Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
-
l i
i .
0?!!ATING IATA P2PCRT I j DOCIIT NO 50-413 DATE March 13,1998 i OPIRATII STATUS COMPLITID BY R.A. Villitas TILIPHONI 704 382-5346 1.UnitNase:Catarha1 2.ReportingPeriod: February 1,1998-february 28,1998 3.LicensedThernalPower(MVt): 3(11 4.NaseplateRating(CrcssMVe): 1305' 50tes 'Nateplate Rating l 5. Design Electrical Rating (Net MVe): 1145 (GrossMVelcalculatedas {
- 6. Marista Dependable Capacity (Grcs: MVe): 1192 1450.000 MVA % .90 power 7.MazinusDependableCapacity(NetMWe): 1129 facterperPage111, 8.IfChangesOccurinCapacityRatings(ItemsNutber3Through7)Sincelast NURIG-0020.
Repert. Give Reasons:
- 9. Fever level To Which Restricted, If Any (Net MVe):
- 10. Reasen for Restricticns, If any: 1 ThisMonth fr. to-Inte Ctsalative
- 11. Ecurs In Reporting Period 672.0 1116.0 111073.0 12.NutherOfEcursReacterVascritical 672.0 1299.5 87500.0
- 13. Reactor Reserve Shutdcyn Hours 0-- - -
14.EcursGeneraterOnline 672.0 1247.6 86111.6 15.UnitReserveShutdcraHours 0-- - - l 16.GrcssThersalInergyGenerated(MVH) 225(618 3965;82 281798749 )
17.GrcssIlectricalInergyGenerated(MVH) 812291 1419500 99725884 !
18.NetIlectricalInergiGen: rated (MVH) 770607 1335901 93874614 !
19.UnitServicefacter 100.0 88.1 77.5 l 20.UnitAvailabilityFacter 100.0 88.1 77.5 ,
- 21. Unit Capacity factor (Using MDC Net) 101.6 83.6 71.7 l 22.UnitCapacityFatter(Usin;CIINet) 100.2 82.4 13.8
- 23. Unit forced Outage late 0.0 4.0 7.2 24.ShutdcynScheduledOverNext6Ilnths(fire,Date,andDurationofIach):
None 25.IfShutDevnAtIndofReportPeriod.IstinatedDateofstartup:
26.UnitsInfestStatus(8lertoCcIIercialOperatien):
t Forecast Achieved l
INITIAL CRITICALIff INITIAL ILICYRICIff COMMIRCIAL OPERATICN 9803170448 980313 PDR ADOCK 05000413 R PDR -
r-CPIRATING LATA !!P0tf l
j DOCKIf NO 50-413 ITNIT catasha 1 LATE March 13. 1998 _
COMPLITED BT 1.1. Villians
- TILIP110NE 704-382-5316 l
t MONTH Pehrunn.1998 l
El AVitAGICAILYPOWERLIVIL B1 AVIRAGI CAILY POWit lift 1 ,
(NWeNet) (NVe-Net) 1 1172 17 1162 2 1170 li 1166 3 1167 19 1167
- 4 1166 20 693 5 1169 21 1098 !
l E 1170 22 1165 7 1169 23 1155 ,
t 8 1167 2( 1167 l
9 1164 25 1168 <
l 10 117b 26 1168 11 1165 27 1163
'12 1166 28 1164 I 13 1168 14 1168 ,
)
l- 15 1168 l I
16 1155 j i
I
e s e se nas e
' m e otn c as iae r i d tDc u l -
ci o z ufL) S
_ 1 l E ro R) ui u G t rE1 e ay w J G A snoL6 m s
3 t / -
E' N K noF(1 a 1 n 3 . i V E I A Ii 0 S 4 a.1 a s I C R E tst-u T
- i / T N L atrG -
ON msu x C E 0 . i reoE 5 t E R E M G a e pR I ROR EM E pneU
- RTU GN T teSRN ( t
.EEYE O-C NG S ir i OMTBN CNE AI Y b NAA O NDDH DI OR LL FA S bPwt i ne i r h r t el h EP NTT T xonvi x T TE ACN LE N aI CN LE EL AE E V EV SL A
L
)EfEEF )E 4
(
5
(
OU PT S E SA ON
- D M U R EV OO
_ O A P V CI
- C C F T m)
_ RF OO RA OL an
_ ri TU mca
_ T-CK CC aSl
- AA AL r p
. EE EA ccx RL
- RC SiE
- S t( _
N lla O T :aamr .
. I N X U duuoe T
C 8
)
5 E
NE V E R T
onnth haaut -
_ U 9 (
OD L S tMMAO D 9 PO A N e-E 1 MC V I )M1234 R O 3 y C (
R
- r n E a - E o
. W u ) SMD A B i O r 4 YEO C C t
_ P b (
STC a
- e I n
D F i N E m A S T a NTR x
- S ENO. E N CEPO W H IVEN ) e G T LER n s u N i n r O a e )
u M - TN l c n H )TD UWX - - p ni.
S ' 3EOFHO/ - - x oI a i
+ (MHOSDR E i l T (t t. & p I
N T ) s c x E 2 A B ee ig E
_ U R (REASON rt rn (
_ u ti )
N O
lr snern io ei v oi a R ai r a
_ IS Fe rtrl TR - - c yT aE p
- AU - - tngr r x RO nanortrE UH enitoso(
D m el a tit .
pt el a n a r ni n u u ri r e
) o u if ge m eh 1 TYPE F F s qa e e pd pt
(
aEMRROAOO e-
)RABCDEFGH 0 0 2 2 2 (
E 2 2 d T e A - - l D 8 8 du 9 9 ed ce rh
- P P oc
- - FS NO . 2 3 1 1 )FS 1
(
f I
I
. MONTHLY REFUELING INFORMATION REOUEST I
- 1. Facility name: Catawho Unit 1
- 2. Scheduled next refueling shutdown: ' April 1999 i 3. Scheduled restart following refueling: May 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICA flON OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
1
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: j9),
(b) in the speni fuel pool: 204
- 8. Present licensed fuel pool capacity: 1418
. Size of requested or planned increase: =
- 9. Projected date oflast refueling which can be accommodated by present license capacity:
November 2009 i
DUKE POWER COMPANY DATE: March 13.1998 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 I
l l
I i
t i
DOCKET: 50-413 UNIT: Catawba 1 Date: 03/13/98 NARRATIVE
SUMMARY
MONTH: February,1998 Catawba Unit 1 began the month of February operating at 100% full power. On 02/20/98 at 0800 the unit -
began decreasing power and held at 16% power from 1515 to 1645 due to reactor vessel flange o-ring leak-off valve alignment. The unit increased power and held at 20% power from 1725 to 1830 due to reactor coolant system leakage calibration. The unit returned to 100% power on 02/21/98 at 1351 and operated at or near 100% full power the remainder of the month.
Prepared by: R. A. Williams Telephone: (704)- 382-5346 i
I .
0 PIRATING DATA !!P0tf DOCKIf R: 50-414 IAfsharch 13,1998 OPIRATII" ITATUS COMPLIf!DBY R.K. Willians TILIPHONE 704-382-5346 1.UnitNase: Catawba 2 2.RepcrtingPeriod: February 1,1998 february 28,1998 3.LicensedThersalPower(MVt): 3(11 4.NaseplateRating(GrcssMVe): 1305' Notes 'Naseplate Rating
- 5. Design klectrical Rating (Net MVe): 1145 (GrossMVe)calculatedas 6.MariststependableCapacity(GrcssXVe): 1192 1(50.000 MVA z .50 pcwer 7.MaristsDependableCapacity(NetMVe): 1129 factcrperPageill, 8.IfChangesoccurincapacityRatings(ItessNumber3Thtcu;h7)Sincelast NURIG-0020.
Report. Give leasets:
- 9. Pcuer Level to Vhich testricted, If Any (Net MVe):
10.Reasonfertestricticns,Ifany: _ _ _
ThisMonth Tr. to-Date Cutulative
- 11. Hours In Reporting Period 672.0 1416.0 101089.0 12.NutherOfEcursteacterVasCritical 672.0 1416.0 81463.0 13.ReactorReserveShutdownEcurs 0-- - --0--
- 14. Hours Generator Cn Line 672.0 1416.0 80288.1
- 15. Unit teserve Shutdcyn Hours - 0- -
16.GrossThernalItergyGenerated(MVH) 2284906 4820153 260829383
- 17. Gross Electrical Intrgy Generated (MVH) 825672 1740579 92651632 18.NetIlectricalInergyGenerated(MWH) 785868 1656063 87385385 19.UnitServicefacter 100.0 100.0 79.4 20.UnitAvailabilityFacter 100.0 100.0 79.4 J
- 21. Unit Capacity facter (Usitg D C Net) 103.6 103.6 76.4 j 22.UnitCapacityfacter(UsingIIINet) 102.1 102.1 75.5 j 23.UnitforcedOutagelate 0.0 0.0 8.0 j 84.ShutdcrnScheduledOverHert6 Months (Type, tate,andDurationofIach): :
Nonec
]
i
- 25. If Shut Down At End Of leport Period. Istinated Date of Startup: I 26.UnitsinfestStatus(PricttocessercialOperatien): Ferecast Achieved 0
IIIf!AL CRITICALITT INITIAL IIICTRICITY COMMIRCIAL OPIRATIOV t
OPIRATING DATA RIP 017 1
D00 KIT N3 50 414 L'XIT Catawba 2 DATEMarch 13. 1998 COMPLITID BY R.A. Willians TILIPHONE 704-382-5346 MONT]! fahruary 1998 B1 AVIRAGI DAILY POVII LIVIL M1 AVIRAGE IAILY POVII LIVIL (MVeXet) (XVe-Net) 1 1174 17 1163 2 117? 18 1170 3 1170 19 1172 I
4 1171 20 1173 5 1172 21 1174 6 1173 22 1174 j 7 1174 23 1172
]
8 1174 24 1172 9 1173 25 1172 10 1174 26 1171 11 1171 27 1166 12 1170 28 11i.f 13 1172 14 1173 15 1169 16 1117 l
e s e s nas e _
6 otn c
- m 4 iae r a3 tDc u i 3 c ,i o l - ufL) S l z 2 si s ro R) t rE1 e swa . snoL6 m 4 a/
1 s E noF(1 a t 4 .) V E Ii 0 S 4 n 1 a s I C tst-
- e/ u T N atrG -
0 r s . v C E reoE 5 n u x (
E R I U ROR pne GaepM RTU teSR ( t
.EEYE O C ir i OMTBN CNE b NAA O NDDH DI OR bPWtne i i h rt el h T EP NTT xonvi x tT TE ACN
)EfEEF )E KI EL AE 4 5 CN LE E V ( (
OU PT S E
_ D M U R
_ O A P
_ C C m)
_ an ri mca aSl r p ccx
_ SiE S t(
N lla O T :aamr
_ I N duuoe
_ T ) E onnth
_ C 8 5 NE haaut U 9 (
OD tMMAO D 9 PO e-E 1 MC )M1234
_ R y O 3 C
_ (
_ R r n E a
- E o W u ) SMD i O r 4 YEO t P b ( STC S a _
e n
. D F N i N
- E O m A S T I a NTR T x S
N ENO.
CEPO U C E m W H IVEN D ) e
- O T LER E n s u N R i n r O a e) u M - TN l c n h
S T )TD 3EOFHQ- UWX p x
ni i oL a _
R (MHOSD~ E i l T O 4 (t t& p I- P ) R s c x
_ N E 2 O ee ig E U R (REASON rt rn (
u ti )
S lr snern N N io ei v oi O W a R ai r a IS O Fe rtrl
. TR u c yT aE p AU r tngr r x RO u nanortrE UH H enitoso(
D S melatit pt el a n a r ni n u u ri r e
) O o u if ge m eh 1 TYPE N s qa e e pd pt _
(
aEMRROAOO _
e- _
)RABCDEFGH _
2 _
( .
E d _
" T e .
A l .
D , du .
ed ce rh e oc FS NO.
)FS 1
(
', e l
l .
!- MONTHLY REFUELING INFORMATION REOUEST i
- 1. Facility name: Catawba Unit 2 l
- 2. Scheduled next refueling shutdown: October 1998
- 3. Scheduled restart following refueling: November 1998 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF l ANY T.S. CHANGE OR LICENSE AMENDMEN T. THEREFORE, QUESTIONS 4 I THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumpic of operation thereafter require a technical specification change or ;
otherlicense amendment? j l
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action an. apporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or ,
performance analysis methods, significant changes in design or new operstmg procedures). l I
- 7. Number of Fuel assemblies (a) 9 in the core: ]91 l l (b) in the spent fuelpool: 69Q
- 8. Present ficensed fuel pool capacity: &
Size of requested or planned merease: = 1
- 9. Projected date oflast refueling which can be accommodated by present license capacity: l May 2012 j
DUKE POWER COMPANY DATE: March 13.1998 j i
Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 L
l' i
i l
I
I
~
I-l DOCKET: 50-414 l,
UNIT: Catawba 2 Date: 03/13/98 NARRATIVE
SUMMARY
MONTH: February,1998 f
Catawba Unit 2 began the month of February operating at 100% full power. The unit operated at or near 100% full power for the entire month.
l l
l l
l l
l Prepared by: R. A. Williams i Telephone: (704) 382-5346 I
l' t-l t