ML20148N365

From kanterella
Revision as of 21:07, 7 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC Has Reviewed & Accepted Rev Measurement Control Plan Submitted w/780623 Ltr & Rev to Incorp Control Plan as Condition of Special Nuc Matl Lic SNM-639.Lic Is Amended to Incorp Matl & Plant Protec Amend MPP-3
ML20148N365
Person / Time
Site: 07000687
Issue date: 11/03/1978
From: Partlow J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Mcgovern J
UNION CARBIDE CORP.
Shared Package
ML20148N370 List:
References
NUDOCS 7811270083
Download: ML20148N365 (2)


Text

t ,

bt * * " 4

/ 9'o' UNITE D ST ATES

[ g NUCLEAR REGULATORY COMMisslON

.p[ s y WASHINGTON. D. C. 20555 V...../ NOV 3 1978 SGMC
JB 70-687 C.

Union Carbide Corporation Sterling Forest Research Center ATTN: Mr. J. J. McGovern P.O. Box 324 Tuxedo, New York 10987 Gentleron:

We have reviewed and accepted the revised rinasurement control plan submitted with your letter dated June 23, 1978 and the revisions dated September 18 and 28, 1978, all of which were submitted pursuant to 10 CFR 70.57(1) and to our request dated November 17, 1977.

In order to incorporate your measurement control program as a conditien of license and to withdraw obsolete license conditions, Special Nuclear Material Licer.se No. SNM-639 is hereby amended to incorporate Materials and Plant Protection Amendment MPP-3 (Enclosure), effective thirty (30) days af ter the date of this letter. When this amendment becomes effective it will supersede in its entirety Amendment MPP-2 which was previously issued to this license.

Amendment MPP-3 contains the following changes. License Condition 1.3 is deleted. License Condition 2.1 is revised to incorporate the measurement control plan as a condition of license; existing license conditions in 4.0 are deleted with the exception of License Condition 4.9, to be renumbered License Condition 4.2; License Condition 4.1 grants relief from 10 CFR 70.57(b)(4) with respect to sampling systematic error and engineering tests in accordance with guidance provided the licensee; and License Condition 4.3 grants relief from 10 CFR 70.57(b)(8)(ii) to run a replicate program, relief the licensee presently has.

We have deternined that your initial and revised peasurements control plans of Novenber 14,1975, May 30 and June 23, 1978 and the revisions of September 18 anJ 28,1978 contain information of a type specified in 10 CFR 2.790(d). Accordingly, pursuant to Section 2.790(d)(1), such information 7811270033

t ,

1 2_

is deemed to be commercial or financial information within the meaning of 10 CFR 9.5(a)(4) and shall be subject to disclosure only in accordance with the provisions of 10 CFR 9.12.

Sincerely

\\d'c Janp@s G. Partlow, Mat rial Control Licensing Chief Branch Division of Safeguards

Enclosure:

License Amendment MPP-3 l

l

_ - _ _ _ _ _ _ _ _ _ _ _ - _ _ --_