|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
_ - _ _ _ _ _ _ , _ _ - _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ - _ _ - _ - _ _ _ _ _ - _
t
, -OPERAilNG BATA REPORT DOCKET N0 50-413 ;
DATE Secteeber 15. 1997-OPERAi!NG STATUS COMPLETED BY _R.A. Willines TELEPHONE 704-382-5346 ;
'! Valt Nadel Cataeba 1 .
-2.-ReportingPeriod:AugustI,1997-August 31,1997
- 3. Licensed Thereal Pseer (Mutle 3411 :
-4.NaseplateRating(ErossMWel 1305' Notes etaseplate Rating 5.DesignElectricalRating(NatMuel !!45 (Stoss Muel calcolated as
- 6. Natieve Dependable Capacity (Bross Muel !!92 1450.000 MVA .90 power 7.MaileueDependableCapacity(NetMWels !!29 factor per Page 111, l
- 8. If Changes Occur in Capacity Ratings (! tees Nueber 3 Through 7) Since Last NUREG-0020.
Report.GiveReasons: ;
- 9. Peoer Level To Which Restricted, If Any (Not Muels 10.ReasonForRestrictions,Ifany:
This Month Yr.-to-Date Cueulative
-!!. Hours In Reporting Period 744,0 5831.0 -106728.0
- 18. Naber Of Hours Reactor Was Critical 744.0 5831.0 84064.8
- 13. Reacter Reserve Shutdown Hours. --0--- --0-- - 14. Heurs Generator On-Line 744.0 5831.0- 82728.8
- 15. Unit Reserve Shutdown Heats - --0-- -
- 16. 6 toss Thereal Energy Generated (MWHI 2530003 19897013 270600474
- 17. Gross Electrical Er,ergy Generated (MWH) 897015 7101441- 95720847
.18. Net Electrical Energy Benerated (MWHi 850212 6741033 90096399
-19. Unit Service Factor _100.0 100.0 77.5-
- 20. Unit Availability Factor 100.0 - 100.0 77.5
- 21. Unit Capacity Factor (Using MDC Net) 101.2 102.4 74.6-
- 22. Unit Capacity Factor (Using DER Net! _
99.8 101.0 73.7
- 23. Unit Forced Outage Rate .
0.0 0.0 7.4
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refuelitig - November 29. 1997 - 3 8 days
- 23. If Shut Down At End Of Report Period. Esticated Date of Startup:
- 26. Units In Test Status (Prior to Coseercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAT10N 9709190030 970915 PDR ADOCK 05000413 R pm
, CPERAi!NS DATA REPORT D0ttET WD 50+413 ilkli Catasta i DATE Sootenber 15. 1997 E0MPLETED BY R.A. Williaes TELEPHONE 704-382-5346 NONTH A m st. 1997 LAl AVERABE DAILY POWER LEVEL B1 A'iERASEDA!LYPOWERLEVEL
.(MWe-Net) (MWe-Met) 1 1097 17 !!33 2 1126 18 1132 3 1147 19 1141 4 1145 20 _
1139 5 1146 21 !!46 6 1150 22 !!51 7 _ 1150 23 1t54 8 1151 24 1154 9 it51 25 1152 10 1147 26 1151 11 !!44 27 !!49 12 1142 28 1145 13 1141 29 1143 14 1140 30 !!43 15 !!39 31 1842 16 !!37
UNIT SHUTOOWNS AND POWER REDf0CTIONS DOCKET NO. 50-413 UNIT NAME urowesa 1 DATE vy/Ad/yi REPORT MONTH August 1997 COMPLEED BY x. a. w1111ams TELEPHONE (ius) sez-d.see (1) (2) (3) (4) (5) ,
R MET-E HOD
'T A OF LICENSE ,
N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE: ,;
O P DURATION O REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N RX NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR' REDUCTION S I
(1) (2) (3) (4)
F Forced Reason: Method: Exhibit G'- Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram Event Re rt (LER)
D-Regulatory Res$riction , ,
4-Other (Explain) File ( G-0161)
E-Operator Training & License Examination F-Administrative (5)
G-Operator Err 9r Exhibit I - Same Source H-Other (Explain) (Explain) l
MONTilLY REFUELING INFORMATION REOUEST
- l. Facility name: Catawba. Unit 1
- 2. Scheduled next refueling shutdown: November 1997
- 3. Scheduled restart following refueling: January 1998 TIIE PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 THROUGli 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) 9 in the core: J91 (b) in the spent fuel pool: 622
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -=
- 9. Projected date oflast refueling which can be accommodated by present license capacity:
November 2009 DUKE POWER COMPANY DATE: September 15.1997 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346
DOCKET: 50-413 UNIT: Catawba 1 Date: 09/15/97 NARRATIVE
SUMMARY
MONTH: August,1997 Catawba Unit i began the month of August operating at 100% full power, The unit operated at or near 100% full power for the entire month.
- Prepared by: R. A. Williams Telephone: (704) 382-5346
, OPERAllNG DATA REPORT DOCKET ND 50-414 DATE Sentenber 15. 1997 OPERATING STATUS COMPLETEDST R.A. Willians TELEPH0hE 704 382-5346
- 1. Unit Naael Catauta 2
- 2. Reporting Period: August 1, 1997-August 31,1997
- 3. Licensed Thereal Poner (Mth 3411
- 4. Naseplate Rating (Gross NWelt 1305e Notes iMaaeplate Rating
- 5. Design Electrical Rating (Net Weh !!45 (Gross Ne) calculated as
- 6. Marises Dependable Capacity (6ross MWeb !!92 1450.000 MVA .90 power
- 7. Mailsus Dependable Capacity (Net flWeh 1129 factor per Page til,
- 8. If Changes Occur in capacity Ratings (!tess Nusber 3 Through 7) Since Last NUREG-0020.
Repert. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net Meh
- 10. Reason For Restrictions, if any:
This Month Yr.-to-Date Cueulative
!!. Hours In Reportirq Period 744.0 5831.0 96744.0
- 12. Number of Hours Reactor Was Critical 703.9 4748.9 77118.0
- 13. Reactor Reserve Shutdown Hours --0-- --0-- - 14. Hours Generator On-Line 699.6 4696.9 75943.1
- 13. Unit Reserve Sautdown Hours - --0-- --0--
- 16. eross Thersal Energy Generated (MWHI 2436149 15425299 246137375
- 17. Gross Electrical Energy Generated (WHI 837908 5511074 87360507
- 18. Net Electrical Energy Senerated (MH) 794367 5210038 82355930
- 19. Unit Service Factor 94.0 80.6 78.5
- 20. linit Availabi!!ty Factor 94.0 80.6 78.5
- 21. h it Capacity Factor (Using MDC Net! 94.6 79.1 75.3
- 22. & ,t Capacity Factor (Using DER Net! 93.3 78.0 74.3
- 23. Uait Forced Outage Rate 6.0 2.4 8.4 24, Shutdoma Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Name
- 25. If Shut Down At End Of Report Period. Estinated Date of Startup:
- 26. Units in Test Status (Prior to Cassercial Operationh Forecast Achieved INITIAL CRITICALITY th!TIAL ELECTRICITY COMMERCIAL OPERAi!ON
=_
, OPERAltlI6 DATA REPORT DOCKET N0 50-414 UNIT Catasha 2 MIE Seetamber 15. 1997 COMPLETED BY R.A. Willians TELEPHONE - 7M-382-5346 MONTH - Annutt. 1997
$1 AVERASE DAILY poler LEVEL - $1 AVERAGE DAILY POWER LEVEL (MWe-heti . (Mile-htI -
-1 !!60 17 23 2 1159 10 0 1155 19 768 4 1153 20- 1144
.5 1156 21 1154 6 1160 22 1162 7 1160 23 1164 8 1161 24 1163 9- 1160' 25 1159 10 !!57 26 1154 .;
~!! !!55 ... 27 1152 ,
12 1151 26 1152 13 1147 29 1155 14 1150 30 1156 15 1148 31 1153 _
16 1148 l
.. ...-m._._- . - - . _ - - - . . _ - . _ . . - . . _ _ _ _ . _ - - . . _ _ . _ . . _ _ - _ - _ . _ - _ __ _ _ _ _ . . _ . . ._ . . _ . . . _ _
l UNIT SHUTDOWNS AND POWER 2 EDUCTIONS DOCKET NO. 50-414' . i UNIT NAME LAranna 2 -
DATE u y/ id/.w i REPORT MONTH August 1997i COMPLETED BY x. a _. williams TELEPHONE tives-Joz-dase (1) (2) (3) (4) (5) -
R MET- !
E HOD !
T A OF LICENSE !
N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE 1 O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO- ,
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE ,
5 97 8-17 F 44.45 A 1 CH VALVEX SPURIOUS CLOSURE OF STEAM GENERATOR ;
"2D" MAIN STEAM ISOLATION VALVE ;
12-P 97- 8-18 F --
B --
IA INSTRU NUCLEAR INSTRUMENTATION CALIBRATION !
\
13-P 97- 8-19' F --
A --
HB XXXXXX HOLDING AT 19%' POWER PENDING HEATUP OI' MAIN FEEDWATER NOZZLES FOR r NOZZLE SWAP !
I i
i (1) (2) (3) (4) t F Forced Reason- Method: Exhibit G - Instructions ;
S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data' i B-Maintenance or test C-Refueling 2-Manual Scram EntW Sneets For Licensee :
3-Automatic Scram Event Re rt (LER -
! 'D-Regulatory Restriction ,
4-Other (Explain) File ( G-0161)) l
-E-Operator Training & License Examination .!
F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)
I t
{
i E
- - _ +--. ___
MONTHLY REFUELING INFORMATION REOUEST
- l. Facility name: Catawba. Unit 2
- 2. Scheduled next refueling shutdown: September 1998
- 3. Scheduled restart following refueling: October 1998 THE PROJECT MANAGER HAS DEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. TIIEREFORE, QUESTIONS 4 TIIROUGH 6 WILL NO LONGER DE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 192 (b) in the spent fuel pool: 60.0
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: =
- 9. Projected date of last refueling which can be accommodated by present license capacity:
May 2012 DUKE POWER COMPANY DATE: September 15.1997 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346
DOCKET: 50-414 UNIT: Catawba 2 Date: 09/15/97 NARRATIVE
SUMMARY
MONTH: August,1997 Catawba Unit 2 began the month of August operating at 100% full power, ne reactor was manually tripped on 08/17/97 at 0130 due to spurious closure of steam generator "2D" main steam isolation valve which was caused by optical isolator failure. ne unit was placed on-line 08/l 8/97 at 2157. During power escalation, the unit held at 15% power from 08/18/97 at 2238 to 08/19/97 at 0045 due to nuclear instrumentation calibration, ne unit held at 19% power from 0105 to 0341 pending required heat up of main feedwater nozzles to greater than 250 degrees fahrenheit for nozzle swap. The unit returned to 100%
full power on 08/19/97 at 1640, and operated at or near 100% full power the remainder of the month.
Prepared by: R. A. Williams Telephone: (704)- 382-5346
_ _ _