|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
{{#Wiki_filter:_ __. _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ ___
l
=
i Of!!Af!IG !!?A W Jtt j f
00Citt 30 50113 }
TAftlstcart 1L lill- !
Cf111tifLif1tn C0HLIf!DIf f.L V1111E f fit!Fest 7tt.112 5316 t
.l. Unit Inst Catevb4 1 !
- 2. Repciting Feriod: teetther 1. lil14tettbar !!, liff !
- 3,heensedtherealfcser(Et): 3411 -{
- 4. Etteplatt latist (Gress pt!! 130$' Astes 'Nastritte lating :
5.Desi;nlitetricallating(Ittto): 11(5 (Grcss E t) et!ctlated as !
- 4. Witiets tependthlt Capacit! IGress pt): !!!! 1450.000 U A .30 peser r 14 Nat!Inl Dettadahlt Captcity (Bet pt): 1121 . factorForfaitliir , i
- 1. !! Changes Ocent in Captcity latings (Ittes heter 3 throtth 1) Illet tatt nut!G4020.
tepert.GiveItasets:
- 1. Peter titel to Vtick lastrictti, !! Any (Net S t): -
e
- 10. lessen for testrictions, If sty: !
j I
ThisNettt Tr.1044tt Castletift [
11.EcursIntiptrtietFtried 144.0 1760.0 lHn1.t !
!!.TJerofHosts!steteritsCritical 0.0 1164.7 86200.5 .
13.ItactertiltritshutdevnHctra "0" -4~ 4~ '
- 14. Hours Generater On41st 0.0 7145.2 84114.0
- 15. Unit teserve stitdeva Monts .
4~ "0- ~0~ *
- 16. Grcss thereal Initty Guersted (NH) 0 17130104 277833567 ;
- 17. Grcs: Iltetrical Intigt Gtterated (WH) 0 tiill18 18306311 l' Ett !!tetrical Intrgf Otterated (HH) 4 198 1143347 12531713 i
- 19. Unit fervice facter 0.0 90.9 77.4 J 20.UnitArtilthi!!ttfacter 0.0 10.8 17.4 l 21.UtttCapacittfactet(UsittECVet) 0.0 12,1 74.5-22.UnitCapacitiiteter(Uslagtillet) 0.0 11.6 13.7 :
- 23. Unit fcreed Outti late. .
0.0 0.0 1.2 4 24/ $httdown 8cheduled Citt itzt I letth (77pe, tatt, sai turatica cf Itch):
Current 1v Refuelinst ,
- 25. !! stat tcrn At tai of tercrt fatics. Istimated tite ci startup- January 05. 1998 '
- 26. Calts in fest 8tatus {Prict to Consercial Citratical: ferecast Actiefed !
. t
..Illt!AtClif! cat!!T-151tIntIt!Cft!Clff-COH!!CIAL OFI1Af!0N -
f 4
v 3
?
e-w, 4._ m , e .- , . om
l l
ClilAf!!;IATA!!?lf I D00!!! la IN11 r:1f titarb 1 .
I ATI Junti 15, Ill'8.
00X?1tt!Dif 1.1. Villi nt Y!LITF.3t ftt'!!!*llli RONTH fetadtr,1997 Ill AVIRAGIIAILT70f!11tVIL [11 AVitAtIA!LYFCViti!V!1 (NVtEtt) (EWiItt) 1 0 11 0 2 0 il 0 3 6 !) 0 0 20 0 4
5 0 !! 0 6 0 !! 0 7 0 23 0 0 0 24 6 i _
0 25 0 10 0 26 0 11 0 27 0
!! 0 !! 6 13 0 29 0 14 0 30 0 _
15 - 0 31 0 ti -- 0 2.
A..
UNIT SHUTDOWNS AND POWER REDUC. T IONS DOLAbr NO. 50-413 UNIT NAME taAAnnA 1 DATE vA/13/vo REPORT MONTH December 1997 COMPLt;lhu BY x. A _. nilliams TEMPHONE t i u s ) - J o t - d a s.6 (1) (2) (3) (4) (5)
R MET-E HOD T A OF LICENSE -
N Y S SHUT EVEhT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPCRT TEM COMPONEh7 ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 1 97 1 S 744.00 C --
RC FUFlJJC END-OF-CYCLE 10 REFUELING OLTAGE
-i
(
I a
i (1) (2) (3) (4) !
F Forced Reason: Method: Exhibit G - Instructions '
S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Re rt (LER)
D-Regulatory Restriction ,
4-Other (Explain) File ( G-0161)
E-Operator Training & License Examination F-Kdministrative (5)
G-u' perator Error Exhibit I - Same Source H-Other (Explain) (Explain) l i
i i
l
.y. -- --- . - - , - - . . , - -
- . _ . . ,s - ~ '
DOCKilT: 50 413 UNIT: Catawba 1 !
Date: 01/15/98 NARRAT1Vil 5Uh1M ARY MONTil: Decemter,1997 Catawba Unit i began the month of Decomter in end of cycle 10 refueling outage. The unit was in the refueling outage the remainder of the month, t
Prepared by: R. A. Williams Telephone: (704) . 382 5346 i
i MON 11tLY Rill 0El ING INFORMATION REOUEST
- 4. Facility name: Catawba Unit 1 1
- 2. Scheduhl nest refueling shutdown: Currentiv Refueline 3 Scheduled restart following refueling: January 1998 Till! PROJI!CT MANAGER llAS llEEN ADVISED 11Y SEPARAT11 COMMUNICATION OF ANY T.S. CllANG13 OR LICENSB AMENDMENT. TIIEREFORE QUESTIONS 4
'IllROUGil 6 WILL NO LONGER llE M AINTAINED IN Tills REPORT, ,
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committec legarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information,
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the care: 121 (b) in the speat fuel pool: Ifli H. Present licensed fuel pool capacity: 111][
Sire of requested or planned increase: :,:
- 9. Projected date of last refueling which can be accommodated by present license capacity:
November 2000 r
DUKl! POWER COMPANY DATT!: lanuary 15 122fl Name of
Contact:
R. A. Williams Phone: G04). 382 5346
CillATI5G tifA !!P017 D00t!7IS !0414
!!!! Jattarf !!. Illi CPIfitII: ITA7:1 C0Kilit!DIf f.L fillitti T!!!!E!! 704 311 !146 1.EtitIlyt:Citinh: 2
- 1. Itprtitt Perled: It:tther 1, lil14tett:tr ll, Ill?
3.LicitltoThir8tlf;vtr(RVt): 3(11 4.Etttplitttititt(GrcstWVil' 1305' letts 'InttTltte litit;
- 5. test;ntiettricallating(EttKVt): 1145 (GressEvtlcaleclated4:
- 1. Natit:s lettaditle Capeiti (Grcs: MVt): 1192 1450.000NVAI.90Fost'
- 1. Maritt it;ttdahlt Capacitt (Itt XVt): 1111 fatterperPt;t111,
- l. !! Chattas Decar in Carncitt latings (!tets Xuther 3 through 1) Sitet inst Est!G0020.
let:tt. Gift tiastal:
- 9. Pcvtr titel 10 Yhich itstricted, If Ati (Ett MVt):
- 10. tensen fct festricticti, !! tri:
ThisMcath it te 4 ate Ctatittift 11.E:ursititprtit;Fetted 144.0 8160.0 19613.0 12.RetherCfH:ursita:terWascritical 144,0 1611.9 80041.0 13.let:terReservelhutd:vaRetts 4~ t- ~0~
- 14. H:urs Generator Ct41st 1(4.0 1825.1 18l12.1 15.Unititsette$tutdtvtR:urs ~0~ 4- ~0~
15.GressthettaltterlyGenerated(MVE) 2531903 25211154 2560tt!!0
- 11. Crest Iltetrical Itergi 3tterated (MWH) 116015 Mitt!0 IH11053
- 11. Iet Ile:trical tatt;f Generated (MVE) 841116 15t!(30 15121322 19.Cait1stviceinster 100.0 81.1 11.1
- 10. tait Availthility it:ter 100.0 11.1 19.1
- 21. Unit Catecity latter {Csing EC Net) 103.6 li.8 11.1
!! Unit capacity facter (Using !!! Kat} 102.1 15.5 15.1
- 23. Etit retted Citigt litt 0.0 1.5 8.1 24.thutd:vn$thedultiCittEttiiM:stts(tire,tatt,andturaticacfIach):
None
- 25. If $btt ttva At ind Cf itprt Perled. Istiitted tite of Starts):
26.UnitsIttestStatus(PritttoCetstrcialCitratitt): letteilt A:hitted Illf!AlCt!?!CAllTT 1511111 It!CitIClff CCKK!!CIALCPilATICN
4 8 I
0FILAf!IJIATA!!?Cif D0 Ilf 50 !0-(14 UI!? Catarra 2 ,,
IAfg httttf 15, 199 8 00Xfitf!D If f 1.11llins
?!LIFEDEI fft !!2 !146 ,
IONfit ff*nttr,1917 ul AV!RA31 CA!Li 70rit itVIL 31 AVilA;ICAILYP0 fit!!VIL INVtEtt) (MVtNet) 1 liff 17 1171 2 till li 1170 3 1117 11 till
{ 1160 20 11El 5 11tl !! ,
1111 6 1171 22 1170 7 1171 23 1170 1 1171 24 1161 1 1170 15 1187 10 1171 24 1169
!! 1170- 27 1111 12 1176 !! 1168 13 1170 29 till
}{ 1171 30 1161 15 1170 31 1169
(- 1171 i
f
-+ l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOC m ht. 50-414 UNXT HAME uienen T DATE v1/13/yo REPORT MONTH December 1997 COMPLEThu BY x. a. williams TF1EPHONE (ius;-3e4-3343 (1) (2) (3) (4) (5)
R MET-E HOD T A OF LICENSE -
N -Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION 'IO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S 1
(2) (3) (4)
(1)F Forced Reason . Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1 54anual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) 5
, -. ~ . ---e. , , - ,
i DOCKET: 50-414 UNIT: Catawba 2 Date: Ol/15N8 NARRATIVE
SUMMARY
MONTil: Decemter,1997 Catawba Unit 2 began the month of December operating at 100% full power The unit operated at or near -
100% full power for the entire month, i
t i
Prepared by; R. A, Williams Telephone: (704). 382 3346 l
. y u..
i
* ?
hiQNI11LY REIUFI_ING INIORMATION REQUEST
- 1. Facility narne: Catawba Unit 2
- 2. Scheduled next refueling shutdown:Stp.ttsteet 1998
- 3. Schniuled ret. tart fellowing refueling: October 1996 Tlin PROJECT M ANAGER IIAS 11EEN ADVISED !!Y SEPARATTI COMMUNICATION OF ,
- ANY T.S. CilANGE OR LICENSE AMENDMENT, TiiEREFORE, OUESTIONS 4 TilROUGil 6 WILL NO LONGER IIH MAINTAINED IN Tills REIDRT.
4, Will refueling or ter,umption of operation therenher requite a technical specification change or l other licerne amendment?
If yes, whnt will these te?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information, t
6, important licensing considerations (new or different design or supp'ict, unre viewed design or perfonnance analysis methods, significant changes ir design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 123 (b) in the spent fuel pool: MK}
it. Present licensed fuel pool capacity: J118 Sii.e of requested or planned increase: =
7
- 9. Projected date of last refueling which can be accommodated by present license capacity:
hiny2012 DUKE POWER COMPANY DATE: Januarv 15.1998 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 -
a b
1
CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT November 1997 ,
- 1. Personnel Exposure -
i The total station liquid release for November has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for November has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
Y S
w - ,-r . , _ _ _ _ _ - . --w-_s-m.m.._- --_.___-___m_____m.}}