MONTHYEARML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217J4411999-10-18018 October 1999 Forwards Exemption from Certain Requirements of 10CFR73.55 for Zion Nuclear Power Station,Units 1 & 2 in Response to Application Dtd 990730,to Allow Util to Discontinue Specific Aspects of Security Plan & SER ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20216G9541999-09-27027 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re 990730 Application for Exemption.Exemption Would Allow Zion Nuclear Power Station to Discontinue Specific Aspects of Security Plan A99025, Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station1999-09-15015 September 1999 Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station ML20211L1551999-09-0101 September 1999 Forwards Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812 at Zion 1 & 2 Reactor Facilities.No Violations Noted.Activities in Areas of Facility Mgt & Control, Decommissioning Support,Sf & Radiological Safety Examined ML20211J9701999-08-31031 August 1999 Discusses Request for Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans, for Plant,Units 1 & 2.Exemption & Safety Evaluation Encl ML20211J0311999-08-30030 August 1999 Agrees with Content in NRC 990810 Memo Re Plant Spent Fuel Pool.Memo Contains Accurate Summation of Info That Util Communicated to NRC During 990713 Telcon ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G8191999-08-26026 August 1999 Forwards Amend 6 to Fire Protection Rept for Zion Nuclear Power Station,Units 1 & 2, IAW 10CFR50.71(e).Attachment 1 Contains Summary of Changes ML20211F5971999-08-20020 August 1999 Submits Request for Addl Info Re Proposed Defueled TSs for Plant,Per NRC Bulletin 94-001, Potential Fuel Pool Draindown Caused by Inadequate Maint Practices at Dresden Unit 1 ML20211C7401999-08-19019 August 1999 Informs That NRC Plans to Stop Using Office Complex at Zion Nuclear Generating Station Which Commonwealth Edison Provided for NRC Resident Inspectors Under 10CFR50.70(b)(1). NRC-owned Equipment to Be Moved on or About 991001 ML20211J4421999-08-13013 August 1999 Forwards, EA & Finding of No Significant Impact Re Application for Exemption ,as Suppl by 990708 & 19 Ltrs.Proposed Exemption Would Modify Emergency Response Plan Requirements as Listed ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210J0861999-07-30030 July 1999 Requests NRC Approval of Exemption from Certain Requirements of 10CFR73, Physical Protection of Plants & Matls, by 990921.Exemption Is Needed to Support Scheduled 991001 Implementation of Plant Sf Ni.Encl Withheld,Per 10CFR73.21 ML20210C3641999-07-20020 July 1999 Discusses OI Rept 3-98-017 Completed on 980224 Re Contract Security Officer That Inadvertently Brought Personal Handgun Into Search Area at Plant & Forward NOV ML20210C4201999-07-20020 July 1999 Discusses Investigation Rept 3-98-017 Into Info Reported to Comed on 980224,informing NRC That N Everson Brought Personal Handgun Into Personnel Search Area at Plant.Nrc Determined That Violation Occurred.Nov Encl ML20210C2561999-07-19019 July 1999 Forwards Rev 1 to Calculation 22S-B-110X-0068, Determination of Heat Load for Assemblies F50D & Z33A, as Replacement Pages to Rev 0.Calculation Submitted Re Request for Approval of Proposed Plant Defueled Station EP ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20209E7391999-07-0808 July 1999 Forwards Proposed Revised Znps Defueled Station Emergency Plan & Supporting Calculations.Revs to Proposed Defueled Station Emergency Plan Have Been Reviewed & Approved IAW Comed QA Program ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196D3301999-06-18018 June 1999 Forwards Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations or Deviations Were Identified. Weakness Noted in Self Assessment/Corrective Action Program in Which Series of Personnel Errors Not Recorded in PIF Sys ML20195H9391999-06-15015 June 1999 Forwards Revised Monthly Operating Rept for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.Data Was Revised to Reflect Change in Daylight Savings Time ML20207H6121999-06-10010 June 1999 Provides Synopsis of OI Rept 3-1998-012 & Summary of Relevant Facts Re Violation Involving Employment Discrimination Against SRO at Zion Station.Enforcement Conference Scheduled for 990707 ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs A99018, Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold1999-05-27027 May 1999 Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20207B5991999-05-14014 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Was Created.Reorganization Chart Encl ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206D8041999-04-30030 April 1999 Forwards Zion Nuclear Power Station Annual Radiological Environ Operating Rept & Listing of Commitments ML20206B9371999-04-27027 April 1999 Discusses Investigation Rept 3-98-17 Re Info Reported by Licensee on 980224 That Firearm Detected During Routine Search of Contractor Employee & Failure to Rept Incident to Supervisor.Oi Rept Synopsis Encl ML20206B4051999-04-23023 April 1999 Ack Receipt of Encl FEMA Ltr,Transmitting FEMA Evaluation Rept for 980819 Annual Medical Drill for Zion Nuclear Power Station.No Deficiencies Noted.Two Areas Requiring Corrective Action Noted During Drill ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 ML20205S5811999-04-16016 April 1999 Responds to Which Urged Full Public Hearing to Held on Concerns Raised by R Robarge & E Dienethal Re Zion Npp.Commission Issued 990302 Memo & Order Affirming ASLB Decision to Deny Petition to Intervene A99014, Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station1999-04-15015 April 1999 Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station ML20205Q9971999-04-13013 April 1999 Requests NRC Approval of Plant Defueled Station Emergency Plan in Accordance with 10CFR50.54(q).Ltrs of Agreement Between Util & Offsite Agencies Who Have Agreed to Provide Assistance to Plant Encl.Calculations Also Encl ML20205P2071999-04-0909 April 1999 Discusses Insp Repts 50-295/98-02,50-304/98-02 & OI Rept 3-98-015 Completed on 981112 & Forwards Nov.Violation Involves Zion Supervisor Who Willingly Failed to Protect Unattended SGI from Unauthorized Disclosure ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20206B4331999-03-26026 March 1999 Forwards Rept for Annual Medical Drill Conducted for Zion Nuclear Power Station on 980819.Two Areas Requiring Corrective Action Identified During Drill ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util A99011, Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor1999-03-18018 March 1999 Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor ML20207D6831999-03-0101 March 1999 Forwards fitness-for-duty Program Performance Data for Each Comed Nuclear Power Station & Corporate Support Employees for Six Month Period Ending 981231,per 10CFR26.71(d) A99009, Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B1999-03-0101 March 1999 Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B ML20202J4381999-02-0303 February 1999 Forwards Zion Fuel Evaluation Info,Per Discussion ML20203C7001999-02-0202 February 1999 Informs That Mhb Technical Associates No Longer Wishes to Receive Us Region III Docket Info Re Comed Nuclear Facilities.Please Remove Following Listing from Service List A99001, Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments1999-01-19019 January 1999 Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr A99025, Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station1999-09-15015 September 1999 Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station ML20211J0311999-08-30030 August 1999 Agrees with Content in NRC 990810 Memo Re Plant Spent Fuel Pool.Memo Contains Accurate Summation of Info That Util Communicated to NRC During 990713 Telcon ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G8191999-08-26026 August 1999 Forwards Amend 6 to Fire Protection Rept for Zion Nuclear Power Station,Units 1 & 2, IAW 10CFR50.71(e).Attachment 1 Contains Summary of Changes ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210J0861999-07-30030 July 1999 Requests NRC Approval of Exemption from Certain Requirements of 10CFR73, Physical Protection of Plants & Matls, by 990921.Exemption Is Needed to Support Scheduled 991001 Implementation of Plant Sf Ni.Encl Withheld,Per 10CFR73.21 ML20210C2561999-07-19019 July 1999 Forwards Rev 1 to Calculation 22S-B-110X-0068, Determination of Heat Load for Assemblies F50D & Z33A, as Replacement Pages to Rev 0.Calculation Submitted Re Request for Approval of Proposed Plant Defueled Station EP ML20209E7391999-07-0808 July 1999 Forwards Proposed Revised Znps Defueled Station Emergency Plan & Supporting Calculations.Revs to Proposed Defueled Station Emergency Plan Have Been Reviewed & Approved IAW Comed QA Program ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20195H9391999-06-15015 June 1999 Forwards Revised Monthly Operating Rept for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.Data Was Revised to Reflect Change in Daylight Savings Time ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs A99018, Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold1999-05-27027 May 1999 Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20206D8041999-04-30030 April 1999 Forwards Zion Nuclear Power Station Annual Radiological Environ Operating Rept & Listing of Commitments ML20206F5381999-04-30030 April 1999 Forwards Magnetic Tape Containing Annual Dose Repts for 1998 for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR20.2206(c).Without Magnetic Tape ML20206B2471999-04-20020 April 1999 Informs That SE Kuczynski Has Been Transferred to Position No Longer Requiring SRO License.Cancel License SOP-31030-1, Effective 990412 A99014, Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station1999-04-15015 April 1999 Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station ML20205Q9971999-04-13013 April 1999 Requests NRC Approval of Plant Defueled Station Emergency Plan in Accordance with 10CFR50.54(q).Ltrs of Agreement Between Util & Offsite Agencies Who Have Agreed to Provide Assistance to Plant Encl.Calculations Also Encl ML20205K5841999-03-31031 March 1999 Submits Rept on Status of Decommissioning Funding for Reactors Owned by Comm Ed.Attachment 1 Contains Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20206B4331999-03-26026 March 1999 Forwards Rept for Annual Medical Drill Conducted for Zion Nuclear Power Station on 980819.Two Areas Requiring Corrective Action Identified During Drill ML20205B4241999-03-23023 March 1999 Provides Results of drive-in Drill Conducted on 990208,as Well as Augmentation Phone Drills Conducted Since 981015,as Committed to in Util A99011, Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor1999-03-18018 March 1999 Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor A99009, Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B1999-03-0101 March 1999 Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B ML20207D6831999-03-0101 March 1999 Forwards fitness-for-duty Program Performance Data for Each Comed Nuclear Power Station & Corporate Support Employees for Six Month Period Ending 981231,per 10CFR26.71(d) ML20202J4381999-02-0303 February 1999 Forwards Zion Fuel Evaluation Info,Per Discussion ML20203C7001999-02-0202 February 1999 Informs That Mhb Technical Associates No Longer Wishes to Receive Us Region III Docket Info Re Comed Nuclear Facilities.Please Remove Following Listing from Service List A99001, Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments1999-01-19019 January 1999 Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments A98056, Forwards List of Revised Various Commitments Originally Contained in Util to Nrc.Changes in Commitments Were Satisfactorily Evaluated Using NEI Commitment Change Methodology1998-12-11011 December 1998 Forwards List of Revised Various Commitments Originally Contained in Util to Nrc.Changes in Commitments Were Satisfactorily Evaluated Using NEI Commitment Change Methodology ML20198C2501998-12-11011 December 1998 Forwards Rev 45 to Zion Nuclear Power Station Security Plan, Per Requirements of 10CFR50.4(b)(4).Rev Includes Listed Changes.Licensee Has Concluded That Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld ML20196B5871998-11-20020 November 1998 Requests That Svc List for All NRC Correspondence Re Any of Six Comed Nuclear Stations Be Modified Per Attached List.All Other Names Previously Listed Should Be Removed A98051, Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEI Commitment Change Methodology1998-11-20020 November 1998 Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEI Commitment Change Methodology A98055, Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEC Commitment Change Methodology1998-11-20020 November 1998 Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEC Commitment Change Methodology ML20195E6451998-11-12012 November 1998 Provides Results of drive-in Drill Conducted on 981007,as Well as Augmentation Phone Drill Conducted on 980917 A98059, Forwards Page Change Instruction for Aug 1998 DSAR for Zion Nuclear Power Station,Units 1 & 2.Instruction Was Omitted from 981110 DSAR Due to Administrative Error1998-11-11011 November 1998 Forwards Page Change Instruction for Aug 1998 DSAR for Zion Nuclear Power Station,Units 1 & 2.Instruction Was Omitted from 981110 DSAR Due to Administrative Error A98053, Forwards Change Instructions for Update to Zion UFSAR, Rewritten to Reflect Permanent Defueled Condition of Plant. & DSAR,1998-11-10010 November 1998 Forwards Change Instructions for Update to Zion UFSAR, Rewritten to Reflect Permanent Defueled Condition of Plant. & DSAR, ML20155D2701998-10-27027 October 1998 Forwards Changed Pages from 980423 Submittal Providing Addl Info Marked with Revision Bars & Revised Pages to QA Topical Rept Section 18,for Review ML20198C7401998-10-21021 October 1998 Informs That Encl Correspondence Was Received from Constituent,C Paxton Re Request for Investigation as to Documentation Also Encl.Without Encl ML20154J4951998-10-0707 October 1998 Forwards Revised Security Plans for CE Listed Nuclear Power Stations,Per 10CFR50.4(b)(4).Changes Do Not Decrease Effectiveness of Station Security Plans.Encl Withheld A98050, Forwards Zion Station Special Rept Number 30412398002SR.Rept for Reporting Period of Jan 1996-Dec 1997.Attachment B Provides Listing of Commitments Contained in Submittal1998-10-0505 October 1998 Forwards Zion Station Special Rept Number 30412398002SR.Rept for Reporting Period of Jan 1996-Dec 1997.Attachment B Provides Listing of Commitments Contained in Submittal ML20151Y5101998-09-11011 September 1998 Provides Results of drive-in-drill Conducted on 980804 & Augmentation Phone Drills Conducted Between 980601 & 0831 ML20238F7571998-08-28028 August 1998 Forwards fitness-for-duty Program Performance Data for Each of Util Nuclear Power Stations for Six Month Period Ending 980630 A98047, Forwards Revised Scope of One Commitment Contained in Response to NOV1998-08-28028 August 1998 Forwards Revised Scope of One Commitment Contained in Response to NOV ML20153F6811998-08-26026 August 1998 Informs of E Dienethal & R Robarge Concerns Re Safety of Areas in & Around City of Zion ML20237D9281998-08-24024 August 1998 Provides Description of Approach Being Taken by Comed to Develop Dsar.New Safety Classification Will Be Developed for Equipment Determined to Be Important to Defueled Condition 1999-09-30
[Table view] |
Text
onnnionu to, ias n < i mp.un h in (.orn r., ting Wison 101Alnhelal&n k wil n.,n n ,mer s a w u, mm
., a
- ZRA97067 November 21,199i U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk
Subject:
Response to NRC's Request for Information Regarding an Adverse Trend in Zion's Configuration Control Processer; Zion Generating Station, Units 1 & 2; NRC Docket Numbers 50 295 & $0-304
References:
- 1. Letter to J. II. Mueller (Comed) from G. E. Grant (USNRC), dated August 28,1997 NRC Inspection Report No. 50-295/97016, 50 304/97016 and Notice of Violation
- 2. Letter to USNRC from J. C.11rons (Comed), dated September 29, 1997. Reply to Notice of Violation in NRC Inspection Report No.
50-295/304-97016
- 3. Letter to J. Brons (Comed) from G. E. Grant (USNRC), dated September 30,1997, NRC Inspection Report No. 50-295/97019 (DRP),50 304/97019(DRP) and Notice of Violation
- 4. Letter to USNRC from J. C.13rons (Comed), dated November 3, 1997, Reply to Notice of Violation in NRC Inspection Report No.
50 295/304 97019(DRP)
Gentlemen:
In reference I, you expressed concern over Zion Station's equipment configura' ion
- control processes and requested that Comed address its (1) action to detennine the scope of the configuration control problems; (2) short term corrective actions to arrest the adverse trend; and (3) long term corrective actions to prevent recurrence including
. cxpected completion dates. The following provides our detailed response as committed jT Aj to in Comed's letters to NRC dated September 29 c.nd November 3,1997, (references 2
,. and 4, respectively). ;
P bb pg - -llllNlI5l$h
- ' i 4 Unionn o,nquny
(
7,RA97067 Page 2 0f 5 Actiont<) to determine the scope of the configuration control problems As a result of the Operations department identifying out of position valves and the NItC's discovery of two valves out-of position (documented in the August 28, 1997, inspection iteport (reference 1)), the Operations department conducted valve verificttion on portions of selected systems to detennine the extent of the configuration control problem at Zion Station. As a result of this process, additional configuration control problems were discovered, including finding ten valves out of their proper System Operating instruction (SOI) position. As a result of these findings, a Configuration Control Manager was named to investigate this specific problem and a plant wide walkdown was conducted to verify the position of valves and proper alignment of systems that are important to the safe shutdown of Unit 2 and the Spent Fuel Pit, and to determine the scope of the configuration control problems at Zion Station.
Using the existing SOls, a subset of valves that would verify alignment of the systems and valves neeJed fbr safe shutdown was identified and on August 13,1997, the valve alignment venfication (i.e . walkdown) for safe shutdown configuration control began.
Safe shutdown valve lineup was completed on September 2,1997, at which time valve lineups fbr startup of Unit 2 were begun with dual verification for valves. The verification results were reviewed by the Shutdown Risk Manager who provided an evalumion to confimi the systems and valves verified on Unit 2 and the Spent Fuel Pit wuc conect.
As a result of these valve verifications and walkdowns a root cause investigation was conducted. The root cause investigation was completed on October 16,1997, and it detennined that the root cause ofZion's configuration control problem was a lack of clear management expectations for component manipulations and the absence of an Sol valve lineup for all station conditions.
Short term corrective actions completed (1) The Mechanical Maintenance department conducted tailgate sessions to heighten awareness of procedural requirements for peer verification when performing maintenance activities (including valve manipulation)in support of the Operations deparanent. Additionally, Mechanical Maintenance management provided the expectation that maintenance personnel will be assigned to perfonn the peer verification function for maintenance activities.
(2) The Operations Manager emphasized the importance of configuration control and c adherence to configuration control Station Policy 2-11 to each work group at Zion
! Station. Management expecte' ions for verification and documentation of any l
l; l
4 7,lt\97067 Page 3 of 5 identitled station configuration control problems were communicated to all shifts of the Operations depanment. Each work group confirmed to the Operations Manager that its people had all been contacted and understood . Zion's (onfiguration control policy.
(3) System Engineering personnel were briefed on the need to ensure that offsite service technicians or visitors, working under their direction at Zion Station, incierstand cunent station configuration control rules and policy.
j.2Dg term corrective actions to be completed Currently, system walkdowns for va;ves and components required for startup of Unit 2 and the comnion plant are 99.9% complete, with nine valves remaining to be verilled because of outstanding corrective work. Thirty nine of the 64 SOls have been revised to show the curnnt plant configuration and identify those valves that are verified for shutdown risk. These 39 Sols, which will also reference any authorized deviation to that configuration, am currently undergoing on site review.
Further, administrative control chanres have been initiated that include changes in management expectations and policies, and training packages on configuration control are under development for management expectations related to administrative control, station events, and corrective actions. Specific long term corrective actions are as follows:
(1) A 100% walkc.own with dual verification of valves and components required for startup of Unit 2 and the common plant will be conducted. This action will be completed prior to startup of Unit 2.
(2) Valve lineup procedure discrepancies, identified in the 100% walkdown and verification of valves and components required for startup of Unit 2 and the common plant, Wil be corrected. This action will be completed prior to startup of Unit 2.
(3) Skty four Sois will be revised to show the current plant configuration and identify those valves that are verified for shutdown risk and will reference any authorized deviation to that configuration. This action will be completed prior to startup of Unit 2.
(4) The Shili Operations Supervisor will revise Station Policy 211 to include management expectations for configuration control of components during shutdown and other mod:s This will include which depanments may manipulate
\
I 7,RA97067
~
Page 4 cf 5 l valves and components and under what conditions. This action will be completed prior to startup of Unit 2.
(5) The Operations Manager will establish additional management expectations regarding shutdown conditions and the role of System Operating Instructions (Sols) or other documented methods of con 0guration deviation. This action will be completed prior to startup of Unit 2.
(6) The Training department will develop training packages on configuration control that will be given at department tailgate meetings by those departments that bring in offsite service technicians or visitors who may perfonn work at the station.
These training packages will deal with management expectations related to administrative control, station events, and corrective actions. This action will be completed prior to startup of Unit 2.
(7) The Maintenance Staff department will revise ZAP 200-03, " Control of Non.
Station Personnel," to include configuration control policy (Station Polley 211) in the requirements for all work perfbrmed by onsite non station personnel. This action will be completed prior to startup of Unit 2.
Upon completion of these ongoing long tenn corrective actions, we believe that the potential ihr future configuration control problems at Zion will be minimized.
The almvc listings of short term and long tenn corrective actions pertains to actions of a general or programmatic nature that address Comed's response to NRC (and Comed) equipment configuration control concerns at Zion Station. Long term corrective actions (l.c., commitments) are identified in Attachment A to this letter. Additional actions of a more specific nature were provided in Comed's September 29 and November 3,1997, letters, in response to individual NRC cited violations in inspection Report Nos. 50-295/304 97016 and 50-295/304-97019(DRP)(reference 3), respectively, in regard to Comed's November 3,1997. Reply to Notice of Violation in NRC Inspection Report No. 50 295/304 97019(DRP) (refuence 4), we committed to completion of five actions associated with configuration control. Because of adjustments ;
to the schedule for startup of Unit 2, the commitment date for fbur of the actions has been changed to " Prior to startup of Unit 2." This change is reficcted in long term corrective action items (2), (3), (4), and (5), above. The previous commitment dates were 12/4/97, 1/1/98,12/1/97, and 12/4/97, respectively.
I
- 7,RA97067 :
Page 5 of 5 f t
-i 1
Should you have any questions concerning this response, please contact' Robert Godley, Zion Station Regulatory Assurance Manager, at (847)746 2084, extension 2900.
Sincerely, l l
, h"*
John C. Ilrons !
Site Vlec Paesident - -i Zion Generating Station ;
i t
t I
i' b i
e i
i i
-i i
. ec: Regional Administrator, USNRC - Region 111 Senior Projut Manager, USNRC - NRR Project Directorate 1112 i NRC Senior Resident inspector, Zion Generating Station -
' Ollice of Nuclear Facility Safety - IDNS :
w n e r
i
, , .-. , . ...u.-.. . . . . . - -.-.;,:,_,.:,_..,,..-,..-_-...,...--,,..-_-,...~,..-....
61.TACllMENT A to ZRA97067 l Page1of1 )
l 1
COMMITMENTS IDENTIFIED IN Tills ;
RESPONSE TO NRC'S REQUEST FOR INFORMATION The following table identifies those actions committed to by Comed in this document. Any other actions discussed in this submittal represent intended or planned actions by Comed. They are described to the NRC for the NkC's information and are not regulatory commitments. please notify Mr. Robert Godley. Zion Station Regulatory Assurance Manager, of any questions regarding this document or any associated regulatory commitments.
Commitment: Committed Date (or Outage):
A 100% walkdown with dual verification of valves and components Prior to stanup of required for startup of Unit 2 and the common plant will be conducted. Unit 2 Valve lineup procedure discrepancies, identified in the 100% walkdown Prior to stanup of and verification of valves and components required for startup of Unit 2 Unit 2 and the common plant, will be corrected.
Sixty four Sols will be revised to show the current plant configuration Prior to startup of and identify those valves that are verified for shutdown risk and will Unit 2 reference any authorized deviation to that configuration.
The Shill Operations Supervisor will revise Station Policy 2-11 to Prior to startup of include management expectations for configuration control of Unit 2 components during shutdown and other modes. This willinclude which departments may manipulate valves and components and under what conditions.
'I he Operations Manager will establish additiorni management Prior to startup of expectations regarding shutdown conditions and the role of System Unit 2 Operating Instructions (SOls) or other documented methods of configuration deviation.
The Training department will develop training packages on Prior to startup of configuration control that will be given at department tailgate meetings Unit 2 by those departments that bring in ofTsite service technicians or visitors who may perfbrm work at the station. These training packages will deal with management expectations related to administrative control, station events, and corrective actions.
The Maintenance StalT department will revise ZAP 200-03, " Control of Prior to startup of Non Station Personnel" to include configuration control policy (Station Unit 2 Policy 21l)in the requirements for all work performed by onsite non-station personnel.