ML20211C165

From kanterella
Revision as of 22:34, 1 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Partial Response to FOIA Request.App a Documents Available in Pdr.App B Documents Re Review of PRA Encl & Being Placed in PDR
ML20211C165
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 02/11/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Sholly S
MHB TECHNICAL ASSOCIATES
Shared Package
ML20209C800 List:
References
FOIA-87-6 NUDOCS 8702200025
Download: ML20211C165 (5)


Text

U.S. NUCLEAR REGULATORY COMMISSION NRc foe. ntautst NuvstRs.

,s

_~

,g P 4,o/f foxg -gr-co,,, ms.se 1 s

i ,3 RESPONSE TO FREEDOM OF l" Dd "'4 INFORMATION ACT (FOIA) REOUEST ^ g g 1 1 g (e.e../ DOCKET Nuvsta-se ur eomsom REQUESTER w %uu ct Skm PART l.-REORDS RELEASED OR NOT LOCATED (See checAed bones)

No agency records subject to the request have been located No additional agency records subract to the request have been located.

Agency records sobrect to the recast that are identified in Appendix __k are already ava: table for public inspection and copying in the NRC Public Document Room, 1717 H Street, N.W., Washington, DC.

t.gency records subsect to the request that are identified in Appendin _ .

are being made available for public inspection and copying in the NRC Public Document Room,1717 H Street, N W., Washington, DC, in a folder under the FOIA number and requester name.

The ronproonetary version of the proposalis) that you agreed to accept in a telephone conversation with a member of my staff is now being made avadable for public inspection and coying at the NRC Public Document Room,1717 H Street. N W . Washington, DC , in a fonder under this FOIA number and requester name.

Erctosed is information on how you may obtain access to and the charges for copying records placed in the NRC Public Document Room,1717 H St*eet, N.W., Washington, DC.

Agency records subject to the request are enclosed. Any applicable charge for copies of the records provided and payment procedures are noted in the comments section.

Records sublact to the request base been referred to another Federal agency 6est for review and direct response to you.

In view of NRC's response to this reauest, no further action is being taken on appeal letter dated PART ll A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain information in the requested records is being withheld from public disclosure pursuant to the FOIA exemptes described in and for the reasons stated an Part 11, sec-tions 8. C, and D. Any released portions of the documents for which only part of the record is being withheld are being made available for public inspection and copying in tha NRC Public Document Room,1717 H Street, N W., Washington. DC, in a folder under this FOI A number and requester name.

Comments G702200025 870211 PDR FOIA GHOLLYB7-6 PDR SiG f. Otatcton. M s.os a . Es aNo aEccaos

' @t$  ?

/ yQfy

.[..

NRC F!RM 464 #ers 4 191tM

Re: F01A- 87-006 APPENDIX A RECORDS MAINTAINED AMONG PDR FILES DOCKET: 50-443 50-44 1 April 4,1965 Accession Number! S 60416 07I T C 29 9%* 3 LETTER T0: Robert J. Harrison, President & CEO Public Service of New Hampshire FROM: George W. Knighton, Chief Licensing Branch No. 3. DL

SUBJECT:

Seabrook PSA Review ENCLOSURE 1: Staff Sumary of LLNL Draft Review ENCLOSURE 2: Draft Report, "A Review of the Seabrcok Station Probabilistic Safety Assessment," Lawrence livermore Laboratories, December 12, 1984 (Lto &+ n

' '. frJo910 0 5 A 9 (507 p 'y^ )

j. May 17, 1986 (Accession No. 8605210279)

LETTER T0: Vincent S. Noonan, Project Director PWR Project Directorate No. 5 (q p . j.p )

FROM:

John DeVincentis, Director of Engineering Public Service of New Hampshire

SUBJECT:

Response to NRC/LLNL Draft Review b b e t '. (18 9 % *4 )

bdow A . (a ar ey; I

I

Re: F0I A __ 006 APPENDIX B RECORDS MAINTAINED IN THE PDR UNDER THE AB0VE RE0 VEST NUMBE DATE DESCRIPTION

j. 1?/9/83 Memo from R. Bernero to R. Vollmer and Guy Artotto, SURJECT:

Containment Capability Analysis ( a pp )

3, 12/14/83 Letter fom N. Rasmussen to F. Hubbard commeting on sections of the report (d'Ipay.-)

J, 3/19/E4 Pero from T. Speis to J. Funches,

SUBJECT:

FIN-0801, " Review of PRA for Seabrook () py) y, 4/3/84 Letter frcr T. Speis to R. Duval, Sl'BJECT: LLNL Technica) g Assistance, " Review of Seabrook . . . . . . . . . . ." FIN A-0801 (/ F F,f 4 >

f 5/7/84 Letter from i

g, 5/24/84 (3rw  : G.(OKnighton

%) to R. Farrison, SI'9 JECT: Seabrook(ytopd Letter (unsioned) from S. Boyd to G. Ogeka SUDJECT: BNL Technical Assistance (FIN 8-3778), " Review of the PPA for Seabrook (c/py.)

7, 6/5/84 Fom LLNL V,189, - Dra)ft, Review of Seabrook PRA (B&R No. 70-19-70 al-5),

6 F7'+'

p. 6/19/84 Letter from J. Johnson to S. Davis (NSSP R4-116?), FIN A-0801,

" Review of Seabrook PRA" (19 fooy+ )

4, 6/21/84 Pemo form T. Speis to D. Eisenhut, et al.,

SUBJECT:

Seabrook PPA Review of the (3 &)

,c

  • ' 6/22/84 Letter from M. Tuszka, LLNL, to T. Speis,

SUBJECT:

LLNL Proposal,

" Review of Seabrook PRA" 't iv.g >

//, 6/22/84 Monthly Management Letter #1 [8/1+<M

/3.7/16/84 Memo from R. Yollmer to T. Speis

SUBJECT:

External Events PSA Review for Seabrook (3 m p)

/3. 7/17/84 Ponthly Management letter #2 (.5~/WQ o b' 8/13/84 Letter from A. Garcia to S. Davis, SUEJECT: First Pound Cuestions en Seabrook PRA (/qg<g

Re: F0!A- 006 APPENDIX R RECORDS MAINTAINED IN THE PDR UNDER THE AB0VE REQUEST NUMBER DATE DESCRIPTION

/3, 8/16/84 Memo from S. Davis to several addressees,

SUBJECT:

Seabrook PRA Peivew and Site Visit (f y )

g, undated Bhl Needs During Seabrook Plant Tour (l 04) jg. 8/20/84 Memo form L. Reiter to A. Thadani,

SUBJECT:

Preliminary Review (Jyryo) jg, 8/21/84 Memo from G. Lear to L. Reiter

SUBJECT:

PSA Seabrook Station (Spepj

/9 8/23/84 Memo form R. Rernero to T. Spets,

SUBJECT:

Review of Seabrook PSA (5'AP) go,8/24/84 Monthly Management letter #3 (#p<y+)

,m , 8/28/84 Letter from T. Speis to R. DuVal,

SUBJECT:

LLNL Technical Assistance

" Review of Seabrook PRA (FIN A-0801) (3 r y.,)

M , 8/28/84 Report Status of Seabrook PRA " Seismic, Wind, and External F1 cod Review," by Jack R. Benjamin and Associated, Inc. (G yg

.3 3, 8/28/84 Proaress Peport on Review of Seabrook PSA by P. R. Davis (/a p3-+)

p , 8/28/84 Handouts - Brief Description of SSPSA Methodology, presented to NPC by Peter Prassinos, LLNL (/4py )

35. 8/30/84 Mere from R. Vollmer to T. Speis,

SUBJECT:

External Events PSA Review for Seabrook (apops) 2,, 9/12/84 Letter from T. ,Speis to R. DuVal,

SUBJECT:

Review of Seabrook PRA (FIN A-0801) (.2 jwfo j

y), 9/18/84 Monthly Management letter #4 (6Ay=)

g ' 9/21/84 Metro form S. Brocoum to A. Thadani,

SUBJECT:

Preliminary Review of the External Events Analyses in Seabrook PSA - Additional Coment (a q<# )

Ni, 10/2/84 Letter form A. Garcia, LLNL, to S. Davis,

SUBJECT:

Rough Draft of a "Sumary of the Results Presented in the Seabrook PRA" (yg g .9 )

Jb, 10/15/84 Monthly Management Letter #5 (6fcf+)

3/, 11/5/84 Mero from V. Nerses to A. Thadani,

SUBJECT:

Seabrook Station Probabilistic Safety Assessment (SSPSA) (gg..gv.y 3.*b 11/14/84 Letter form A. Garcia to S. Davis SURJECT: Status Report on Seabrook PRA Review and Recommended Approach for Completion of Project (/o pg,.]

33, 11/19/84 Monthly Management Letter #6 he'0"* )

_ _ _ _ _ _ _ _J

Re: F0IA- 87-006 APPENDIX B RECORDS MAINTAINED IN THE PDR UNDER THE AB0VE REQUEST NUMBER g' 1/1/85 FIN No. A0801, Note "No-CosttoExtension Contract File from fo Period S. Davis,/

SUBJECT:

(/ pp) of Performance"

'3r' 1/17/85 Letter from A. Garcia to S. Davis, SURJECT: Options for Concluding the Review of the SSPSA (4//op) g 1/25/65 Letter from A. Garcia to S. Davis, Monthly Management Letter #7 hrp) 3 7. 1/29/85 Letter from T. Speis to R. DuVal,

SUBJECT:

LLNL Technical Assistance to DST, " Review of Seabrook PRA (FIN A-0801),"

including Form 173 (ygg 33, 1/30/P5 Memo from T. Speis to D. Eisenhut,

SUBJECT:

Initial Peview of the SSPSA (4 3 pp) 39, 2/4/85 Monthly Management Letter #8 (Sp y,)

g* 2/9/85 " Memorandum" (PSNH) form P. Sweeney to S. Davis, Seabrook Station PPA (SPB-85-118) (77p p4j 1)), 2/20/85 Letter from LLNL to S. Davis, Monthly Management letter #9 s.t t og g yg*,3/6/85 nuo [w m H . hmn .tc T. S'ptis , wG.wGa 9% M(##ff(t)

" Memorandum" (PSNH) from R. Sweeney to V. Nerses,

SUBJECT:

a- :)pkf>)

PRA: Highest Ranking Accident (SPB-85-133) (/ry) yg, Undated Memo from A. Thadani to T. Speis,

SUBJECT:

Seabrook PSA Review

- Options and Recommendations fro the Continuation of the Review (fdres) yg, 3/11/85 Letter from T. Spets to R. DuYal

SUBJECT:

LLNL Technical Assistance "Peview of Seabrook PRA (FIN A-0801) (ag79J L) (, , 3/?9/85 Monthly Management letter #10 (57 '</+.)

4/7,5/1/85 Monthly Management Letter #11 /(5q2+) .

5/1/85 qg, Qas/s.s* Monthly hk jwmManagement Letter #12 [fpff )

4 7~.

Sn c4 A . D w a a , n o 5 g p.x y pp - s% ,1) (y p n p )

gf,6/27/85 Monthly Management Letter #13 (S'p~... )

f/, 7/a /t5" ;Ltk #em ~3.OatJa' m CL.- te , y, p ,8/9/85 Monthly Management Letter #14 (6p y j & , Sgp5g , (3,mfa) 33, V/ar/6f ff,9/24/85

%%%4 ddtn n/s"c4 esyj Monthly Management Letter #14 (<j p.g gi,3/13/86 Letter from VNerses to R. Harrison,

SUBJECT:

SeabrookPSADeview(W/'yi) g(,, 6/86 Technical Peport No. 1587.01 by Pickard (DWesley and others) -

Seismic Fragilities of Structures and Components at Seabrook (/p?r.~fs) f), Undated Comments on Report Sections (7epp)