Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2
ML20202G864
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 01/31/1998
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20202G839 List:
References
NUDOCS 9802200237
Download: ML20202G864 (12)


Text

_ _ _ _ _ . _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ -

CPIRATIIGLATAIIP0tt DOCIIT NO 50 413 EAfg february 13,1998 DFI HTII; !?Atr$

COMPLI!!D II 1.A. V!111ats .

tit!PHOEI 704 3!2 5346

1. L' nit Rese: Catsuba 1
2. Reportin; Period: January 1,1918 Jantry 31, Illi 1.11:enstithersalP;ver(XVt): 3411 +

4.NateplateRating(GrcssNVe): 130$' Nates 'Nateplate Rating 5.DesigtIlectricallating(EttFVe):  !!(5 (GrcssMVelcalculatedas

6. Maritus tependable Capa:lty (Grcss NWe): 1192 14!O.000 M7A I .90 p:ver
7. Maxinus tependable Capacity (Net NVe): lill ft:tcrperPa;e111,
8. !! Changes occur in capa:ity tatings IItems Xpber 3 Thrcu;h 7) fin:e Last NURIG0020.

tesert. Give keisens:

l 9. Pcver Level To Which testricted, If Any (Net NVe):

10. teas:nfortestrictions,Ifany:

t ThisNath Tr. te tate Cutulative 11, Ents In Rep rtit; Pericd 744.0 744.3 110401.0

12. X;Ibe; Of Ecurs tea:ter Eas Critical 627.5 kl.5 86818.0
13. Reactor Reserve Shuthun Ents 0- 0-
14. Ents Generator Cn line $15.6 575.6 85(39.6 15.UnitReserveshutdevaHnts 0- 16.GrossThertalInergyGenerated(NVE) 1710564 1710564 279544131
17. Gross Ile:tri:al Energy Generated (RVH) 607209 607209 98913593 10.HetIlectricalInergyGenerated(MWH) 5652!( 565291 93104001
19. L'ait Servi:e Fa:t:r 77.4 77.4 77.4 20.UnitAvailabilityfacter 77.4 17.4 77.(
21. Unit Capacity f a:ter (Using Mtc Net) 67.3 67.3 74.5 22.UnitCapa:ltyfa:ter(Usingt!! Net) 66.4 66.( 73.7 23.UnitTcreedOutagelate 1.2 8.2 7.2
24. Shutd vn 3:hehled C7er Next 6 Naths (Type, tate, and Duration cf In:h):

None

25. If Shut D:va At End of Rep;rt Peried. Istinated Date of Startup:
26. Units In Test Stitts (Frier to C0:2ercial Operatin): Fere:ast A:hieved IIITIAL Cl!TICALITT IEITIAL ILIOTIICITT C;MMIRCIAL OPIRATION 9802200237 980213 PDR ADOCK 05000413 R PDR l

4 1

CPIP.ATING DATA !!P0tt D001tf 50 50-(13 UUT Cativh 1 IATE FehutrY IL 1998 COMPLIT!DIf R. A. Willitu

!!LIPENI 704 182 5346 OffH Jttlary,1999

)] AV!!AGI CAILY POVII IIVIL M AVERAGE CAILT P0f!! LIVIL (MWe-Net) (NVeItt) 1 0 17 384 2 _

0 18 331 3 0 19 0 4 0 20 0 5 0 21 920 _

i 122 22 1161 7 H6 23 1165 6 725 24 1168 9 1111 25 1171 10 _ 1165 26  !!69 11 116! 21 1.67 12 1165 28 1167 13 1164 29  !!6!

14 1165 30 1169 15 1156 31 1170 16 109?

UNIT SHUTDOWNS RWD POWER REDUCTIONS DOCKET 140. 50-413 UNIT NAME tarawtsa 1 -

DATE vz/13/ye REPORT MONTH C'anuary 1998 COMPLETED BY x. a. wi3liams PAGE 1 OF 3 TELEPHONE ( / ue ) -3 e z -:>34 6 (1) (2) (3) (4) (5)

R MET-E HOD T A OF LICENSE N Y S SITJT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO i

. DATE E HOURS N R/X NO. CODE CODE PREVENT RFCURRENCE 1 98 1 S 70.18 C --

RC FUELXX END-OF-CYCLE 10 REFUELING OUTAGE 2 98 3 S 32.00 A --

CG PUMPXX "1B" VOLUME CONTROL PUMP LOW OIL PRESSURE 3 98 5 S 9.98 B --

CF PUMPXX ADDITIONAL HEAD CUFVE TESTING ON "1B" RESIDUAL HEAT REMOVAL PUMP 1-P 98 5 S --

B --

HA TURBIN SOAK FOR MAIN TURBINE OVERSPEED TRIP TESTING 2-P 98 5 S --

B --

HA TURBIN SOAK FOR MAIN TURBINE OVERSPEED TRIP TESTING 3-P 98 6 S --

B --

HA TURBIN HOLDING AT 10% POWER TO PERFORM' MAIN TURBINE OVERSPEED TRIP TEST 4 98 6 S 4.92 B --

HA TURBIN MAIN TURBINE OVERSPEED TRIP TEST (1) (2) (3) (4)

F Forced Reason: Method: Exhibit G - Instructions S Scheduled A-Equinment Failure (Explain) 1-Manual for Preparation of Data B-Malnhenance or test 2-Manual Scram EntU Sneets For Licensee Event Report (LER)

C-Refueling 3-Automatic Scram D-Regulatory Restriction .

4-Other (Explain) File (NUREG-0161)

E-Operator Training & License: Examination F-Aciminintrative (5)

G-Operator Error Exhibit I - Same Source H-Otbar (Explain) (Explain)

'u >

r

^

UNIT SHUTDOWNS AWD POWER RELUCTI" w DOCKET WO. 50-413 UNIT NAME 7 1Am$a 1 .

DATE uz/1.3/yu REPORT MONTH January 1998 COMPLETED BY x. n _. williams  ;

PAGE 2 OF 3 TELEPHONE t / ue i -J uz-d.se d (1) (2) (3) (4) (5) i R MET-E HOD T A OF LICENSE -

N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE "

O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 4-P 98 6 S --

A --

CH XXXXXX HOLDING AT 20% POWER TO SWAP MAIN FEEDWATER NOZZLES 5-P 98 6 S --

B --

IA INSTRU POWER ASCENSION TESTING 6-P 98 7 S --

B --

IA INSTRU POWER RANGE NUCLEAR INSTRUMENTATION SYSTEM CALIBRATION ,

7-P 98 8 F --

A --

IA INSTRU HOLDING AT 58% POWER PENDING EVALUATION OF POWER ESCALATION RAMP ,

RATE GREATER THAN 3% PER HOUR i 8-P 98 8 S --

B --

IA INSTRU POWER ASCENSION TESTING 9-P 98- 1-17 F --

A --

CH HTEXCH EVALUATED / ADJUSTED STEAM GENERATOR "1B" MAIN FEEDWATER REGULATOR VALVE "1CF37" PACKING TORQUE L

(1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram EntW Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER) I D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)

E-Operator training & License Examination F-Administrative (5)

G-Operater Error Exhibit I - Same Source H-Other (Explain) (Explain) 1 i ~-~ -

_ _ _ _ _ . __ _ _ . . = _ _ . _ . _ . . . _ _ . _ _ _ _ _ . _ _ _ . _ _ _ . , _ _ __ _

{ l I

i UNIT 51,UTDOWPS AWD POWER REDUCTIOBS DOCKhT 20. 50-413  !

UNIT NAME ta m er$A 1 -

DATE v2/13/wo___ l REPORT MONTH January 1990 COMPLKibu BY x. A. niillams t PAGE 3 OF 3 TELEPHONE ( / u . ) - J o z - d.s o j

$ (1) (2) (3) (4) (5) II R MET-  !

E HOD t T A OF LICENSE W Y S SHUT EVENT SYS- CAUW AND CORRECTIVE i DOMTION O' P O DOWN REPGRT TEM COMPONENTg A TION TO i

. DATE E LG"'S N R/X NO. CODE CODE

(- PREVENT RECtJRRENCE  ;

! 10-P 38- 1-18 F --

A --

CH VALVEX  ::OLDING AT 80% POWER DUE TO STEAM L l GENERATOR "1B" LEVEL OSCILLATIONS r s ATTRIBUTED TO "1CF37"

! 11-P 98- 1-18 F --

A --

CH VA%TE EVALUATION OF STEAM GENERATOR "1B" f MAIN 1brvdATER REGULATOR VALAVE  ;

"1CF37" i 5 98- 1-18 F 51.32 A 1 CH VALVEX REPAIR STEAM GENERATOR "1B* MAIN '

4 FEEDWATER REGULATOR VAT.VE "1CF37" ,

t I

i l (1) ') (3) (4) i

F Force. Peason- Methed: Exhibit G - Instructions !
S Schedu.. ^ -Equipment Failure (Explain) s 1-Manual for Preparation of, Data l i Maintenance or test 2-Manual Scram Entry Sheets For Licenseei

_ mefueling 3-Automatic Scram Event Re rt (LERJ i 4

D-Regulatory Restriction , ,

4-Other (Explain) File (h G-0161)  !

E-Operator Training & License Examination i F-Administrative (5)

! erator Error (Explain)

G g her Exhibit I - Same Source H- (Explain) i t

I t

i

[

t f

i

. <- _ l

h10RIllLY REINELING INFORhtATION REOUEST

1. Facihty name: Catawha Unit 1
2. Scheduled next refueling shutdown: Anril 1999
3. Scheduled restart following refueling: hiav 1999 Tilli PROJECT hi ANAGER llAS llEEN ADVISED llY SEPARAT11 COhihiUNICATION OF ANY T.S. CllANGE OR LICENSE AhtENDhiENT. TilEREFORE. QUESTIONS 4 TilROUGli 6 WILL NO LONGER Bt1 hiAINTAINED IN Tills REPORT.

4, Will refueling : tesumption of operation thereafter requ re a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core con!"iguration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 123 (b) in the snent fuel pool: 2LM
8. Present licensed fuel pool capacity: 141H Site of requested or planned increase: :.-
9. Projected date of last refueling w hich can be accommodated by present license capacity:

November 2009 DUKE POWER COhiPANY DATE: February 13.1998 Name of

Contact:

R. A. Williams Phone: (704) 382 5346

,-...__.._4. , .,,,4_ _ _ , . _-, _

,_y , , , -.- - --

_ ___ _ _ _ _ _ _ _ _ _ _ _ . ~ _ . - _ _ _. -. __ ___ _._ _. _ . _ _ _ _ _ _ _ _ .

DOCKET: 50 413 UNIT: Catawba 1 Date: 02/13/98 NARRATIVli

SUMMARY

MONTil
January,1998 Catawba Unit I began the month of January in end of cycle 10 refueling outage. The refueling outage has
spanned a total of 37.75 days and was scheduled for 36 days. De outage was extended 1.33 days due to f

"Ill" velume control pump low oil pressure and 0.42 days due to additional head curve testing on "Ill" residual heat removal pump. The unit was placed on line 01/05/98 at 1610. During power escalation the i unit held at 15% power from 1759 to 1916 and at 18% power from 2000 to 2230 to soak main tu.9ine to perform turbine overspeed trip ter,t. The unit decreased power and held at 10% power for approximately 2 minutes w hen the main turbine overspeed trip test was performed on 01/06/98 at 0005. De unit was placed on.line 01.%/98 at 0500. De unit held at 20% power from 0630 to 1152 to swap main feedwater nozzles.

De unit held at 30% power from 1753 to 2355 due to required CICll power ascension testing. On 1

01/07/98 at 0719 the unit held at 49% power due to power range nuclear instrumentation system calibration and reduction of reactor coolant system fluoride concentration. The unit held at 58% power pending evaluation of power escalation ramp rate greater than 3% per hour. The unit continued power escalation.

and heid at 75% power to perform required power ascension testing. The unit returned to 100% full power i on 01/09/98 at 1010 and operated at 100% full pow er until 01/16/98 at 0900 when the unit began decreasing power. De unit held at 30% power on 01/17/98 from 0630 to 2115 to evaluate / adjust steam generator "Ill" main feedwater regulator valve packing torque. The unit resumed power escalation and held at 80% power on 01/18/98 from 0330 to 0331 to further investigate steam generator "lB" level oscillations attributed to "lCF37" main feedwater valve. The unit began decreasing power and held at 30%

power from 0907 to 1514 to evaluate steam generator "Ill" main feedwater regulator valve "lCF37". He

, unit was taken off-line 01/18/97 at 1756 to repair steam generator "Ill" main feedwater valve "lCF37".

The u it was placed on.line 01/20/98

  • 2115. The unit returned to 100% power on 01/21/98 at 1745 and operated at or near 100% full power the remainder of the month.

Prepared by: R. A. Williams Telephone: (704)- 382-5346

,,e, c. .. - -r , , ., -- ,,

4 8

ClltATIN3 DATA !!P;tt 00Clif 50  !! 414 tAtt fehtary 13. 1991 Of t'A?!!" I?Atri CORPl!TIDIf L A. Villitis tillfHIt 7tt 112 5146

1. Unit East: Citivht2 2.PeprtingPatied: January 1,IlliJituary31,Illi 3.Llettsidthernali;str(MVt): ll!!
4. Xtte;1ste lating {Gr:ss XVt): 1305' B:tes 'Ntatilate lating 5.resignIlt:tricallating(EttXVt):  !!45 (GrcliXVt) calculated 48 6.MaritusIttendahltCapa:ity(GreisXVt):  !!!2 1450.000 MVA .50 ;;ver 7.MarisusrependahltCapa:ity(XttWVt): 1129 ft:ter;ttFt;tlit, C.!! Changes 00:t: in Ct;t:lty tatings (Itta h ther 3 Tht:sih 1) !!n:t last Est!*0020.

Itp rt. Givt leistts:

i 9. ?:nti level 70 Vhi:n Itstfl:ted, If Any (Net KVt):

I -It.lets:t7:tlettricti:s.Ifsty:

ThisM:tth fr. tt Itte Ctsulttivt

11. E:urs In Itp:rting feried 744.0 744.0 10C417.0 12.IutherOfh:ursles:t:rVasCriti:al 744.0 744.0 80791.0 13.Ett:tcritserve!hutd:vnH:sts ~0~ "Da ~0~

14.H:urtGeteratorCtline 144.0 144.0 19616.1 15.UnitteserveInstd:vtH:sts ~0" -ta ~0~

16.Grcs:ThertalIttt;yGettrited(KVH) 25352(7  !$352(7 2585(4417

17. Cress lle:trical Itergy Gattrated (MV3) 111907 914907 91825160 11.EttIlt:tricalIntr;yGenerated(NVB) 170195 170195 16519517 15.UnitStriietit:ter ICO.D 100.C 79.3 20.UnitAvailthilityiteter 100.0 100.0 79.3

!!.UnitCarteltyIn:ter(Usit;K:CXtt) 103.6 103.6 78.3

22. Unit Cart:ity it:t:r {U:13; rit Xtt) It!.2 102.2 75.3 s 23.UnitI:r:tdOate;6inte t.0 0.0 1.0
24. Shutd:vn 3:heduled Over Next 6 R:tths (Typt, tite, att turati:n Of In:h):

None

25. If Stut I:vn At Itd Cf it;trt Pert:1.1stinated tite cf starttp:
26. Utits In fast Statts (Prict to C: ster:1ll Cperatica): I:rt:Ist A:hltit:1 Illf!At Ct!!!CA!!if INITIntIt! Cit:CITT COEXItCIAL 0!!!Ai!0E

0?!!Af!E3lATA!!Tt!!

IOCIIT50 !C 414 L't!T Cattura 2

!Att ferrettf 11, Illi COMPL!!!D IL t. A. Villitti

?! LITH 0l! 7M !lf !!(I CFfH Jatatti 1999

$11 AYllA311A111POV!RLIVIL [11 AVIRA01 LAILY 70VII lit!L (EVtWit) (Mit$tt) 1 till 17 1173 2 1111 18 1172 3 11H 19 1167 4 1113 20 1166

$ 11!6  !! 1174 6 11?l 22 1173 7 11!! 23 1173 8 1151 2( 1173 9 1170 25 1175 10 - 1173 26 1174 11 1173 27 1173 12 1161 il 1173 13 1172  !! 1172 14 1174 30 1173 15 1174 31 1174 16 1173

.. . . _ - . . , . _ . m.

I UNIT SHUTDOWNS AED POWER REDUCT10BS DOCKET NO. 50-414

UNIT NAME LAlant$a <

" ' ' -~~ ?

DATE uz/13/ye '~1 REPORT MONTH January 1998 COMPLE'ic.U BY x. A _. ni; J.1 - '"

TELEPHONE (ev.s-Soz-:; E D (1) (2) (3) (4) (5)

R MET- ~ "l.i' E HOD l' T A

~

OF LICENSE

N. Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE 1 O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE j NO SHUTDOWNS OR REDUCTION S t

4  !

i t

I u i 4

t

) (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions '

S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee;i C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction , ,

4-Other (Explain) File (NUREG-0161) t E-@erator Training & License Examination F-Administrative G-Operator Error (5)

Exhibit I - Same Source H-Other (Explain) (Explain) i l

4 4

~ . ,

hiONTIILY REFUELING INI ORMATION REOUEST

1. Facility name: Catawba Unit 2
2. Scheduled next refueling shutdown: Sentember 1998
3. Scheduled restart following refueling: October 1998 file PROJECT MANAGER liAS HEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CllANGE OR LICENSE AMENDMENT. TilEREFORE QUESTIONS 4 TilROUGil 6 WILL NO LONGER BE MAINTAINED IN Tills REIORT.
4. Will refueling or resumption of opesation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuci assemblics (a) in the core: .192 (b) in the spent fuel pool: L@
8. Present licensed fuel pool capacity: 1:!18 Site of requested or planned increase: ::-
9. Projected date of last refueling which can be accommodated by present license capacity:

May 2012 DUKE POWER COMPANY DATE: February 13.1998 Name of

Contact:

R. A, Williams Phone: G04) 382 5346

1 a

n DOCKET: 50 414 UNIT: Catawba 2 Date: 02/13/98 NARRATIVE

SUMMARY

MONTil: January,1998 Catawba Unit 2 began the month of January operating at 100% full power. "Ihe unit operated at or near 100% full power for the entire month.

Prepared by: R. A. Williams Telephone: (704). 382-5346 4