Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _
CPIRATING IATA RIT0ff DOCIIT 50 50 413 Dif! Juli 15. 1998 0 PIRATING STATUS COMPLITIDBT t.A. Villius TIllFHONI 704 382 5346
- 1. Unit Inse: Catauba 1 e
- 2. Repctting Period: Jue 1,1998 June 30,1998
- 3. Licensed 7ternalPower(NVt): 3(11
- 4. Nueplate lating (Gross MVe): 1305' Rates 'Nigeplate Rating
- 5. Design Ilectrical lating (Xet NVe): 1145 (Grcss E e) calculated as
- 6. Marisu Dependable capacity (Gress MWe): 1192 1450.000 MVA .90 power
- 7. Muins Dependable Capacity (Net MVe): 1129 facterperPage111, 8.-If Changes Occur in Capacity tatings (Itess Xcaber 3 Through 7) Since last EURIG0020.
.. Report. Give Reascas:
- 9. Power level to Which testricted, If Any (Net MVe):
10.Reascnforlestrictions,Ifany:
l ThisMcnth fr. to Date Cuulative
- 11. Hours In Reporting Period 720.0 4343.0 114000.0
.12.EusberOfHoursReacterWascritical 653.6 4160.1 90360.6
- 13. Reacter Reserve Shutdown Hours - - - !
-II.HoursGeneratorOnLine 653.0 (107.6 88971.6 l 15.UnitReserveShutdcun' Hours --0-- - 1 l.
16.GrossThersalInergyGenerated(MVH) 2212702 13538670 291372237
- 17. Grcss Electrical Energy Generated (MVH) 781279 1845373 103151757 l
18.~ Net Ilectrical Inergy Generated (NVH) 739982 4581361 97120074
! 19.UnitServicefacter 90.7 91.6 78.1
- 20.UnitAvailabilityfacter 90.7 94.6 78.1 l 21. Unit Capacity factor (Using MDC Net) 91.0 93.4 75.3 l 22. Unit Capacity Facter (Using DIR Ret) 89.8 92.1 74.4 ;
23.UnitforcedcutageRate 9.3 2.8 7.0
- 24. Shutdenn Scheduled Over Bert 6 Nonths (Type, Date, and Duration cf Iach):
-Mnno l.
- 25. If Stut Down At Ind Of lepert Period. Istinated Date of Startup: Julv 01, 1998
-26. Units In fest Status (Frict to Cenercial Operation): forecast Achieved 4
IIIf!AL CRITICALIf!
INITIALIIICTRICITY COMMERCIAL CPIRATION L
9807210058 980714 PDR ADOCK 05000413 l j R PM L1--___________-.________________-.-________ .
e CFI1ATING DATA RIP 0tT DOCIIT N0 50 413 UXIT Catawba 1 CATIj ) 15.1998 COMPLITID BY R.A. Villians TILIPHONE 704-392-5346 N0XTH June,1998 I&l AVIRAGI DAILY PCEIR LIVIL IJJ AVIRAGI CAILY POVER LIVIL (XVeNet) (MWeNet) {
i i
1 1148 17 1150 l
2 1149 18 1150 !
3 1145 19 1147 l 1
4 1149 20 1149 1150 1149 I
5 21 6 1152 22 1145 7 1162 23 1147 8 1161 24 1144
.9 1157 25 1144 10 1150 26 1139 11 1147 27 1116 12 1139 28 34 13 '1112 29 0 li 1124 30 0 j 15 1145 1 16 1146 k._.___..._m_ _A _
lllI l
d s e nas e
^
se ms aa id l-W O
L F
otn iae tDc c ,i ufL) S c
r u
o 1 lz ro R) ui u G t rE1 e Aswa N snoL6 m
.. 3u/ - E I noF(1 a 1 n d .) V E R Ii 0 S 4a1Ae I C E tst-r/ u T N P atrG -
0 A. i 5t. u x.t s C E M reoE E R E GaepR I ROR T pneU RTU teSRN( t
.E E Y E' O C R ir i
. OMTBN CNE E bPytne b NAA O OR TK i i NDDH DI AA h r t el h r EP NTT WE xonvi x rT u TE ACN DL )EfEEF )E lI EL AE E 4 5 CN LE E V EW ( (
OU PT S E FO D M U R B O A P YL C C RE m)
A IG an ri LN II mca aSl XP r p UI ccx AP SiE S t(
N lla O T :aamr I N X duuoe T ) E X onnth C 8 5 NE X haaut
.U 9 (' OD X tMMAO _
D 9 PO X e- _
E 1 MC X )M1234 R O 3 e C (
R n n E u - E o _
W J ) SMD H ,i _
O 4 YEO C t _
P (
STC a n _
D ,i N E m A S T a NTR x S ENO. E _
N CEPO W H IVEN ) e O T LER n s _
u N i n _
T O a e) .
u M - TN l c n -
h )TD UWX p ni i
. S T 3EOFHO/ 1 x oL a R (MHOSDR E i l _
T O (t t& p _
I P )- s c x .
N E 2 A ee ig E _
U R (REASON rt rn ( -
u ti )
lr snern N 8 io eivoi O 9 a R ai r a IS .
Fe rtrl TR 6 c yT aE p
.AU 6 tngr r x RO nanortrE UH enitoso(
D m el a tit pt el a n a r nil n u u ri r e
) o \if ge m eh 1 TYPE F s qa e e d pt
(
aEMRR@AOO e-8
)RABCDEFGH 2
2 (
E 6 d T e A - l D 8 du 9 ed ce rh oc FS NO. 6
)FS 1
(
_ ll I !l
1 i
I .
MONTHLY REFUELING INFORMATION REOUEST L
- 1. . Facility name: Catawba Unit I l
- 2. Scheduled next refueling shutdown: April 1999
, 3. Scheduled restart following refueling: May 1999 l
THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF l ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
! 'lHROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
l l
- 4. Will refueling or resumption of operation thereafter require a technical specification change or o$erlicense amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions'?
- 5. Scheduled date(s) for submitting proposed licensing action and supportirg information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: .l.91 9 (b) in the spent fuct pool: 294
- 8. Present licensed fuel pool capacity: .[i))
Size of requested or planned increase: -.-
- 9. Projected date oflast refueling which can be accommodated by present license capacity:
November 2009 l
l DUKE POWER COMPANY DATE: July 15.1998 'I Name, of
Contact:
R. A. Williams Phone: (704)- 382-5346 I
I 1
i l
I L. _ _ _ _ _ _ . _ _ _ _ . _ _ _ . __ _ _ _ _ _ _ _ ._ . . . . _ _ _ _ _ . _ . . _ . _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _
_ _ _w
DOCKET: 50-413 UNIT: Catawba 1 Date: 07/15/98 NARRATIVE
SUMMARY
' MONTH: June,1998 1
Catawba Unit I began the month of June operating at 100% full power. On 06/27/98 at 2118 the unit began decreasing power and was taken off line on 06/28/98 at 0501 to repair steam generator "lC" auxiliary feedwater tempering flow piping elbow leak.1he unit was in the outage the remainder of the month.
4
. l
! i l
l l
l l
l l
l .
! l l
t i
- Prepared by: R. A. Williams Telephone: (704)- 382-5346 l
l-l 0 PIRATING DATA RIF0tf t
DOCIIT NO 50 414 DATI.fulv 15, 1998 CPIRATIIG STATUS COMPLITID ST 1.A. Villi ns TILIPH0VI 704 3H2 5346 1 Unit Nase: Catavha 2 2.ReportingPericd: June 1,1998-June 30,1998 l
3.LicensedThermalPower(pt):' 3(11
- 4. Naseplate lating (Grcss H e): 1305' Notes 'Naseplate Rating
[ 5. Design Ilectrical tating (Net He): 1145 (GrossNVe)calculatedas
- 6. Nazins Dependable Capacity (Grcss MVe): 1192 1(50,000 N A I 90 power
- 7. Marists Dependable Capacity (Net He): 1129 factorpertageill, l 8. If Changes Occur in capacity Ratings (Itess Huaber 3 Thr ngh 7) Since last URIG0020.
.leport.GiveReascas:
- 9. Power Level 70 Which testricted, If Any (Net NVe):
- 10. Reasen for Restrictions, If any:
~
l l
l^
ThisMenth fr. to-Date Cuulative l
- 11. Hours In Reperting Period 720.0 (343.0 104016.0 12.EusberOfHoursReactorWasCritical 720.0 (343.0 84390.0 13.ReacterleserveShutdernHours - - 14.HoursGeneratorOnLite 720.0 (343.0 83215.1
- 15. Unit Reserve Shutdon Hours --0-- -D-16.GrcssThertalEnergyGenerated(NH). 2439550 14778118 2707873(B l 17.GrcssIlectricalEnergyGenerated(HVH) 864802 5304861 96215314 l 18.HetIlectricalInergyGenerated(MVH) 821061 504(062 90773384 19.. Unit'Servicefactor 100.0 100.0 80.0 20.UnitAvailabilityFactor 100.0 100.0 80.0
. 21. Unit capacity Factor (Using KDC Net) 101.0 102.9 77.2
- 22. Unit Capacity Factor (Using DIR Net) 99.6 101.4 76.2 q
- 23. Unit 7creedOutagelate .
0.0 0.0 7.7 l 24.ShutdownScheduledOverNext6 Months (Type, tate,andturationofIach):
Refuelina - Senta=her 05, 199n - an aava
- i. 25. If Shut Down At End of lepert feriod. Estimated Inte of Startup:
. 26. Units In Test States (Prior to Cenercial Operation): Torecast Achieved INITIAL CRITICALIff INITIAL IIICitICIff 0 COMMItCIAL OPIRATION-l l
t b__ __ . . _ _ _ . _ _ _ __ _ - . _ - . __ _ _ _ _ __ _ _ _ _ _ __ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
e
- l OPERATING DATA !!P017 I
DOCIIT NO $0-414 l UVIT Cataura 2 l DATI July 15. 1998 l
COMPLIf!D BT R.A.Illlians l TILIPHONI 704 392 5346 l
NOITH June,1999 El AVIRAGI CAILY POWER LIVIL p)J AVIRAGI IAILY POVIR Lli!L (XVe-let) (NVe-Net) 1 1146 17 1151 2 1147 18 1151 3 1142 19 1146
( 1150 20 1151 5 1150 21 1149 6 1153 22 1139 7 1075 23 1147 3 l
6 1151 24 1139 ;
I 9 1086 25 1144 i 10 1126 26 1141 11 1146 27 1141
- 12 1141 28 1139 13 1144 29 1140 14 1152 30 1139 15 1141
. 16 1144 l
l l
l-I L__________-____. _ _
4n1as I C tst-6f u T N atrG -
01 i . t C E reoE E R 5uux(
ROR RTU G a e pR pneU I
.EEYE O C teSRN t ir ( i OMTBN CNE b NAA O OR bPytne i i NDDH DI h r t el h T EP NTT xonvi x ET TE ACN )EfEEF )E KI EL AE 4 5 CN LE E V ( (
OU PT S E D M U R O A P C C m) an ri mca aSl r p ccx S SiE t(
N lla O T :aamr I N duuoe T ) E onnth C 8 5 NE haaut U 9 (
OD tMMAO D 9 PO e-E 1 MC )M1234 R O 3 e C (
R n n E u - E o W J ) SMD ,i O 4 YEO t P (
STC S a D
n N ,i N E O m A S T I a NTR T x S ENO. C E N CEPO U W H IVEN D ) e O T LER E n s D N R i n T O a e )
U M - TN l c n H )TD UWX p ni i S T 3EOFHO/ x oL a R (MHOSDR E i l T O (t t& p I P ) R s c x N E 2 O ee ig E U R (REASON rt rn (
u ti )
S lr snern N N io eivoi O W a Raira IS O Fe rtrl TR D c yT a E p AU T t n gr r x RO U nanortrE UH H enitoso(
D S m el atit htelanar ni n u u ri r e
) O o u if ge m eh 1 TYPE N sqaee d t
(
aEMRR@A@O e-
)RABCDEFGH 2
(
_ E d
_ T e A l D du ed ce rh oc FS NO .
)FS 1
(
1 MONTHLY REFUELING INFORMATION REOUEST
- 1. Facility name: Catawba Unit 2
- 2. Scheduled next refueling shutdown: Scotember 1998
- 3. Scheduled restart following refueling: October 1998 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Imponant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuelassemblies (a) in the core: 19),
(b) in the spent fuel pool: 6QQ
- 8. Present licensed fuel pool capacity: 14]1 Size of requested or planned increase: =
- 9. Projected date oflast refueling which can be accommodated by present license capacity:
May 2012 i
DUKE POWER COMPANY DATE: July 15.1998 l
Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 l
l Li- - _ _ - - - - - - _ _ _ - - _ - - - - _ a
4 i
1 DOCKET: 50-414 UNIT: Catawba 2 Date: 07/15/98 NARRATIVE
SUMMARY
MONTH: June,1998 Catawba Unit 2 began the month of June operating at 100% full power. The unit operated at or near 100%
full power for the entire month. j i
)
i l
I l
I i
l i
l Prepared by: R. A. Williams l Telephone: (704)- 382-5346 i
I-t-____---_--_-------------_-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ - -- . - - - - - - - - - - - - - - - - _ - - - - - - - - - --- _---_