ML20247K445
Jump to navigation
Jump to search
| ML20247K445 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/30/1998 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20247K442 | List: |
| References | |
| NUDOCS 9805220098 | |
| Download: ML20247K445 (2) | |
Text
--
i
~
O l
i i
DOCKET: 50-413
/
l l
UNIT: Catawba 1 Date: 05/15/98 l
NARRATIVE
SUMMARY
i MONTH: April,1998 l
Catawba Unit I began the month of April operating at 100% full power. The unit operated at or near 100%
full power for the entire month.
I I
i Prepared by: R. A. Williams Telephone: (704)- 382-5346 l
s 9905220098 990515 PDR ADOCK 05000413 R
DOCKET: 50-414 UNIT: Catawba 2 Date: 05/15/98 NARRATIVE
SUMMARY
MONTH: April,1998 Catawba Unit 2 began the month of April operating at 100% full power. The unit operated at or near 100%
full power for the entire month.
i Prepared by: R. A. Williams Telephone: (704)- 382-5346
_ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _,