09/25/2009
7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 09/21/2009 09/25/2009
7112103 IP Baseline Inspections Performance Indicator Verification 09/21/2009 09/25/2009
71151 IP
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections Fire Protection [Triennial]
11/02/2009 11/06/2009
7111105T IP Baseline Inspections Fire Protection [Triennial]
11/16/2009 11/20/2009
7111105T IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.