ML20247K445

From kanterella
Jump to navigation Jump to search
Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station
ML20247K445
Person / Time
Site: Catawba  Duke energy icon.png
Issue date: 04/30/1998
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20247K442 List:
References
NUDOCS 9805220098
Download: ML20247K445 (2)


Text

-- _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ - _ - _ - - _ _ _ - _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ - _ _ _ _ - _ _ _ _ - . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ -

i

~

O l

i i

DOCKET: 50-413 /

l l

UNIT: Catawba 1 Date: 05/15/98 l

NARRATIVE

SUMMARY

i MONTH: April,1998 .

l Catawba Unit I began the month of April operating at 100% full power. The unit operated at or near 100%

full power for the entire month.

I I

i Prepared by: R. A. Williams  ;

Telephone: (704)- 382-5346  !

l s

9905220098 990515 PDR ADOCK 05000413 R PDR ,

DOCKET: 50-414 UNIT: Catawba 2 Date: 05/15/98 NARRATIVE

SUMMARY

MONTH: April,1998 Catawba Unit 2 began the month of April operating at 100% full power. The unit operated at or near 100%

full power for the entire month.

i Prepared by: R. A. Williams Telephone: (704)- 382-5346

_ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,