ML20247K445

From kanterella
Jump to navigation Jump to search
Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station
ML20247K445
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/30/1998
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20247K442 List:
References
NUDOCS 9805220098
Download: ML20247K445 (2)


Text

--

i

~

O l

i i

DOCKET: 50-413

/

l l

UNIT: Catawba 1 Date: 05/15/98 l

NARRATIVE

SUMMARY

i MONTH: April,1998 l

Catawba Unit I began the month of April operating at 100% full power. The unit operated at or near 100%

full power for the entire month.

I I

i Prepared by: R. A. Williams Telephone: (704)- 382-5346 l

s 9905220098 990515 PDR ADOCK 05000413 R

PDR

DOCKET: 50-414 UNIT: Catawba 2 Date: 05/15/98 NARRATIVE

SUMMARY

MONTH: April,1998 Catawba Unit 2 began the month of April operating at 100% full power. The unit operated at or near 100%

full power for the entire month.

i Prepared by: R. A. Williams Telephone: (704)- 382-5346

_ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _,