ML20236Q809

From kanterella
Jump to navigation Jump to search
Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2
ML20236Q809
Person / Time
Site: Catawba  Duke energy icon.png
Issue date: 05/31/1998
From:
DUKE POWER CO.
To:
Shared Package
ML20236Q186 List:
References
NUDOCS 9807210059
Download: ML20236Q809 (1)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _

l l

CATAWBA NUCLEAR STATION '

MONTHLY OPERATING STATUS REPORT May 1998

{

l l

l

1. Personnel Exposure -

The total station liquid release for May has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for May has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

l i

l-i l

i t

l l

i i

9807210059 980714 PDR ADOCK 05000413 R PDR L___-___-__-__---__--__ _ - - - _ _ _ _ - _ 0