ML20211C550

From kanterella
Jump to navigation Jump to search
Forwards Bedrock Dose Assessment Rept, Which Completes Final Survey Process.W/One Oversize Drawing
ML20211C550
Person / Time
Site: 05000054, 07000687
Issue date: 09/22/1997
From: James Adler
CINTICHEM, INC.
To: Dragoun T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20211C556 List:
References
NUDOCS 9709260241
Download: ML20211C550 (1)


Text

a 4

ClNTICHEM, INC.

P.O. BOX 818 TUXEDO. NEW YORK 10987 (914)351-2131 September 22,1997 Mr. Thomas Dragoun

--U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406

Subject:

Final Survey Report for Cintichem Bedrock Dose Assessment

Dear Afr. Dragoun:

Enclosed please find the referenced report. The scope of this portion of the Cintichem final survey includes the bedrock and soil which lies beneath the reactor, hot lab, and engineering buildings and deals with the assessment of doses due to this residual radioactivity. This submittal completes the final survey process.

-If you have any comments or questions, please contact me at (914) 3512236, or Mr. James l McGovern at (914) 3512131.

Very truly yours, x.

Joseph J. Adler i 9709260241 #70922 Manager, HSEA PDR ADOCK 05000054' ,

W PDR ,

Enclosure, as stated gh gL cc: E. Abelquist. ORISE C. Warren f R. Aldrich, NYS L. Feigenbaum

- B. Youngberg, NYS J. McGovern y g T. Michaels, NRC J. Adler a D. Orlando, NRC L. Glander '

Document Control Desk, NRC bec: F.C, Kentz, III K. Magar aeoosa li!ElBlRl! Ell! IIP!I g nAa n e v. s