B11154, Forwards Addl Info for Resolution of Environ & Hydrologic Engineering Branch Draft SER Open Items.Responses Will Be Incorporated Into FSAR in Future Amend

From kanterella
Revision as of 00:20, 26 September 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Addl Info for Resolution of Environ & Hydrologic Engineering Branch Draft SER Open Items.Responses Will Be Incorporated Into FSAR in Future Amend
ML20084N729
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/03/1984
From: Counsil W, Sears C
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Youngblood B
Office of Nuclear Reactor Regulation
References
B11154, NUDOCS 8405170186
Download: ML20084N729 (33)


Text

,

General Offices

P.O. BOX 270 a s win.o.e. co., HARTFORD. CONNECTICUT 06141-0270 L j aoa cow. (203) 666-6911 L aj wwes May 3,1984 Docket No. 50-423 B11154 Director of Nuclear Reactor Regulation Mr. B. 3. Youngblood, Chief Licensing Branch No.1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Reference:

(1) B. 3. Youngblood to W. G. Counsil, Draft SER for Millstone Nuclear Power Station, Unit No. 3, dated December 20,1983.

Dear Mr. Youngblood:

Millstone Nuclear Power Station, Unit No. 3 Environmental and Hydrologic Engineering Branch Responses to Draf t SER Open Items In Reference (1), six (6) Draft SER open items were identified by the NRC Environmental and Hydrologic Engineering Branch. The status and proposed resolution of each of these open items and the corresponding review questions has been discussed with the EHEB staff reviewer, Mr. Robert Jachowski, and the additionalinformation and clarifications the Northeast Nuclear Energy Company has committed to submit to resolve these items are provided herein (Attachment 1). The responses will be incorporated into the FSAR in a future amendment.

Northeast Nuclear Energy Company considers the additional information contained herein and information provided in previous amendments to the FSAR sufficient to resolve all EHEB open items.

If you have any concerns related to the information contained herein or any questions related to our responses, please contact our licensing representative, Ms. C. 3. Shaffer at (203) 665-3285.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY, et al By Northeast Nuclear Energy Company, Their Agent D .b kourf W. G. Counsil i Senior Vice President

{} -

By: C. F. Sears Vice President Nuclear and

_. Environmental Engineering 8405170186 840503 PDR ADOCK 05000423 E PDR

cc: Mr. Robert Jachowski - EHEB

. Ms. E. L. Doolittle - Licensing Project Manager STATE OF CONNECTICUT )

) ss. Berlin COUNTY OF HARTFORD )

Then personally appeared before me C. F. Sears, who being duly sworn, did state that he is Vice President of Northeast Nuclear Energy Company, an Applicant herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the Applicants herein and that the statements contained in said information are true and correct to the best of his knowledge and belief.

JhhA/se > 4Xl

)9otary Publ[

My Commissica Expires March 31.19.88 d

L_

l t

Millstone Nuclear Power Station, Unit No.-3  !

. I Open Items  ;

1 Environmental and Hydrologic Engineering Branch

,- EHEB-01 Plant Flooding Effects of l

, Local Intense Precipitation (Draf t SER Section 2.4.2.2)  ;

1 The applicant evaluated the effect of local intense precipitation of the I magnitude of a PMP concentrated on the plant site, assuming complete blockage l of the underground storm drainage system. The staff concluded that the site l grading would limit ponding of water to a levelless than el 24.5 ft MSL, which is  !

the minimum elevation of entrances to safety-related buildings. There was,  !

however, insufficient information available defining the drainage areas. flow . l patterns, and site grading (including road crown elevations and other structures l that would a'fect flows and ponding levels) for the staff to complete its l evaluation. The applicant has been asked to provide additional information and  !

detailed analysis using the most recent PMP guidance available on rainfall  !

depth-duration relations. Until this information and analysis are available, the  !

staff cannot conclude that the plant meets the requirements of GDC 2 with  !

respect to the effects of local intense precipitation runoff on site drainage  !

relative to flooding of safety-related structures. This is an open item.

RESPONSE- ,

Hydrometeorological Report No. 33 was used to develop the design basis probable maximum precipitation for the site. The applicant understands "the  !

most recent PMP guidance available" to mean Hydrometeorological Report 51,  !

and Hydrometeorological Report 52, collectively referred to as HMR-51/52. The  ;

precipitation rates provided in this report are extremely conservative, however  :

In the interest of expediting the licensing of Millstone Unit No. 3 a study was *

- performed. Using HMR 51/52 in the study, various drainage alternatives were  !

-analyzed to determine the impact of this ultra-conservative PMP Induced site  !

flooding on plant safety-related structures. ,

' The site grading plan was revised based on the results of this study. In addition,  !

, ground cover for a substantial portion of drainage area C(Figure 2.4-7 attached)  ;

l was changed from grass.to gravel covering. Based on these two measures which  !

, are to be implemented, the safe operation of the plant is not compromised even l if HMR 51/52 precipitation is assumed.

The maximum water surface elevations would be less than the slll elevations of i all openings to safety-related structures except for three normally closed, l L locked, outward swinging doors in drainage area D. As shown in Figure 2.4.-7, l one door leads to the hydrogen recombiner building, another to the main steam f valve building, and the third to the auxillary building. A protective curb will be [

installed outside tne auxiliary building door to prevent any potential in-leakage.

Analysis of the hydrogen recombiner and main steam valve buildings showed that  !

the depth of any potential inleakage would be substantially lower than the base  ;

of any safety-related equipment. j L  ;

r l' Runoff from this postulated HMR-51/52 PMP event would not cause any flooding (

L of the safety-related equipment in the intake structure. As described in Section l l

3.4.1.1 of the FSAR, the pump motors and the associated electrical equipment  ;

l are protected against flooding to elevation 25.5 feet.  ;

l. t l 1-1 l

~

O.

Millstone Nuclear Power Station, Unit No. 3 Open Items Environmental and Hydrologic Engineering Branch AttEched is the revised Figure 2.4-7 and the details of the analysis that was performed.

FLOODING ANALYSIS HydroloEY The all season envelope PMP for the site based on HMR-51/52 is tabulated below. PMP values for durations of 5 to 15 minutes for drainage areas of less

- than 1 square mile are applicable to the Millstone site.

PROBABLE MAXIMUM PRECIPITATION Rainfall Depth Duration For 1 Mi2 of Area Hydromet Report No.

5 n'inutes 5.86 52 15 minutes 9.22 52 30 minutes 13.2 52 Ihour 17.4 52 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 26.0 51 The site was divided into drainage areas according to the revised topography and plant layout as shown on Figure 2.4-7. Runoff was calculated using the rational method. .The surface area of buildin(s that were within the drainage areas were included in the runoff calculations. The following two conservative assumptions L were made for this analysis--(1). No credit was taken for the site storm drainage L system and (2) Very high runoff coefficients'due to antecedent precipitation I were used. Data for the drainage areas, runoff coefficients, and computed flows are presented in Table 1.

[

Modifications were made to the grading plan at the site boundary to prevent water in Areas A~and B from flowing into Areas C and D where the safty-related structures are located.

! Water Surface Computations j~ Water surface elevations were calculated using the Army Corps of Engineers Hydrologic Engineering Center program HEC-2. The swales and depressions that l form channels were divided into reaches to contruct the model. Cross sections

[

were taker, to accurately describe the channel, site topography, and project

! features such as road crowns and railroad tracks. The locations of the cross sections are shown on Figure 2.4-7. Conservative values for Manning's coefficient were chosen as follows: lawn areas 0.05, paved areas 0.015, and l gravel covered areas 0.025. PMP runoff computed by the rational method was

proportioned into local incremental flows and then introduced at the appropriate cross sections. A complete input listing for the model is provided in' Attachment 1.

l-2

. . . I I

l Millstone Nuclear Power Station, Unit No. 3  ;

Open Items Environmental and Hydrologic Engineering Branch i t

' The computer water surface elevations at the safety-related structures are l summarlzed in Table 2.

The table shows that the water surface elevation is below the door sill elevation j of 24.5 feet for all safety-related structures in drainage area C. In drainage area D, the computer water surface elevation exceeds the door slll elevation of l 24.5 feet at the main steam valve building, the auxillary building, and hydrogen i recombiner building. An exterior curb will be installed at the auxiliary building door in area D. The curb will have a top elevation of 25.0 feet to keep runoff  ;

from drainage area D away from the door. Provisions will be made to adequately '

drain the area inside the curb. l The detailed analysis described below was performed to determine the impact of j this flood water on the main steam valve building and the hydrogen recombined l building.  :

i Impact on Hydrogen Recombiner Building And Main Steam Valve Building  !

. Each building is a reinforced concrete structure having only one exterior i

. opening, a personnel door hinged to open out with slll elevation 24.5'. Both 1 buildings are normally unmanned. For security purposes, the door to each

. building is alarmed and card controlled. All equipment and apparatus inside the .

hydrogen recombiner building rest on concrete pads. The top of the pads are a  ;

minimum of 0.5 feet above the floor. All equipment inside the main steam valve  !

building is a minimum of 0.7 feet above the floor. Each building is equipped  :

. with floor drains. The locations of these two doors are shown on Figure 2.4-7.

{

An unsteady flow analysis was performed to determine the duration of the water {

< surface above the door slll elevation,24.5 feet. The results of this analysis are  :

presented in Figure I which is a plot of water surface elevation versus time. l Using this information, a conservative analysis was performed to calculate the volume door condition of water wasthat notwould enterforeach applicable structur.e this analysis forwith the doorreasons:

the following closed. The 1) op(en i door use is controlled, (2) opening of the door is an'nunciated, and (3) because the j doors open out, the flood water would produce a pressure differential that would

. resist door opening and assist in door closure. Water levels inside the structures ,

l were calculated by dividing the above computed volume by the clear floor area.  ?

l- 1The results of this analysis are summarized in Table 3. .

l As Table 3 shows, this flooding does not impact the safety-related equipment l Inside these two buildings. Note that the'above analysis is conservative since no l .

credit was taken for the floor drains which should handle 75 gpm of the water

entering the structure and the critical equipment height is substantially higher  ;

than the elevation of the mounting pad that it is on.  ;

STATUS (4/84)  !

. DSER Open Item EHEB-01
CLOSED j 1-3 f 4

,1 i

, ~ - . , - - - . - , . , , - , , , - - , - - , ,,.,-,.-,n n--,_,,--,.--,.-c.,-,-,- , . , . , , - _ . . . . - . - , , . - - . . . ..- ..- - ----.:

Millstone Nuclear Power Station, Unit No. 3

~

Open Items Environmental and Hydrologic Engineering Branch TABLE 1 DRAINAGE AREA CHARACTERISTICS Computed Flow (cfs) at Surface Concentration Downstream Drainage Area Runoff Time Intensity End of Drainage Area (ac) Coefficient (Minutes) (in/hr) Area A 20.73 0.8 12 41.0 680 B 5.18 1.0 5 70.4 365 A&B 25.91 0.84 15 36.9 803 C 6.99 1.0 7 34.3 380 D 6.52 1.0 5 70.4 459(1)

(1) Computed flow at cross section 2 (hydrogen recombiner building) is 218 cfs on an applicable drainage area of 3.10 acres. -

l- .

+

P

(

I l;

1-4 '

' Millstone Nuclear Power Station, Unit No. 3 t

Open Items Environmental and Hydrologic Engineering Branch TABLE 2 COMPUTED WATER SURFACE ELEVATIONS AT SAFETY RELATED STRUCTURES 1

Maximum I W.S. Elevation At  ;.

Drainage Doors to Structure Area Structure (ft MSL)

C Auxiliary E ullding 24.30

-C Control Building ,

24.11 i

C Emer. Gen. Enclosure 24.11  !

D Main Steam Valve Building 24.96  ;

D Hydrogen Recombiner Bldg. 24.81  !

D Auxiliary Building 24.96 i

f

?

i l-l .

T r

j- .

3 h

6 L

f 3 1-5 l

s Millstone Nuclear Power Station, Unit No. 3 i I

Open Items Environmental and Hydrologic Engineering Branch TABLE 3

SUMMARY

OF ANALYSIS OF  :

WATER LEVELS INSIDE STRUCTURES ,

Minimum Volume Clear Height . Height of Base of Floor of Equipment i Building Water (cu ft) Area (so it) Water (ft) Above Floor (ft) 5 Hydrogen Recombinerl 73 473 0.15 0.5 Main Steam Valve 2 75 767 0.10 0.7 t

i I

P i

i L

'l I

l i

i i

1 Analysis based on a 4 foot wide door with I/2-inch saddle, weather stripped and assuming a 1/8 inch gap due to weather strip wear.

  • i 2 Analysis based on a 3 foot wide door with I/2-inch saddle, weather stripped  !

l and assuming a 1/8 inch gap due to weather strip wear. ,

i 1-6 i

I

4 4

4 ATTACHMENT 1 HEC-2 INPUT DATA 6

EDIO MIINT oF IWUT DATA Paga 1 i .

90000000011111111112222222222333333333344444444445555555555444444444477777777778 12345678901234547e90123454789012345678901234567890123456789012345678901234547890 1

Section T1 Local tstTen Pw RuncrF Elevations DETeststNaTION T2 MILLSTONE PtsCLealt P0HER STATION-19 TIT MD. 3 i

N&rh T3 mREA a GUTLET-Hem 52 OsasetEL af MaREM0u$ts 1st Figure 2.4-7 J1 e .01 25.0

Jr -1 1 e -1 15.

j J3 38 39 42 43 1 2 3 17 5 24.

J3 25 34 4 I NC .05 .05 .95 .1 .3

! QT 1 515

1 xtetee90 4 see 744 e e e '

i GR 3e let to 290 to 427 24 59e 23.2 743 i GR 34 744 4 79 79 70 2 x1st9995 199 del 7

GR 30 let te 315 to 44? 24 405 24.8 480

sR se det .

MC .015 .915 .915

, 3 xterelee le lee see 45 45 45 ER 31.2 100 38 Ele 29 190 28 340 27.5 39e

} 30 440.

SR to 479 25.8 505 25 543 to 453

% x19te195 11 505 423 1 43 43 .

I ER 31.2 100 30 214 29 299 28 340 27.5 39e

! Eit to 479 25.4 505 25.4 Set 25.7 402 to 422.

I GR 30 423 i ST 1 524 -

5 xtetelle a 3,e 501 1 113 113 i 28 340 27.5 390 GR 31.2 100 30 214 29 198 l! GR 27 454 to 599 35 501

? QT 1 435 '

6 xtet0115 5 299 349 1 lie 110 i GR 31.2 100 30 210 29 299 28.5 348 35 349 l OT 1 744 7 xistelte 4 294 3s1 1 se de GR 32 100 31.2 184 30 294 29.5 355 29.J 380 i

j GR 35 381 8 x1020125 4 104 372 1 48 40

) 29.5 313 29.8 371 git 32 100 31.2 104 30 244 i

' GR 35 372 xlete130 4 ISO 341 44 48 40 l 9 29.5 277 29.8 340 GR 32 let 31 154 30 204 l

t GR 35 341

~

10 x1020135 5 tee 178 105 105 It,5 GR 33.5

  • 100 32 132 29.5 159 29.8 177 35 176

}

j 0T 1 400 xle2015e a 201 553 1 150 55 l 1i 312 31.4 359 31.4 429 2

GR 33.5 100 32.2 281 32 GR 31.4 495 32 553 33 418 l EJ 7

ER 1

I-3 APR 1994 15.23.19 Pace 2

  • f "

iI 1

j MEC-2 MATER SINFACE PROFILES EH193 UERSItB4 90 LEVEL St j LDetASE-EDITOR 81.185 17.25.51 l) 1 RLNt-DATE. 3 APR 1944 i

I i eeeeeeeeeeeer:::::::::::::::::::::::::::::::::::::

j NEC2 RELEASE DATES DON 74 UPDATED APRIL 1900 i ENWOR CeeR - 01.02.93.04 i) MODIFICATION - 50.51.52.53.54 j eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeemse l

) ICITE ASTERISM te) AT LEFT OF CROSS-SECTIt34 PERSER DSICATES MESSAGE IN SLMcART OF ERRORS LIST AREA B StHLET-l#m 52 i I 4 SINetARY PRINTOUT l

(

I$

1 SEOS E.CM ELMIM 4 CMSEL CRDIS ES NaNMDI 18NeS VEN AREA .01N TOPHID l 20090.000 S.9 23.29 515.00 24.70 24.31 24.81 50.00 100.15 2.75 187.47 51.44 209.90 i

/

25.21 25.44 50.00 149.97 3.40 151.52 42.05 147.31

}$ 20095.000 - M.00 24.00 515'40 25.50 o 20100.000 45.M 25.M 515.00 24.14 24.14 24.47 15.00 40.34 4.44 115.05 81.04 191.75 t

43.88 25.44 515.00 24.47 24.47 24.79 15.00 33.00 4.70 114.4e 88.59 174.98

!$o 29105.000 1

27.M 524.00 28.22 28.22 28.58 15.00 30.4t' 4.98 111.41 95.37 155.24 j o 29110.000 113.M I

as.50 435.es 29.94 29.94 33.3a 15.00 24.43 5.44 1rs.3a 123.52 153.45 j$ o 2s115.ee0 110.00 29.50 744.00 30.97 30.97 31.41 15.00 25.21 5.71 150.13 148.18 174.85 o 19120.000 40.M 29.50 744.00 31.37 30.71 31.53 15.00 5.44 2.89 259.99 314.45 204.95

,$ 20125.000 40.00 1

29.50 744.00 31.41 30.47 31.52 15.00 4.74 2.44 281.47 341.00 204.77 l 20130.000 44.90

\

29.58 744.94 32.42 32.42 33.32 15.00 20.94 7.44 97.32 138.25 !4.40

$o 19135.000 105.90

~

31.e9 480.90 33.41 32.24 33.43 15.99 - 0.74 1.22 428.15 791.92 St4.82 20150.990 55.99

!9 i

'D

' ~~

ig

. ~ . . . . - . - . - . - . . . . - . - - . . - . . ~ . - - ~ - . . - . - . - . . . . . _ . . . - - - , - - - . . . - , -.-..-......-.c . - , . - . . , - , - ~-..,.,..,-..-..,,.-n.-, . . - , . . ----.

I i

l m

C#

{

m I

i-3 .

  1. i zg m x  : =  : =  :

=_ -,. -,. - - - ,. . z. - = !

=a g . - 2 .

=g . . i t

= Es = mz mz o mz = == = c

g- = m

=

i

4 m -

m

b  : =

-~  :

..s x

s en sI

-. :A

2

~

z a lEg8 I

i. 2

. - i e

ex II a -se =z  := ==z a=====  :: s ;n es= a-=:!

n =c - .

g g

-E i E5

[

!s= g,,g

...== a:..: ..

=,,=a ,

_ =--

= =~=~ _:g!'.=, - =g= a: !

1 k g _I

.=

n en 1

g g =m x== sez s= ms 4 r

==

=a B s

s=x=s= =sez=ze n = n!

g ==

.8 =~

n, Id-n.- s nz:==---.  : -= x =---

- ass --~E===

~~. ~~~ ass .--=== -- == 1 .

=n En = '

=a a un

= re g r mezza :n

=~

== :_II s-- -= :sszuse

--: -=c escus==m

= -z s- :zo az=m=zzanz g i

=R l i

=m

==

.ECu

, , ~~

man . ==::z=:ra, g x:::

- --- -:::::=gg*

-- -- m*:gg= mg

-- - ~  :

==

t =

W g a 5

"=

i I=A*

E s I

'1'222"I222*RERgIRzIRzR*R I =zg s 2C" s22"=2*"D2  : =s l

I=a.

x = '= = = = = = s s ).

! uuuc#A4444WDE5552555ME55E555n555555WWW55DE55bE55 WEB '

t.

l r

h .

i ;t" - n m a m - ~ m O-a fE ,

E l l .

l l

.O e e t i i t i n e a a . . l' . l

ECHO PRINT OF IlpWT,DAT3 Page 4 ,

4 etteettee11111111112ttttttttt333333333344444444445555555555444444444477777777774 It34547e981234547e9912345678981134547e99123454709ettM54709e123454709e1234547890

~

em 23.4 244 24 tot 30 241 GT 2 214 rea 9 stole 11s e lee 241 es se se em 24 les 24 112 23.0 Its 22.4 134 23 14e em 23.e Ele 24 244 30 241 i GT E 141 134 I* .10 usele117 4 les 237 le7 1e7 to?

! em to toe 24 11e 23.1s sto 23 toe to 234 j am 30 237 -

i ST I 11e 44 N

)I II sletelte 4 . les 239 lit 112 112

,' em to see to 11e 23.s see 23.5 214 to 234 em 3e 239 i

tJ i

tR 1

lI l

1 l#

4 i

1 i

h J

1 lh

- .. . . . . s ,

O Pc9e 5

  • 9 APR 1994 09.M.34 .

, IIEC-t NATER SURFACE PROFILES EN193 VERSICH H LEVEL 02 5

LIteuSE-ERITOR 81.105 17.25.51

  • O mun-e m 9 Art 1 m i

! .g l emesseesse _ _ _ _ _ _ - : 1 - : . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ::: ee

MECZ RELEASE BATES MDW 74 trDATES APRIL 1989
  1. ' ENROR CORR - 91.St 03 M l MDGIFICATIst - 50,51,52.53.54 eseesseeee - eeeeeeeeeeees I' IGNE. A31ER13t (e) AT LEFT OF CROSS-SECTION ISMBER IteICATES MESSAGE IN SLOGMRT OF ERRORS LIST AREA C EY'ORANIMS SITE-(

Sumem rRamur fO 3

SECMD M.tX ELMIN 4 CNSEL CRIH5 ES NoMMEN 10NeS VCH AREA .91N TCPHID l

H0005.000 9.0 18.M 300.00 20.19 0.9 29.41 25.00 59.59 4.45 85.31 53.43 78.48 4

C o H 0007.000 95.H 19.50 380.00 21.13 ' 21.13 21.59 25.09 97.44 5.91 79.21 38.58 79.19 o H 9999.900 90.M N.70 388.90 22.47 22.47 23.34 21.00 42.27 4.47 54.94 48.14 41.91 4

O O H0095.000 30.M 20.99 300.99 23.19 23.10 23.49 21.H 50 02 7.13 53.47 49.89 37.54 I H 0097.000 54.99 21.50 300.00 23.94 9.9 M.02 21.09 5.n 2.35 177.77 148.17 131.34 l

l C Hee 96.000 35.M 21.00 340.00 23.99 e.0 M.M n.se 3.41 1.70 '217.94 200.n 179.48 1

110100.000 30.00 22.00 333.99 M.90 9.0 24.05 25.H 4.41 1.73 292.72 131.49 187.91

) e nut.= 50. n.= su.9. 24. 3 ... M.= 25.= n.= 2.n 155.u ,5. 9 150.5.

1 .

i 19H 2.000 70.00 22.40 283.00 24.11 0.9 M.14 25.H 7.78 1.79 154.52 101.47 141.45 i

l C 41on3.000 Ss.Se Rt.40 253.se 24.14 0.0 M.n 25.9e u.Se 1.9e ul.75 14.55 141.44 l 20n5.tes 80.Ge Rt.at no.se me.e4 0.0 M.to 25.00 5.25 1.4e 144.40 94.30 129.47 i

l( uni.m uv.m 23.m ul.et 24.3e e.9 M.33 25.Ge 3.et 1.n ut.20 et.37 127.s7 j 19129.000 nr.M , 23.50 H0.99 24.34 0.9 24.37 25.H 4.91 1.10 99.75 49.44 129.83 I

J .

e EtNe PRINT eF DIRN 8A73 Page 6 O .

~

3 .

i I e00000ee011111111112ttttttttt333333333344444444445555555555444444444477777777778 1234547099123454709elt34547090123454700e123454789e123456789e123454709elt3456789e C

C 1

O C ulla AT ===5T c=M= = ==0sEM =c==r=R mee.

I

  • Section T1 T2 LOCAL (SITE) MF mmOFF ELEVATIONS DETEstIM4 TION .

-; NMF@ T3 NILLSTOME MUCLEAR POMER STATION-UNIT MD. 3 1

.O risure 2.5-7 J1 AT REACT. m DG. 4 R 52 70.4 IM./9W. IM?tMSITY-8W7M OF RR TRCNS 2 -1 24 JR -1 1 -1

, J3 3e 39 42 43 1 2 3 J3 25 34 4 I 17 5 24.

i b MC .03 .03 .e3 .1 .3 4

GT 1 157 1 x11311ee 7 tot 214 e e e SR 25 lee 24.5 See.1 ;4.5 24.1 p

lie let 23.7 214.

SR 23.2 179.9 25 240

~x1131105 e e e 5 5 5 I

-x113112e 4 let les 45 147 145 i 15 SR lee M 10s.1 24 le5.9 25 led j , 2, x113113e e e e le is le i

' ST 1 led .

3 x113114e e les 312 see ses les

. et to lee 24 100.1 24 Ele 27 216.1 r SR 24 25e 27 249.9 24 311.9 to 312 EJ 4

4 .

I' e

ER I

i E

l #

i j Y I i

}

1._____..

_ _ _ - - . . _ . . . - _ - - _ . . . . . . . _ - - . _ . . _ _ . _ . . . _ . . ....__..-_,,_....-._.,_.m_, ,. ... _ _. __ _ ---.--- __.__.,. . .,.....,_ _.-.. - _ _ . _ , . . . . . . - . . - . . - - . _

. s m _ .r s. o - ~,

o- - e;;:;, - - -

-n.

Page 7

, 29 MAR 19M 12.95.13 .

HEC-t MhTER StatFACE PROFILES EN193 VERSION 00 LEVEL 02

~

LDetAGE-ESI70R 81.105 .1~,.25.51 EtS0-84TE 29 HAR 19M eeeeeee seen NECE RELEASE DATES pelW 74 tFDATES APRIL 1900

~

ERROR CORR - 01.02.03.M

. M WIFICATItNt - 59.51.52.53.54 eeeeeeeeeeee:::::::::::::::::rer ::::::::-::::::::

% 30pTE- ASTERISt tel AT LEFT OF CROSS-SECTION 90ABER DOICATES HESSAGE IN StMtARY OF EMORS LIST e

ET REACT. OLDO.-leet 52 SpetARY PRDffet#T C SEOSB 30.CH ELMDI G CNSEL CRDIS ES Ne3BE30 10Ne5 VCN AREA .01N TOPHID o 1311 M.000 0.0 23.20 157.M 24.02 24.02 24.25 30.M 134.15 1.72 43.71 13.44 107.40 t

( 131185.000 5.00 23.20 157.M 24.19 24.03 24.30 30.M 49.74 1.52 43.15 22.24 127.42 131120.000 145.M M.00 157.00 24.77 'M.47 24.04 30.00 32.95 2.37 44.34 27.34 05.95

[' 131130.000 10.M 24.M 157.M 24.01 24.47 M.09 30.00 27.02 2.25 49.01 29.74 05.94 131140.000 100.00 M.M 144.00 24.94 24.27 M.97 30.00 3.24 0.04 170.37 00.04 177.94 M

I L

i

!D -

4 .

l

D _

2

I ay "

i _.

. i ,

__ .. i__ ._.

. l _. . . _ . . . .._ . . ... . i ... . .  : __. i . .. ...

...} . . . . _ .

_......_.l . ......;.....t. .

. [. ._ .. .

. . t. . . . .. ...........: . ..; . . _. _

.l . .; . . ' . . .. . .

.J . . ., .. ., . . . . . . . _ . ._.

..l_.

. , ..i. .

.g.. _....,.... .. . . . .: . . . . _ . .. .. ._: ,

._... ......L 3

. . . . _ . . _ .  ; ._....i... . ._ ._ . . l . . . .. _ . . r . ....:. . . _ . . . . . ..

> m -- - - - " ~

AT MAIN STEAM VALVE BLDG. - - - - t -~ -

a.. . ...._,.

.. . . ... 1 ... . .. 4 .. ... ... 3._ . . . .. ..t.

. . i w . . . . . , . _ . .  :._. . . . _ _ . _ . , .. .. . ..

.g._ .t

> . . . . .. . .. . . . ._ . .- . . ..j.. .. _i ._

.4 , ~,

g .. - _ . . . .- . . ... ,. . .. .

. 3, ---7 --

1 Mi u n IvUaM, mU. a m".N ut

.' i....... .

,03

_. 25.0-l ~-

4 -- -

RECOMBINER. BLDG --- _-i.i.,

s .

u. . . .

i

... 2._. i - . .. . . . . . __ : .. . _. ._ _... ._a _  ;

.z . ELEVA. TION. .. . . . . . . . . , . ..._ . .4_. .. ;

._...4....... . , . . . ..;. . _ . _ . . _ _ . _ . :

y - . . .! . ...!......._._. _; ! ._.

w . . . . . . ., . . _ . . . . . _ . . _ . _ . . . . . . _ .

l . _

w 24.5- /* - - -

\

+l i ... ._._

w -.- . . _ . .

10 MIN.. .. ..!_.

o . _

. .. .. i . .._.._..  !

g. ., ...

. p . _.  ;

._-> m . 24 MIN. -

_._......_.....E

_. 3__ ____ _..... ___ _ __-.._ .._.. ._ .. ,

m i .

}.._.

t w" 24.0 .i i i , i . . i . i .. . .. .i  !

T.5.

. 10 . . .. . ' 15 . - 20 . . .. ,.. . . ... 2. 5. . ._. . .

.30 .1. 35.. . . .- .,,- 4 0, .., ~. . ~

il

. . . . . . . , T.IME IN MI.  ; NUT.ES ' .. ... . .. . . ~ .

. . . .. i. .9 . ... _ .

a. . _ . . . . . . . . . _ _ . . . .  ! _ .
l. ... .

, 4 . . _ . . . ._.. . . . . . . . . - . . ,

. _. . . . . . ... . 5.. . _... .e . . . . . _ . . . . ..... . . . . . . .. ._.s...a_.. .. -

. i,

-- FIGURE - I "-- . . . .. . . . . . . .

l WATER. SURFACE ELEVATION 1 7 DURING. .P.MP VS TIME lN ~~

rF _f_j

. . . YARD _ AREA BY UNIT 3 - . - . . . . _ . .

CONTAINMENT i 3

?

. . . . i

. MILLSTONE NUCLEAR POWE.R .

PL ANT UNIT 3 -- ~--E . ,

i i 7-- !

FINAL SAFETY ANALYSIS . REPORT. ,

i >

.. a. .

, .. f

s .p .

a * . . 3 m.3 u --

_ 4.....

.. . . . . . . .!..... .....r-..,..,

. . . ,. ., % .~

m e .. i rr , .. t.,_ , ,

4 i . l, .... .  :

4 P

p

- , ~ . - ----e.-,,w_,,-_-_-.-.--a,..

~.,.-n,- . - . - - - , ..,...,-,-.,,.,,,--~----,,..,--------.-,-.,vn--,-ee

7-M 5 M

~

l'.

.- ..=

' - t:

I 35

! f. . w I E i.

. =

2 >0:.K 1 h $2

  • c h$ Mi l B y E

!!n e. i

'i

  • 8 ,W -tE U

e 5

f. v p s!

j o

g

!!:!!li=!E{=Ii i5varuai 55Hi22  :! in e! "

. o m- E D n>t >

t-F-

' I, g giD: $:i .

I(

=

g s

t

' ,E m LE ?iE ,2 l, ,

i 1

~ . , .

s.

9 8

\NN h. \

3 s

e\ 'N N

a - ~

y  :: -

e

( N #

/ c y! ,

l'

./;

_..x;- .

-w= g. - - n. _. -

--.=

,h. c. 's:.

s,

, -2 .

E S

g fu 90 s j-..-

  • i eell p,6f 'M ><l~y.al o j /.

} < 4y

! \ 'i '

j 4 .A. s_

v- +

i g.p. .

t e

dh :' q n i

cGgffQ.w. - -

~D 8 e fa$$$d,,,

ef~g s ,,a n a- m;.

9 x -

w# _ _ _ - ,

=- ~ \

.-l l l . = Ns .~ i i

\

r a x tm S@ . p.h v x x

g s f//h

->.h ,hg h,([g ,hh4 w'I.i i

~ -

&x - t

's 7iC.,_~ER .

'(  !

~ n.: q ,ne .. .

e

\

'9) '

. . . ./l . j 9

em s.* - * * * * *

  • i Millstorie Nuclear Power Station, Unit No. 3 j

Open Items Environmental and Hydrologic Engineering Branch l I  !

EHEB-02 Plant Flooding Effects of Intense Local Precipitation (Draft SER Section 2.4.2),

Roof Drainage System - Ponding on Safety-Related Structures The applicant has indicated that the roofs of safety-related buildings are I designed to dispose of local severe precipitation up to and including the local PMP as defined in the U.S. Weather Service Hydrometeorological Report No. 33 (1956) and EM 1110-2-1411 (1965).

Parapets around the perimeters of safety-related buildings have been either designed with scuppers or as low i curbing so that if internal roof drains become clogged, the water would overflow  ;

before basic roof loading would be exceeded. Because there was insufficient information available to enable the staff to reach the same conclusion, the ,

applicant has been asked to provide addition information and detailed analysis of ,

the roof drainage system including the ponding levels on roofs of safety-related <

structures. The applicant also was asked to consider the most recent PMP guidance available on rainfall depth-duration relations. Until the additional information and analysis are available, the staff cannot conclude that the plant meets the requirements of GDC 2 with respect to the effect of local intense precipitation on roofs. This is an open item.

Response

A detailed analysis of the roof drainage system including the ponding levels on roofs of safety-related structures was provided in Amended FSAR Section 2.4.2.3 (Response to Questions 240.10 and 240.11) on January 16,1984. (Amendment 6).

The NRC reviewer has determined this information is adequate to conclude that the plant meets the requirements of GDC 2 with respect to the effect of local intense precipitation on roofs. Northeast Nuclear Energy company hereby considers the above Draft SER Open Item (EHEB-02) and Questions 240.10 and 240.11 to be closed.

Status (4/84)

DSER Open Item EHEB-02: CLOSED Question 240.10: CLOSED Question 240.11: CLOSED

L l

Millstone Nuclear Power Station, Unit No. 3 Open Items Environmental and Hydrologic Engineering Branch i

EHEB-03 Service Water Pump Cubicle Flood Protection from Probable Maximum Hurricane Surge As indicated in Section 2.4-1, except for the two watertight doors into the I service water pump cubicles located within the intake structure, all accesses to i safety-related structures are at or above el 24 ft 6 in. MSL (6 in. pbove plant grade). The applicant has indicated that the watertight service water pump '

cubicles are flood protected to el 25.5 ft MSL. The staff has requested the applicant to provide additional information regarding certain flood protection aspects of these cubicles. This is an open item. ,

Response -  !

l Northeast Nuclear Energy Company provided additional information regarding i certain flood protection aspects of the service water pump cubicles in Amendment 6 to the FSAR on January 16, 1984. Our responses to Question '

240.12 and 240.13 have been reviewed by the NRC Staff and the information provided has been determined adequate to resolve any concerns related to flood,  ;

protection of the pump cubicles. .

Northeast Nuclear Energy Company hereby considers the above Draft SER Open i Item (EHEB-03) and Questions 240.12 and 240.13 to be closed.  ;

Status (4/84) l DSER Open Item EHEB-03: CLOSED '

Question 240.12: CLOSED Question 240.13: CLOSED t

i r

,n-.,_---,.,---..,--. --

1 Millstone Nuclear Power Station, Unit No. 3 Open Items Environmental and Hydrologic Engineering Branch EHEB-04 Design Basis for Shore Protection Structures (Draft SER Section 2.4.10)

The stability of the shoreline slope was analyzed by the applicant using computer program LEASE II (Limiting Equilibrium Analysis of Slopes and Embankments).  !

Both static and dynamic loads were considered in the analysis. The calculated factor of satety against a slope failure through the 5H:lV section of shoreline .

slope is 1.44 under the seismic loading condition.

However, the staff has found that the as-built and subsurface conditions of the ,

slope are not compatible with those used in the applicant's analysis and that the applicant has not provided information about the seawall design. Therefore, the ,

staff cannot confirm the adequacy of the shorelin,e slope and the seawall design  !

at this time. '

Response

Northeast Nuclear Energy Company provided additional information regarding the as-built conditions of the shoreline slope and retaining wall design in our responses to Questions 240.15, 241.21, and 241.22 (Amendment 5 to the FSAR, dated November 29, 1983). Revision 1 of the response to Question 241.22 provides the design loads and cross-sections of the west retaining wall. This information has been provided to the Structural and Geotechnical Branch '

reviewer and will be included in Amendment 8 to the FSAR scheduled for submittalin May 1984.

The Environmental and Hydrologic Engineerin6 Branch (EHEB) has reviewed the ,

i additionalinformation submitted in Amendment 5 and determined it adequate to ,

resolve concerns regarding the slope stability and retaining wall design.

j Northeast Nuclear Energy Company hereby considers the above Draft SER Open l l

Item (EHEB-04) and EHEB review Question 240.15, and SGEB review Questions 241.21 and 241.22 to be closed.

I Status (4/84)  !

i

! DSER Open item EHEB-04: CLOSED Question 420.15: CLOSED I

I r

2 i i I

Millstone Nuclear Power Station, Unit No. 3 Open items l Environmental and Hydrologic Engineering Branch l

EHEB-05 Thermal Aspects of Ultimate Heat Sink (Draft SER Section 2.4.11.2)  :

Because there was insufficient Information for the staff to determine if the 750F t

maximum temperature of the ultimate heat sink (UHS) exceeds the maximum rated cooling water temperature of safety-related equipment, the app!! cant has been requested to identify the equipment with the lowest rated maximum cooling water temperature. Until this information is available, the staff cannot

conclude that the plant meets GDC 44 with respect to the thermal aspects of the .

UHS. This is an open item. l Responses l All components cooled by the service water system have been designed to l perform based on a maximum service water inlet te'mperature of 750F. Refer to revised FSAR Section 2.4.11.6 (page 2.4-19) and Section 9.2.1.1 (page 9.2-3). ,

These revisions are being provided as they will appear in Amendment 8 to the '

FSAR, scheduled for submittal in May 1984.

Northeast Nuclear Energy Company trusts the attached information will resolve t your concerns related to the thermal aspects of the ultimate heat sink, therefore we consider the above Draf t SER Open item (EHEB-05) to be closed. .

Status (4/84) [

DSER Open Item EHEB-05: CLOSED f t

I l

t I

i 1

I t

MNPS-3 ?SAR i

The . design icw water level of el -8.0 feet ms1 for the service water pumps' includes added conservatism to the calculated extreme low water

-level of el -5.35 feet msl (Section 2.4.11.2) . The suction bells of

'the Millstone 3 circulating and service water pumps are located at .

el -19.5. feet msl and el -13.0 feet msl, respectively; well below the low water levels. Therefore, during all operating conditions, sea water is available to' the . safety related service water pumps.

Table 9.2-1 gives the minimum cooling water flow required accident cenditions' for' safety related service water loads. The circulating" water system cooling water flow required during normal cperating conditions is 912,000 gpm. Circulating water is not required during accident conditions.

The. temperature extremes of the water in Niantic Bay and Long Island Sound are 75'F maximum and 33*T minimum (see Section 9.2.1.1). Long l Island Sound and Niantic Bay can provide a 30-day supply of service water that does not exceed the design temperature under any 30-day meteorological conditions that result in maximum evaporation.

The ~ applicants have no knowledge of any history of significant ice formation in Niantic Bay. It is considered highly'unlikely that ice would form or collect in a manner or amount sufficient to obstruct the flow .to the service water and circulatin'g water pumps

(Section 2.4.7). However, as a preventative measure, part of the affluent from the circulating water discharge tunnel can be recirculated to a concrete chamber located in front of the pumphouse and then distributed to each pump bay. A reinforced concrete curtain wall located at the front of the pumphouse and extending down to el -

~

- 7.0 feet mal acts as an air seal and will also prevent floating or partially submerged debris and ice from entering the pumphouse.

1 Sedimentation that' would affect the safety function of the service water pumps is considered unlikely. The suction bells of the

-circulating water-pumps are at an.e1 6.5 feet lower than the suction bells of the service water pumps. The rated flow capacity of the circulating water pumps is approximately ten times larger than that of the service water. pumps. Therefore, any sediment that might

. settle in the pump bays downstream of the traveling screens would be

, removed by suction through the circulating water pumps before it could block the inlets to the safety related service water pumps. In the event that significant sedimentation should deposit on the floor

.of the pumphouse bays, it will be removed by occasional dredging.

2.4.12 Dispersion, Dilution, and Travel Times of Accidental Releases of Liquid Effluents in Surface Waters

> . Dispersion characteristics and dilution capability of Niantic Bay and Long Island Sound for an accidental release through the circulating water discharge tunnel is the only case discussed here. Section 2.4.13 discusses the effects of contamination of groundwater, which subsequently flows into Long Island Sound.

2.4-19

r MNPS-3 FSAR

[

t The service water system provides cooling water during all operating  ;

conditions, at a maximum sea water temperature of 758F coincident with either the service water pump design low water level i (el -8.0 feet) or the maximum flood protection level (el -25.5 feet), t and at all intermediate water levels.  !

The service water system accommodates individual isolation of all [

pumps, heat exchangers served by the systems, piping, strainers and centrol valves to maintain system operation during equipment repair and maintenance periods.

The service water pump requirements for various modes of cperation of  :

the service water system are as follows: [

Number of Service Water l Mode of Operation Pumps Required , l i

Normal operation 2  ;

Normal Cooldown 2  !

DBA coincicent with LOP '

Minimum ESF 1 i Normal ESF 2 Loss of power Hot shutdown 2 Cold shutdown ,1 The design pressure and temperature of the service water system is 100 psig and 95sF, except for the service water discharge lines from the containment recirculation coolers which have a design temperature e of 1358F, and the discharge lines from the MCC and rod control area booster pumps which have a design pressure of 145 psig. The

, cperating pressure of the service water system is 45 psig, except for '

the lubricating water lines to the service and circulating water pumps. The operating pressure of the circulating water pump lubricating water lines is 30 psig. The operating pressure of.the service water pump, lubricating water lines is 20 psig. The inlet operating temperature extremes of the service water system are 75eF maximum and 338F minimum, determined by the ambient sea water temperature in Niantic Bay. These requirements are based on a maximum inlet service water temperature of 75'F. 4 Table 9.2-1 lists the service water system flow requirements and Table 9.2-2 lists the service water system waste heat transfer requirements from the components listed to the ultimate heat sink, Long Island Sound (Section 9.2.5).  ;

The service water system and its components are designed for a plant life of 40 years. ,

9.2.1.2 System Description The service water system consists of two redundant flow paths, each  !

consisting of two service water pumps, two se rvice water self-cleaning strainers, two booster pumps, piping, and valves. The 9.2-3  ;

i Millstone Nuclear Power Station, Unit No. 3

+

Open Items i-Environmental and Hydrologic Engineering Branch e

t EHES-06 Design Basis for Groundwater Levels of Safety-Related Structures (Draft SER Section 2.4.12)  !

1 The applicant has stated that there is no safety-related permanent dewatering i system for Millstone Unit 3 and that safety-related structures are designed for  ;

ground water pressure and buoyancy forces consistent with the design of the j gound water surface levels. These design ground water levels (contours) vary  ;

from plant grade on the northwest to 18 ft below plant grade on the southwest l side of the plant facilities. On the basis of information provided in the FSAR, the staff bel.' eves that the ground water levels are not of a sufficiently (

conservative basis for design. This is an open item.

6 Response ,

4 Northeast Nuclear Energy Company has provided additional information  !

regarding the design basis groundwater levels used for safety-related structures i in our revised response to Question 241.16 (SGEB) and revised FSAR Section 2.5.4.6 and Table 2.5.4-14. Table 2.5.4-14 Indicates the actual groundwater elevation used in the design of the structures. The revised FSAR Sections and ,

'- response to Question 241.16 are provided herein as they will appear in  !

Amendment 8 to the FSAR scheduled for submittal in May 1984.  ;

L Northeast Nuclear Energy Company hereby considers the above Draft SER Open  !

Item (EHEB-06) to be closed.

  • Status (4/84) I

, r i

DSER Open item EHEB-06: CLOSED ,

f.

d l,

1 t

.. 's ,

d h. h y*  !

l

< j

_ _ . ~ . - . ~ _ _ _ , . . . _ . . . , . . , _ _ , _ . . _ _ _ _ . _ _ . , _ . . _ _ _ _ _ , _ _ _ _ _ _ _ . _ _ . _ . - . _ . _ _ _ _ _ _

, u12A79fsr2171 04/05/84 241 MNPS-3 FSAR URC Letter: May 3, 1983 1.9 Question No. Q241.16 (Section 2.5.4.10.3 and SRP Section 2.5.4) 1.12 Lateral Earth Pressure 1.13 Provide the design values of the lateral earth pressures used in the 1.14 design of rigid, unyielding, foundation walls.

Response: 1.15 FSAR Figure '2.5.4-43 shows the lateral pressure distribution used in 1.16 designing rigid unyielding foundation walls. The figure has been 1.17 revised to correct errors and to add the unit weight of backfill.

Also, FSAR Section 2.5.4.10.3 has been changed to correct 1.20 typographical errors.

A limited review of structure stability was pyrformed for the 1.21 emergency generator enclosure tank vault, the service building, and 1.22 the containment structure, considering the :effect of increasing the groundwater level to site grade, elevation +24 feet. The review was 1.24 limited to evaluating structure stability against flotation, the strength of the base mat, and the strength of the vertical perimeter 1.25 walls below grade. In addition, the effect of increasing the 1.26 coeffiele'nt of lateral earth pressure at rest from the design value of 0.5 to a value of 0.7 was evaluated for the auxiliary building and 1.27 the engineered safety features building. The results were combined 1.28 such that the effect of both the increase in groun

  • water level and the increase-in K ,were considered on the vertical perimeter walls 1.29 below grade for all five structures listed above. These structures 1.30 were selected because they are representative of all plant structures for the conditions evaluated.

All structures were found to be within allowable design criteria for 1.31 both static and dynamic. conditions for all combinations of loading. 1.32 A discussion of the plant design basis for groundwater is included in 1.33 revised FSAR Section 2.5.4.6, and the design basis for lateral earth 1.34 pressure is discussed in Section 2.5.4.10.3.

Revision 1 Q241.16-1 May 1984

. . . f l

u1217912sra8x 04/05/84 245 ,

f IDIFS-3. FS AR 2.5.4.5.3 Extent of Dredging 1.12  ;

To facilitate the flow of water into the service and circulating water 1.13 pu:nphouse. an intake channel has been dredged to the limits shown on 1.16 Figure 2.5.4-41. Side and longitudinal slopes of the intake channel are 1.17 designed at 10 and 5 percent, respectively. The beach slope varies from 1.1A 20 to 10 percent and is protected with heavy armor, as discussed in Section 2.5.5.1.

Borings and laboratory testing in the beach area adjacent to the 1.19 circulating and service water pumphouse indicate that the beach sands 1.20 are generally moderately dense, with occasional thin zones of less dense material. Liquefaction analyses of these sands, discussed in 1.21 Section 2.5.4.8.3.2, indicate that a general liquefaction of the sand 1.22 adjacent to the pumphouse is highly unlikely. If the looser zones do 1.23 liquefy, the extent of the failure would be strictly local and would not cause a massive soil movement into the dredged channel. 1.24 p i

2.5.4.6 Groundwater Conditions 1.26 i

Groundwater observations have been documented in previous reports 1.27 e (Ebasco 1966; Bechtel Corporation 1969). Water level readings in 1.29 borehole piezameters were taken for the Millstone 3 site study between l 1971 and 1973. In addition, pressure testing of rock in three boreholes 1.30 l

}' and during installation of rock anchors in the turbine and service 1.31 l buildings was conducted to determine the permeability of the rock mass. j Also, temporary drains were installed in sections of the containment 1.32  !

excavation face and the inflow of water into all excavations was 1.33 i observed throughout construction. These observations form the design 1.34

! bases for groundwater,at the site, as discussed below. l t

I i

i 2.5.4.6.1 Design Basis for Groundwater 1.36

Groundwater observations at the site prior to construction were made in 1.37 vis.f 6 i

piesometers installed in several borings. Listings of the water 1.39  !

! elevations and dates of reading are presented in Table 2.5.4-17. Three 1.40 l borings, 303, 310, and 311, were continually monitored over a 2-year period. A plot of elevation vs date for water levels in these boreholes 1.41 is shown on Figure.2.5.4-38. As a result of these observations, a 1.42 stabilised groundwater level contour map, based on the water levels .

I measured in January 1972, shown on Figure 2.5.4-37, is used as the basis 1.43 l l for determining hydrostatic loadings on structure foundations. 1.44 j Localized perched groundwater conditions probably exist because of the 1.45 i irregular distribution of ablation till materials of varying' gradation 1.46  !

l and porosity. It is also likely that shallow. ponded water exists in 1.47 {

! localized bedrock troughs. The prevalence of bedrock outcrops to the 1.48 [

north and northwest of the site indicates that bedrock acts as a j groundwater divide, isolating the soils of the tip of Millstone Point 1.49 l from soils further inland. Thus, groundwater recharge would primarily 1.50 be due to absorption of local precipitation, with probable migration of the waters to the Asunediately adjacent Long Island sound. Little 1.52 groundwater is present in the crystalline bedrock, and virtually all of the groundwater movement is restricted to the soil overburden. 1.53 l t

Amendment 8 2.5.4-15 May 1984 l 3

i

~_ _ _ _ . _ _ ._ - - _ _ . _ . _ _ _ _ _ . _ . _ _ _ _ _ . _ . . ~ _ _ _ _ _

t u1217912sra8x 04/05/84 245  !

Measurements taken during previous investigations (Bechtel 1.54 ,

Corporation 1969) showed average influx rates into test pits of about 1.56 i S gallons per hour, and it was concluded that both the ablation and 1.57 l basal tills were relatively impervious. The ablation till soils are 1.58 i more pervious than the basal tills and occasionally exhibit partial i stratification, including sporadic sand lenses. Thus, the upper 1.60 [

portions of the soil vill tr e.=it ::t:r more readily than the e underlying dense basal tills. [

. i All structures are designed for the groundwater levels shown in 2.1 i l Table 2.5.4-14 which are based on groundwater contours plotted on 2.2 Figure 2.5.4-37. No safety-related permanent dewatering system is 2.3 -

required to lower groundwater levels. These groundwater contours 2.4  !

represent average groundwater elevations of the site prior to the start j of construction. A comparison of groundwater contours with the top of 2.5 y basal till contours on Figure 2.5.4-36 verifies that the primary medium 2.6 l for groundwater flow is the permeable surficial soil overlying the basal F till. Recharge of the groundwater occurs mainly from precipitation 2.7 i infiltrating through the surficial soils, and flowing toward 1.ong Island 2.8 [

sound and the outwash deposits above the till.

t t i i

?*

construction of the plant results in la'rge changes to the site 2.9 AO4f gechydraulic conditions. Site grade will be lowered to a uniform 2.10

'[

elevation of +24 feet from the original site grade which varied from elevation 24 feet to 30 feet. The major plant structures are founded at 2.12 approximately elevation 0 feet on blasted rock excavations and backfilled from subgrade level to the ground surface with fill materials 2.13 of relatively high permeability. The backfilled nones under and around 2.14 .

these structures and the circulating water intake pipelines provide a i continuous hydraulic conduit for groundwater flow from the plant area to 2.15 l Long Island Sound. Thergfore, the average water levels prior to 2.16  !

construction are not necessarily representative of post-construction [

t . groundwater conditions. Design groundwater levels used in plant design 2.18  :

are shown in Table 2.5.4-14. f

. t

& seepage diversion system, consisting of a series of underdrains and 2.19 porous concrete, has been. installed under and around several structures 2.20 h to minimize .the amount of seepage into the basement of structures I l

founded below the groundwater table. The quantity of seepage expected 2.22 l

, to be diverted through the system will be small, due to the low .

{ permeability of the basal till and rock at the site. This" system is not 2.24 {

l considered safety related because dewatering is not necessary to ensure  ;

! the stability of any structure, and failure of the system would not 2.25  !

!, result in a significant infle- of water into the basement levels of any i I

! structures. The containment and all other category I structures are 2.27

! protected from groundwater inflow by a waterproof membrane below the 2.28

! groundwater level.

E t l Water levels measured in borings taken at the site in early 1972 2.29 l indicate e.greundwater piesometric surface with a 3-percent' gradient 2.30 l

generally sloping from northeast to southwest, as shown on

. Figure 2.5.4-37.

l l

! I

~

l l Amendment 8 2.5.4-14 May 1984 .l i

e h

e .

    • u1217912sr:8x 04/05/84

!UIPS-3 FSAR As discussed in Section 2.4.5.2 Flood Dengn Considerations, t. 2.11

  • controlling event for flooding at the Millstone 3 site is a storm surge - 1 resulting from the occurrence of the probable maximum hurricane (P!!H).

The maximum stillwater level resulting from hurricane surge was 2.34 calculated to be elevation 19.7 feet .nsl. As shown on Figure 2.4-9, the 2.35 water level drops significantly with time, so that after 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> the nood level is at elevation 17 feet and after 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> the surge les .1 2.36 subsides to elevation 10 feet. A contineous hydraulic connection would 2.37 occur across the site from the r '.n structure area to the shcrefront through the backfill placed around structures and the backfill placed in 2.23 the circulating water pipeline trench. It can be expected that the 2.39 maximum groundwater level due to flooding would not exceed elevation 19.7 feet and would probably be less because of head losses in the soil. 2.40 According to Figure 2.4-9, the water level will drop to 17 feet after 2.41 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

The design groundwater levels for major safety-related structures shown 2.42 on Table 2.5.4-14 are all equal to or greater than elevation 19 feet 2.43 with the exception of the hydrogen recombiner building, which has a design groundwater level of 18 feet. However, founding grade is at 2.45 elevation 20 feet for this structure, which t is founded on concrete fill placed directly on bedrock. Design criteria for flood conditions are 2.47 discussed in Section 3.4.

2.5.4.6.2 Groundwater Conditions During Construction 2.49 During construction, the inflow of water 'into the excavations was 2.50 controlled by pumping from sumps located outside of the building lines 2.52 'N' adjacent to structures. Most flow through the overburden was 2.53 transported through the sand lenses. All water-softened material was 2.54 removed and replaced with a fill concrete working mat as described in Section 2.5.4.5.1. The rate of inflow was sufficiently low to allow 2.56 enough time to peur,the concrete working mat without further softening of the till. ,

2.57 Drainage pipes were installed in the southwest face of the containment 2.58 excavation in order to relieve the hydrostatic gressure on the bedrock 2.59 joint and foliation surfaces. Very little water was observed flowing 2.60 through these pipes, indicating that the quantity of flow through the bedrock is small and that the permeability of the rock is low. 3.1 Water pressure tests were performed in three boreholes prior to 3.2 construction. These tests indicated that the rock within the site area 3.3 is generally massive with slight to moderate interconnected jointing. A 3.5 summary of the water pressure test. data from the boreholes is included in Table 2.5.4-16. Additional pressure tests were performed prior to 3.6 installation of rock anchors in the turbine and service buildings.

These tests further verified the low permeability of the rock mass. 3.7 These observations suggest that the permeability of the bedrock is 3.8 extremely low, and that little or no groundwater or seawater is expected 3.9 to seep through the fresh rock mass.

Amendment 8 2.5.4-17 May 1934

i i o . ..

. u1217912src8s 04/05/84. 245 -

MNPS-3 FSAR  !

2.5.4.7 Response of Soil and Rock to Dynamic Loading 3.11 l t

All seismic Category I structures and associated piping are founded 3.12 either on bedrock, basal till, or structural backfill. Portions of the 3.15

circulating water discharge tunnel are founded on ablation till in the *T  ;

i vicinity of the ventilation stack north of Millstone Unit 1. A listing 3.18 1 j' of the founding strata for all Category I structures is included in

! . Table 2.5.4-14. -

l j- Hard crystalline bedrock forms the basement complex of the area. The 3.20 l i ,

overlying dense basal till consists of a hard, compact soil which has  !

l' been heavily preloaded by continental ice. static 'and dynamic 3.21 l properties of the basal till and bedrock are discussed in l Sections 2.5.4.2.5 and 2.5.4.2.6, respectively.

- static and dynamic 3.23 [

] properties for the compacted structural backfill are discussed in l t section 2.5.4.5.2. ,

l The bedrock, basal till, ablation till, and structural backfill are 3.24 lm.at l stable materials under vibratory motion caused by the SSE. The basal 3.26 till, ablation till, and structural backfill are not susceptible to

[ liquefaction, as discussed in section 2.5.4.4. 3.27 , W 'T ,

}' The soil-structure interaction analyses' for Seismic Category I 3.28 ,

structures founded on soil were performed using the computer program 3.29 L The nonlinear behavior of the subgrade was accounted for by 3.30

~

PLAXLY-3.

use of the computer program SHAKE (LaPlante and Christian 1974) which 3.31 j was used to determine the strain-corrected soil properties. The 3.32 W .4

) subsurface material properties used in the SSI analysis are discussed in i Section 2.5.4.7.1. The method of SSI analysis and the results are 3.33 P discussed in Section 3.7.2.4. J 4

i i The response of buried piping to seismic loadings is discussed in 3.34  !

Section 3.7.3.12. r

! The shorefront west of the circulating and service water pumphouse 3.35

! consists of a structural fill and beach and outwash' and slope varying 3.37 law.y ;i

! from 5H:1V to 10H:1Vl protected by graded layers of armor stone. A plan 3.34  ;

1 showing the extent of the shoreline protection system is presented on 3.39 l Figure 2.5.4-41. A typical section is shown on Figure 2.5.5-1. Static 3.41

and dynamic properties of the beach sands are discussed in Section
2.5.4.2.2 and documented in the reports in Appendix 2.50. The 3.43 i liquefaction potential of the beach and outwash sand is discussed in l4gt.,

i- Section 2.5.4.8. The stability of the shoreline slopes under static and 3.44

(, dynamic loading is discussed in Section 2.5.5.2.

I* The service water intake pipes, between the circulating and service 3.51 i-i water pumphouse and the main plant area, are embedded in a rectangular 3.52

!,- concrete encasement. Soils encountered 'in the pipeline excavation 3.53 }

include beach and outwash sands, unclassified stream deposits, and ablation till. These soils were removed under the pipeline to dense 3.55 lava basal till and replaced with Category I structural backfill. The fill 3.56  ;

was placed at a 1:1 slope from the till surface to the base of the 3.57 l encasement and compacted ,to the requirements outlined in 3.54 j Section 2.5.4.5.2. The sides of the encasement were backfilled with 3.59 j t

t I f Amenenent 8 2.5.4-18 May 1984 f i I l h l >

~ - - - - - - - - - . _ - - -_ _ ---

o . .

o . u1217912srata 04/05/84 245 HNPS-3 FSAR nenstructural fill similar to the material used to backfill behind retaining walls and described in section 2.5.4.10.3. The backfill was 4.1-cempacted to 90 percent of maximum dry density as determined by ASTM 1557, Method D. -

y 2.5.4.7.1 Subsurface Material Properties Used in 55I Analysis 4.9 The subsurface profiles used in the soil-structure interaction analyses 4.10 for the control building and the emergency generator enclosure (EGE) are 4.12

  • idealized, horizontal profiles based on subsurface explorations conducted at the site and described in S.ection 2.5.4.3. Both of these 4.14 structures are founded on dense basal till overlying bedrock. The 4.15 computer program SHAKE was used to determine strain corrected values of shear modulus obtained from low strain values previously determined from 4.16 field testing, laboratory testing, or empirical formulae based on laboratory test data. The program iterates to obtain values of modulus 4.18 that are compatible with strain levels induced in a particular soil layer by a specific earthquake. The strain levels normally induced by 4.20 earthquakes of magnitudes similar to the Millstone SSE are several orders of magnitude higher than the low strain levels achieved during 4.21 laboratory or field testing, resulting in a reduction in shear modulus 4.23 when these properties are corrected for strain and input into PLAXLY-3. g .(

The soil-structure model used in the IGE analyses is shown on 4.24 Figure 2.5.4-72. This idealized profile was selected to conservatively 4.25 model the subsurface conditions under the EGE and in the free-field. 4.26 The geologic profiles presented in Figures 2.5.4-55, 2.5.4-56, and 4.27 2.5.4-71 indicate that the rock surface slopes from approximately 4.28 elevation 0 feet at the east end of the structure to at least elevation

-10 feet at the west end. In the north-south direction, the sloping 4.30 evacuation face between the control building and the south end of the IGE was backfilled with structural fill over the basal till. The extent 4.32 of structural fill is shown on section J-J (Figure 2.5.4-55) and Figure 2.5.4-54. Because the depth and extent of the structural fill 4.33 under the EGE is limited, it was assumed that the model used in the SHAKE, analysis is sufficiently conservative to account for local 4.34 Y variations in the subgrade and their effe'et on structural response. 4.35 The soil properties input into the SHAKE calculation are listed in 4.36 Table 2.5.4-21A- for the free-field model and*2.5.4-218 for the 4.37 i structure effects model. Three earthquake time histories, from the 4.38 i Taft, Parkfield-Temblor, and Facoisa Das earthquakes, were normalised to -

f the site SSE peak acceleration value of .17g and input at bedrock. 4.39 l Shear modulus and damping iterations were performed within the SHAKE 4.40 i program in accordance with the curves marked " Resonant Column-Test" on 4.41 Figures 2.5.4-73 and 2.5.4-74. These curves Were developed from 4.42 empirical formulae and resonant column tests performed on samples of compacted structural fill from the Millstone site. These test results 4.44 are presented on Figure 2.5.4-42. The tests show good correlation with 4.45 j j curves present by seed and Idriss in the SW-AJA report (1972). .

l

> The strain corrected values of shear modulus and damping in the free- 4.46 i load are presented in Table 2.5.4-21A. The mean value for each layer 4.47 was calculated and used to represent the individual soil layer l ,

4 Amendment 8 2.5.4-18e May 1984

o . .

3

.- u1217912src8a 04/05/84 245 MNPS-3 FSAR

_ properties used in the PLAXLY model shown on Figures 3.78-11 and 4.48
3.75-12. The Millstone site artificial earthquake was input at bedrock 4.49 and the soil was modeled as a finite element mesh. The use of SHAKE to 4.50 perform shear modulus and damping iterations precludes the need to f iterate in the PLAXLY model. A discussion of the soil-structure 4.51 interaction analysis is presented in Section 3.782.4.

For the control building, the soil profile analyzed in SHAKE and used in 4.52 the soil-structure interaction analysis was the section where rock was 4.53

.{ the deepest: 1.e., top of rock at elevation -15 feet. Shear wave 4.54 velocities were used to define soil stiffness. The low strain and 4.55

{*

strain-corrected soil prcperties for the free field case are listed in .

Table 2.5.4-22, 2.5.4.8 Liquefaction Potential 4.57 foundation materials beneath some of the seismic category I 4.58 The structures consist of limited depths of dense to very dense basal tills 4.59 and/or compacted select granular backfill. These materials are not 5.1 susceptible to liquefaction under earthquake motions as described in the following sections. .

l 2.5.4.8.1 Structural Sackfill 5.3 l

' Based on studies of soils where liquefaction has been observed (seed 5.4 1968, Lee and Fitton 1969, Kishida 1969), it is concluded that the 5.6 i

l I

i i

C l .

t I i

. o '

l l

L .

f l

l Amendment 8 .

2.5.4-18b May 1984

1

. .......a . . _ . . .. .

.. _q t;1217912sreech .C3/se/34 245

') 0 TAOLE 2.5.4-14 1.IS .

FOISIGATIosI SATA Fell st4Jelt StatecitIItES -

1.12 Awerege .

Ma r imesee I . I's ,'

Fausede tless Ave rage lhickness oimenslens thes iges s;.a l s:es l a t ed 1.16 amering f oemedisig thichseess St ruc tesrs t er Crinwidwa te r - static 1.31 Lead Crede Fouseding iiII TIII Teundetlen. [ t eve t iese settIement 1.la Structure 1 marl 11 0 festerial Irti iran artl Ltti tie) 1.19 Ce=ste ineent 0,250 -38.7 Rock - -

, 15e disaster 21 c. oss 1.25 femin Steen 5,000 +9.0 Rock - -

70 x 6e 19 0.01 1.23 Wolve I . 2s Ase:Illery 4,450 -0.5 Rock - -

177 x 164 23 u.02 1.26 Esegineered - 2,950 -0.5 Itock - -

139 x 47 28 0.01 1.2s safety 1.29 Features . 1.30 Centret 3,500 -0.5 TIII o to 10 -

125 x 105 19 0.n2 to n.03 1.32 teergesecy 4,000 +9.0 TIII 10- '

le' Strip 19 0.01 to 0.4 8.34 Cenerator I.35 Esectosure (ECE) -

1.36

. Emergency 1,6ae +1.5 Till le 4 65 x 32 19 less tesen 0.01 1. 3s' Cassereter 1.39 OII fenk 1.49 Emer9ency 1,500 +18.50 St reactural 17 9.5 44 x 12 19 u.25 ~1.42 Gastorator Beckfill 1.43 feets

  • 1.44

. 1 Refeseliseg 4,000 +l5.8 Iteck - -

. 45 disester - less then 0.01 1,46 tinter Storage 1.47 Tesek I.48 Beelnerellred 4,000 + l4. 5 flock - -

35 dienster -

less then 0.01 1.50 tieter Storage 1.51 Tank 1.52

' ~

Fese t 5,50s +3.0 Rock - 93.x 112 23 less than 0.01 1.54 tieste Disposal 4,100 +0.5 TIII 2 to S - 112 x 44 23 p.02 1,56

( t. latuid ) I.57 tieste Disposal 3,500 +19.5 Structuret 23 7 114 x-3e 23 u.25 1.59 (Solid) Sockflit 1.60 seydrogen 4,400 +20.0 Concrete - -

39 x 2T 1 85 less these o.nl 2.2 Ilocombiseer FIII 2.3 90]t: All foundetteses are structural met except EGE which is strip rooting esed sieb on grade.

Amendment 8 1 er 1 May 1944 h- w