l i,
t DOCI!! 30 413 DAf! Santaher 15,19H Oftlifl1G ITATUS CONPLITIDBf I.L sillians TILIPH0BE 704 312 5M6
..1. Unit Base: Catasha l' i2.leportingPeriod: August 1,1998 August 31,1998' 3.LicensedthersalPower(Et):
3(11 4.Raseplatelating(GrossN#e):
1305' Notes 'Nastplate Rating
-l
.5.DesignIlectricallating(NetMVe):
1145
-(GrossNEe)calculatedas
- 6. Nazines Dependable Capacity (Gross He):
1192 1450.000 MVA I.90 power
- 7. Natists Dependable Capacity (Net MWe):
1129 factorperPageill,
' 8.lf Changes 1ccur in capacity tatings (Itess Nasher 3 Through 7) Since Last '
ERIG-0020.
Report. Give leasons:
9.' Power Level To Which testricted..If Any (let NVe):
)
6 10.ReasonFortestrictions,Ifany:
j j
i ThisMonth fr. to Date cumulative I
j
- 11. Hosts.InleportingPeriod 714.0 5831.0 115488.0 13.NasherOfHoursteactorHasCritical-177.2 5081.1 91281.6' 13.ReactorleserveShutdownHours
--0-- - -
14.HostsGeneratoronLine 159.4 till.0 89861.9
- 15. Unit'teserveShutdownHours-0--
--0-. 16' Gross 7bertalInergyGenerated(HH) 537845
'16519066 29(172633 17, Gross Ilectrical Inergy Generated (HH) 188882 5501330 104207714.
~ 18. Net Ilectrical Inergy Generated (HH) 155270 5557715 98096428 19.UnitServic'efactor 21.4 85.7 77.8.
-20.UnitAtallabilityfactor 21.4 85.7 77.8
~ 21. Unit Capacity heter (Using EC Net) 18.5 81.4 75.0
- 23. Unit Capachy factor (Using DIt Net) 18.2 13.2 74.2 33.UnitforcedOutagelate 78.6 12.5 7.5 34.3hutdownScheduledOverNext6 Months (Type,Date,andDurationofIach):
NONE
- 45. 2f Shut Down At End of Report Period. Istinated Date of Startap:_
SEPTEMBER 01, 1998 36.UnitsInTestStatus(PriortoConsercialOperation):
Forecast Achieted
-IIIf!AL CRIf!CALIff IIITIAL ItICftICIff COMItCIAL OPIRATION i
9909230056 980915' PDR ADOCK 05000413 R
PH
a
...1 c
0 PIRATING DATA IIPCtf DOCIET NO-50 413 UIIT _
catasha 1 DATI $stanhar 15. 1998
~
COMPLITID BY - 1.1. Billians i
TILIPIDH 704 182 5346 C ITH
- Anaast,1H8 a
RI AVERAGE DAILT POWII LIVIL HI AVIRAGI DAILY POUIR LIVIL (NUelet)
(N8eNet)
~.1 11H 17 -
0
.2
' 11H ll 0
'3-1150-19 0
4'
'1150 20 0
'i 5:
'1148
. 21 0
1147 -
22 0
-6 7.I 554 I 23 0
20 0
8 0
9 0
25 0
10 0-26 0
'11'
'0 27 0
'.12 0
28 0
13:
0 29 0
14 0
30' 0
'15.
O
~
31 0
-16 0-N, a
e
UNIT. SHUTDOWNS-AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME tazanna 1 DATE vy/id/su REPORT MONTH August'1998 COMPLETED BY-
- g. a _. williams TELEPHONE-Live)-3u2-339e (1)
(2)
(3)
(4)
-(5)
R MET-E HOD
'T A
OF LICENSE
~
N Y
S SHUT EVENT SYS-CAUSE AND CORRECTIVE O
'P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE-7 98 7 F
584.65 A
1 SA HTEXCH ICE CONDENSER INOPERABILITY DUE TO EXCESSIVE FLOW CHANNEL. BLOCKAGE t
b (1)
(2)
(3)
(4)
F Forced Reason:
Method:
Exhibit G --Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram EntW Sheets For Licenseet C-Refueling 3-Automatic Scram (NUREG-0161))
Event Report (LER D-Regulatory Restriction 4-Other (Explain)
File i
E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-@erator Error H-Other l
n I
MONTHLY REFUELING INFORMATION REOUEST l.
Facility name:
Catawba Unit 1
]
2.
Scheduled next refueling shutdown: May 1999 3.
Scheduled restart following refueling: June 1999 l
THE PROJECT MANAGER HAS BEEN AI, VISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 i
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
{
i 4.
Will refueling or resumption of operation thereafter require a technical specification change or i
other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: j91 (b) in the spent fuel pool: 294 8.
Present licensed fuel pool capacity: J411 Size of requested or planned increase: -
9.
Projected date oflast refueling which can be accommodated by present license capacity:
November 2009 DUKE POWER COMPANY DATE: September 15.1998 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 l
l l
f.
i-DOCKET: 50-413 f-UNIT: Catawba 1
- Date: 09/15/98 l
NARRATIVE
SUMMARY
- MONTH: August,1998 Catawba Unit I began the month of August operating at 100% full power. The unit began decreasing power on 08/07/98 at 0940 and the unit was taken off-line on 08/07/98 at 1521 due to ice condenser inoperability resulting from excessive flow channel blockage. The unit remained in the outage the remainder of the month.
i Prepared by: R. A. Williams Telephone: (704)-382 5346 l-
[-
i t
l:
j p -
e.
l.
3
'0 PIRATING DATA IIP 0tf.
i.
DOCIIT 30 50-414 DATIsentanhar 15. 1998 Of1 RATING STAfD
COEPLIT U 87 a l villiams TILIFIONI-104 382 5346
- 1. Unit-Base: Catasha 2.
2i.ReportingPeriod:.Angust1,1998Asgust 31',1998-
'3.LicensedthernalPower(pt):
3411.
L 4.laneplatelating(Gross 15e):-
1305' notes 'saseplate lating -
i
- 15. Desip Ilectrical lating (Net Na):
- 1145 (Gross Nel calculated as
.l
- i. Nazinus Dependable capscity. (Gross Me):
1192 1450.000 N A I.90 power s
- 7. Naziaan Dependable Capacity'(Ret N54):
J1129 factorperPage111, 4.IfChangesOccerlacapacitylatlags(IteesNesbar3through1)SinceLast
- ntIG0020.
' j Misport. Give lessons:
j r
)
- l. Poser Level 70 Ibich testricted, If Any (Bet Ne)
10! lesson For testrictions, If any:
M This' Month T'r.to-Date Cuanlative 11'Iosts In Reporting Per15d 714.0 5831.0 105504.0 12.'feaberofBoersteactorlascritical' 744.0 5431.0 15474.0 113.-ReactorReserve'8hatdovaBoers
- - 14.BoursGeneratoronLise
' 744.0 -
5431.0-
'44703.1 15.DaltReserveShutdovasosts
--0--
--0-- -
16.GrossthernalIsergyGenerated(NW)-
2510604 19822414 275831644.
- 17.GrossIlectricalInergyGenerated(NIH).
484836 7090217 98001270=
18.IstIlectricalInergyGenerated(NH) 844040 6739764 91469046 15.UnitServicefactor-
- 100.0 100.0
-80.3 20.UnitAvailabilityFactor:
100.0 100.0 80.3.
. 21. hit Capacity Factor (Using NDC Net)~
100.5 102.4 77.5 a
121.UnitCapacityFactor(UsingDItRet) 99.1 101.0 76.6 '
,23. h it Forced Datage late 0.0 0.0 7.6 L24.ShutdosaScheduledoverBert6Noaths(Type, Daft,andDurationofIach):
-REFUELING -- SEPTEMBER 05, 1998 - 40 DAYS
';25. If Shut Down At End Of Report Period. Istinated Date of Startop:
NONE 26iUnitsInfestStatus(PriortoConsercialOperation):
Forecast
-Achieved IIITIAL CRITICALIff' IIITIALILICitICITT x
. COMERCIAL OFItATION i
e 6
0
{
-)
OFItATINGLATAIIP0tf,
- DOCIIT 30 504H
.UIIT catasha 2 j
DATIsantanhar 15,1998 CONFLITIDBT t.1. 11111ans f!LIPHC21 70f-182-5HE 2
i
~
N05711 -
Anannt 1998-E1-
. AVERAGI CAILY P0 fit LIVIL El AVIRAGI DAILY POWII LIVIL
-(HeItt)
(HeNet) 1-1149 '
17 11H i
2.
1154-11H I
=3 1155 19 11H
'(.
1155 20 1152
- 5 1151 21 1151-6 1149 22
'1150
.7.'
'1113 23 1146 8
'1112 24 1130 9 --
11H 25 1124 i
10' 1144 26 1101 11" 1145 27 1105
-l 18 1144 28 1992 13 1H3 29 1887 11 1145 30 1075 15 1H3 31.
106B 16 1H3-
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME (_Arawisa 2 DATE us/13/ve REPORT MONTH August 1998 COMPLETED BY x.
A.
williams TELEPHONE tius1.suz-das6 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Eq\\lipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Entw Sheets For Licensee.-
C-Refueling 3-Automatic Scram Event Report (LER (hWG- 0161) )
D-Regulatory Restriction 4-Ot.er (Explain)
File E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other
. -. - - ~ ~. _.
. =,......
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
Catawba Unit 2 2.
Scheduled next refueling shutdown: Scotember 1998 3.
Scheduled restart following refueling: October 1998 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
' THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or i
otherlicense amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
i
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or perform-nce analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 19),
(b) in the spent fuel pool: 600_
8.
Present licensed fuel pool capacity: 1411 Size of requested or planned increase: -
9.
Projected date oflast refueling which can be accommodated by present license capacity:
May 2012 DUKE POWER COMPANY DATE: September 15.1998 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 t
I
---.e,
. _..... ~ _ -..
I' i
1 l
1 I
l-l l
DOCKET: 50 414 l
UNIT: Catawba 2 j
Date: 09/15/98 NARRATIVE
SUMMARY
MONTH: August,1998 Catawba Unit 2 began the month of August operating at 100% full power. The unit operated at or near 100% full power for the entire month.
i l
1 i
1 Prepared by: R. A. Williams Telephone: (704)- 382-5346 i.