BECO-84-103, Forwards Rev 0 to GE BWR Supplemental Licensing Submittal for Pilgrim Nuclear Power Station,Unit 1,Reload 6. Rept Corrects Document Number of Submittal Provided by

From kanterella
Revision as of 00:18, 25 September 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 0 to GE BWR Supplemental Licensing Submittal for Pilgrim Nuclear Power Station,Unit 1,Reload 6. Rept Corrects Document Number of Submittal Provided by
ML20093E214
Person / Time
Site: Pilgrim
Issue date: 07/12/1984
From: Harrington W
BOSTON EDISON CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20093E217 List:
References
BECO-84-103, NUDOCS 8407170420
Download: ML20093E214 (1)


Text

--

e BCsTON EDISON COMPANY GOD BOYLsTON STREET

. BOSTON. M AssACHusETTs 02199 WILLIAM D. HARRINGTON

-c................- BEco 84-103

"""'"" July 12, 1984 Mr. Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Consnission

! Washington, D. C. 20555 License No. DPR-35 Docket No. 50-293 Correction of Reload 6 Licensing Submittal

Dear Sir:

The attached Supplemental Reload Licensing Submittal is provided to correct the document number of the submittal provided by letter dated December 28, 1983 (BECo 83-301). This corrected submittal changes only the document number and includes those changes previously made by Revision 1, which was provided by letter dated February 21, 1984 (BEco 84-029). This correction has no impact on the contents or conclusions of the Reload Licensing Submittal.

Very truly yours, DMV/kmc

Attachment:

General Electric Boiling Water Reactor Supplemental Reload Licensing Submittal for Pilgrim Nuclear Power Station Unit 1, Reload 6, 23A1694, March 1984.

56%

I t 8407170420 840712 DR ADOCM 05000293 PDR