ML20154L666

From kanterella
Jump to navigation Jump to search
Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2
ML20154L666
Person / Time
Site: Catawba  Duke energy icon.png
Issue date: 08/31/1998
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20154L653 List:
References
NUDOCS 9810200024
Download: ML20154L666 (2)


Text

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ - - _ _ _ _ - _ .

CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT August 1998  ;

! 1. Personnel Exposure - l l

The total station liquid release for August has been compared.with'the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for August has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

I I

9810200024 981015 ?

PDR ADOCK 05000413 R PDRg

6

+

4 -

i l l

! l J

Revision 1 l

DOCKET:50 414  ;

l UNIT: Catawba 2 Date: 09/15/98

' NARRATIVE

SUMMARY

MONTH: August,1998 -

Catawba Unit 2 began the month of August operating at 100% full power. The unit began core coastdown to end-of-cycle 09 refueling outage on 08/24/98 at 0224. The unit ended the month holding at 94% power due to core coastdown to end-of-cycle 09 refueling outage.

i l

l l

l Prepared by: R. A. Williams

t. Telephone: (704)-382 5346 i

a f