CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT August 1998 1.
Personnel Exposure -
The total station liquid release for August has been compared.with'the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for August has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
I 9810200024 981015 ?
PDR ADOCK 05000413 R
PDRg
6
+
4 -
i l
l J
Revision 1 l
DOCKET:50 414 l
UNIT: Catawba 2 Date:
09/15/98
' NARRATIVE
SUMMARY
MONTH: August,1998 -
Catawba Unit 2 began the month of August operating at 100% full power. The unit began core coastdown to end-of-cycle 09 refueling outage on 08/24/98 at 0224. The unit ended the month holding at 94% power due to core coastdown to end-of-cycle 09 refueling outage.
i l
l l
Prepared by: R. A. Williams Telephone: (704)-382 5346 t.
i a
f