MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
0 PIRATING DATA RIPORT DOCKIT NO $0-(13 CATI Acril 15,1998 0FIRATIN" STATUS COMPLITID BY R.A. Willians TILIPHCNI 704-392 5346
- 1. Unit Nane: Catarba 1
- 2. Reporting Period: March 1, 1998 March 31, 1998 3.LicensedThernalPower(MWt): 3(11 <
(.HaseplateRating(GrossMWe): 1305' Notes 'Naseplate Rating
- 5. Design Ilectrical Rating (Net MWe): 1145 (GressMWe)calculatedas 6.NazisusDependablecapacity(GrcssMWe): 1192 1(50.000 MVA x .90 power
- 7. Maxinus Dependable capacity (Net MWe): 1129 facterperPage111, 8.IfChangesOccurinCapacityRatings(ItetsNuther3Through7)SinceLast HURIG-0020.
Repcrt. Give Reasons:
- 9. Power Level T.c Which testricted, If Any (Net MVe):
10.ReascaforRestrictions,Ifany:
ThisM0 nth Tr. to Date Cuzulative 11.HoursInleportingPeric:1 744.0 2160.0 111817.0 12.NutherOfHoursReacterWasCritical 7H.0 20(3.5 182(4.0
- 13. Reactor feserve Shutdcrn Ecurs - -
- 14. Hours Generater On Line 7H.0 1991.6 86855.6
- 15. Unit Reserve Shutdcyn Ecurs 0-- - 16.GrossThersalInergyGenerated(MWH) 2533159 6(98311 284331908
- 17. Gross Ilectrical Inergy Generated (MWH) 913182 2332982 100639366 18.HetElectricalEnergyGenerated(MVH) 867576 220307 94742190 19.UnitServicefacter 100.0 92.2 77.7 20.UnitAvailabilityTactor 100.0 92.2 77.7
- 21. Unit Capacity facter (Using MDC Net) 103.3 90.4 74.8 22.UnitCapacityFacter(UsingCIRNet) 101.8 89.1 74.0
- 23. Unit forced Outage late 0.0 2.5 7.1
- d. Shutdcun Scheduled Over Next 6 Months (Type, Date, and Duration of Iach):
None SIf Shut Devn At Ind Of Report Period. Istiaated Iate of Startup:
26.UnitsInTestStatus(PricttoCeanercial0;eratica), forecast Achieved IIITIAL CRITICALITY INITIAL It!CTRICITY COMMERCIAL OPIRATION 9804220460 980415 PDR ADOCK 05000413 R PDR
OPIRATING DATA IIPORT DOCIIT NO 50-413 UNIT Catawba 1 DATI Acril 15. 1998 COMPLITID ST R. A. Willian 7:LIPh0NI 704 382 5346 M0 rih March. 1999 BI AVIRAGI CAILY PCWIR LIVIL M1 AVIRAGI DAILY P0WIR LIVIL (MiieNet) (MWeNet) 1 1162 17 1170 2 1164 18 1169 3 1166 19 1165 4 1166 20 1162 5 1163 21 1170 6 1165 22 1170 7 1166 23 1170 0 1161 24 1169 9 1163 25 1169 10 1170 26 1166 11 1170 27 1162 12 1171 28 1162 13 1172 29 1162 l 1
14 1170 30 1160 15 1170 31 1158 15 1170 l
e s e se nas e me otn c iae r a d tDc u i d c ,i o l - ufL) S l z ro R) 1 ei u t rE1 e vWJ ~ . snoL6 m 3 a/ - E noF(1 a 1st d .) V E Ii 0 S 4 w 1 A s I C tst-
- e/ u T N atrG -
0 r e . f C E reoE _
5 a v x (
E R GaepR I u ROR pheU -
RTU teSRN ( t
.EEYE OMTBN O C CNE ir i b
NAA O OR bPytne i i -
NDDH DI h r t el h T EP NTT xonvi x ET TE ACN )EfEEF )E KI EL AE 4 5 CN LE E V ( (
OU PT S E D M U R O A P C C m) an ri _
mca _
aSl r p ccx SiE S t(
N lla _
O T :aamr _
I N duuoe T ) E onnth C 8 5 NE haaut U 9 (
OD tMMAO D PO 9 e- _
E 1 MC )M1234 _
R O 3 h C (
R c n E r - E o W a ) SMD i O M 4 YEO t P (
STC S a n
D N i N E O m A S T I a NTR T x S ENO. C E E CEPO U W H IVEN D ) e O T LER E n s U N R i n T O a e)
U M - TN l c n H )TD UWX p ni i S T 3EOFHO/ x oL a R (MHOSDR E i l T O (t t& p I P ) R s c x N E 2 O ee ig E U R (REASON rt rn (
u ti )
S ,
lr snern N N io ei v oi O W a Raira IS O Fe rtrl TR D c yT aE p AU T tngr r x RO U nanortrE UH H enitoso(
D S m el a tit pt el a n a r ni n u u ri r e
) O o u if ge m eh 1 TYPE N s qa e e pd pt
(
aEMRROAOO e-
)RABCDEFGH 2
(
E d T e A l D du ed ce rh oc FS NO .
)FS 1
(
i
. MONTilLY REFUELING INFORMATION REOUEST
- 1. Facility name: Catawba Unit 1
- 2. Scheduled next refueling shutdown: April 1999
- 3. Scheduled restart following refueling: May 1999 Tile PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 i THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? l 1
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing consideta.tions (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: j9]
9 l (b) in the spent fuel pool: 204 i
- 8. Present licensed fuel pool capacity: 1418 l Size of requested or planned increase: =
- 9. Projected date of last refueling which can be accommodated by present license capacity:
November 2009 DUKE POWER COMPANY DATE: Ap_ rill 5.1998 Name of
Contact:
R. A. Williams Phone: (70 0 - 382-5346
DOCKET: 50-413 UNIT: Catawba 1 Date: 04/15/98 NARRATIVE
SUMMARY
. MONTil: March,1998 Catawba Unit I began the month of March operating at 100% full power. The unit operated at or near 100% full power for tne entire month.
Prepared by: R. A. Williams Telephone: (704).382 5346
r 1 l i l l l ,
l 0 PIRATING CATA !!P0tf
, DOCIIT NO $0-414 l EATI Anril 15. 1998 DPIllflE STATUS COMPLITID Bf R. A. Villians l
!!LIPHONI 704-382 5346
- 1. Unit Nase: Catarta 2
- 2. Reporting Pericd: March 1,1998 March 31,1998 j l
L 3.LicensedthersalPcver(MVt): 3411 4.Naseplatelating(GrossMVe)* 1305' Notes 'Hastplate lating 2 5.DesignIlectricallating(NetMWe): 1145 (GrossMWe)calculatedas 6.MaIlsusDependableCapacity(GrcssMVe): 1192 1450.000 MVA I .90 power l factorperPageill,
- 7. MaIlsus Dependable Capacity (Net MVe): 1129 O.IfChangesOccurinCapacitylatings(ItessNusher3Thtcugh7)SinceLast NURIG-0020.
- tepcrt. Give letscns:
- 9. Power Level To Which testricted, If Any (Net NWe):
- 10. tensca for testrictions, If any:
ThisMenth Tr. to Date Cusulative l-
- 11. Hours In Reporting Period .
-744.0 2160.0 1018?3.0 12.NusbarOfHoursteacterWasCritical 744.0 2160.0 82201.0 13.ReactorteserveShutdevnHours --0-- - i 14.HoursGeneraterOnLine 744.0 2160.0 81032,1 15.UnitteserveShutdevnHours 0-- 16.GrossThersalInergyGenerated(MVH)' 2532617 1352770 263362000 17.GrossIlectricalInergyGenerated(MVH) 913996 2654575 93565628
.10.NetIlectricalInergyGenerated(MVH) 869476 2525539 88254061 19.UnitServicefactor 100.0 1C0.0 79.6 20.UnitAvailabilityFacter 100.0 100.0 79.6 21.UnitCapacityTacter(UsingMDCNet) 103.5 103.6 76.6 22.UnitCapacityFactor(UsingIIINet) 102.1 102.1 15.7 23.UnitforcedOutageAate 0.0 0.0 1.9
-2(.ShutdcynScheduledOverNext6 Months (Type,Date,andDurationofIach):
None 25.IfshutDevnAtIndofleportPeriod.IstinatedDateofStartup:
26.UnitsInfest$tates(PriortoCessercialOperation): Ferecast Achieved INITIAL CRITICALIff INITIALIIICftICIff COMMIRCIAL OPIRATION l
0 PIRATING DATA IIPOIT 00CIIT N0 50 414 UIIT Catawh 2 l DATI Acril 15. 1998 ;
COMPLITID BT R.A. Villi us TILIPEONI 704 382 5346 ,
l I
l NCI?11 March.1998 Ul AVIRAGI DAILT POVII LIVIL LM AVIRAGI DAILT POVIR LIVIL (MVeNet) (NVeNet) i 1 1170 17 1172 i
2 1172 18 1172 i l
3 1174 19 1168 l
l 4 ,1173 20 1164 l
5 1m u 1m
. m3 a _
m, i l
7 1173 23 1172 8 1165 24 1172 9 1168 25 1172 10 1170 26 1167 11 1171 27 1162 12 1174 28 1162 13 1173 29 1146 14 1169 30 1157 15 1171 31 1156 16 1172
e s e s.6 nas e m4 otn c iae r a3 tDc u i 3 c ,i o l - ufL) S _
l 2 ro R) _
2 u i 6 t rE1 e sw3 ' snoL6 m -
4 A / - ,E noF(1 a 1 si d . J V E Ii 0 S 4 w 1 A s I C tst-
- 4/ u T N atrG -
0 1 s . /
C E reoE 5 A u x( E R G a e pR I C ROR pheU RTU teSRN t
.EEYE O C ir ( i -
OMTBN CNE b NAA O NDDH DI OR bPWtne i i h r t el h T EP NTT xonvi x ET TE ACN )EfEEF )E KI EL AE 4 5 CN LE E V ( (
OU PT S E D M U R O A P C C m) an ri mca aSl r p ccx SiE S t(
_ N lla
_ O T :aamr
_ I N duuoe T ) E onnth C 8 5 NE haaut .
U 9 (
OD tMMAO _
D 9 PO e- _
E MC 1 )M1234 _
R O 3 -
h C (
R c n _
E r
- E o _
W a ) SMD ,i O YEO M 4 t
_ P (
STC S a -
n D N ,i __
N E O m A S T I a NTR T
- x S ENO. C E
_ N CEPO U W H IVEN D ) e 0 T LER E n s v N R i n
- r O a e) u M - TN l c n H ) TD UWX p ni i
- S T 3EOFHO/ x oL a R (MHOSDR E i l
- T O (t t& p
- I P ) R s c x
_ N E 2 O ee ig E
- U R (REASON rt rn (
u ti )
S lr snern
_ N N io eivoi O W a R ai r a IS O Fe rtrl
_ TR u c yT aE p
_ AU r tngr r x RO u nanortrE
. UH h enitoso(
_ D S melatit pt el a n a r ni n u u ri r e
) O o u if ge m eh 1 TYPE N s qa e e pd pt
(
aEMRROAOO e-
)RABCDEFGH 2
(
E d T e A l D du ed ce rh oc FS NO .
)FS 1
_ (
4 MONTHLY REFUFLING INFORMATION REOUEST j
- 1. Facility name: Catawba Unit 2
- 2. Scheduled next refueling shutdown: October 1998 3.' Scheduled restart following refueling: November 1998 Tile PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or ]
other license amendment? j i
- If yes, what will these be?
l if no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 36
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: =
- 9. Projected date oflast refueling which can be accommodated by present license capacity:
May 2012 DUKE POWER COMPANY DATE: April 15.1998 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346
)
1
j DOCKET: 50-414 UNIT: Catawba 2 Date: 04/15/98 I
i NARRATIVE
SUMMARY
MONTil: March,1998 Catawba Unit 2 began the month of March operating at 100% full power. The unit operated at or near 100% full power for the entire month.
l l
I l
l I
i I
Prepared by: R. A. Williams Telephone: (704)- 382-5346