Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2
ML20236Q807
Person / Time
Site: Catawba  Duke energy icon.png
Issue date: 06/30/1998
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20236Q186 List:
References
NUDOCS 9807210058
Download: ML20236Q807 (10)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _

CPIRATING IATA RIT0ff DOCIIT 50 50 413 Dif! Juli 15. 1998 0 PIRATING STATUS COMPLITIDBT t.A. Villius TIllFHONI 704 382 5346

1. Unit Inse: Catauba 1 e
2. Repctting Period: Jue 1,1998 June 30,1998
3. Licensed 7ternalPower(NVt): 3(11
4. Nueplate lating (Gross MVe): 1305' Rates 'Nigeplate Rating
5. Design Ilectrical lating (Xet NVe): 1145 (Grcss E e) calculated as
6. Marisu Dependable capacity (Gress MWe): 1192 1450.000 MVA .90 power
7. Muins Dependable Capacity (Net MVe): 1129 facterperPage111, 8.-If Changes Occur in Capacity tatings (Itess Xcaber 3 Through 7) Since last EURIG0020.

.. Report. Give Reascas:

9. Power level to Which testricted, If Any (Net MVe):

10.Reascnforlestrictions,Ifany:

l ThisMcnth fr. to Date Cuulative

11. Hours In Reporting Period 720.0 4343.0 114000.0

.12.EusberOfHoursReacterWascritical 653.6 4160.1 90360.6

13. Reacter Reserve Shutdown Hours - - -  !

-II.HoursGeneratorOnLine 653.0 (107.6 88971.6 l 15.UnitReserveShutdcun' Hours --0-- - 1 l.

16.GrossThersalInergyGenerated(MVH) 2212702 13538670 291372237

17. Grcss Electrical Energy Generated (MVH) 781279 1845373 103151757 l

18.~ Net Ilectrical Inergy Generated (NVH) 739982 4581361 97120074

! 19.UnitServicefacter 90.7 91.6 78.1

20.UnitAvailabilityfacter 90.7 94.6 78.1 l 21. Unit Capacity factor (Using MDC Net) 91.0 93.4 75.3 l 22. Unit Capacity Facter (Using DIR Ret) 89.8 92.1 74.4  ;

23.UnitforcedcutageRate 9.3 2.8 7.0

24. Shutdenn Scheduled Over Bert 6 Nonths (Type, Date, and Duration cf Iach):

-Mnno l.

25. If Stut Down At Ind Of lepert Period. Istinated Date of Startup: Julv 01, 1998

-26. Units In fest Status (Frict to Cenercial Operation): forecast Achieved 4

IIIf!AL CRITICALIf!

INITIALIIICTRICITY COMMERCIAL CPIRATION L

9807210058 980714 PDR ADOCK 05000413 l j R PM L1--___________-.________________-.-________ .

e CFI1ATING DATA RIP 0tT DOCIIT N0 50 413 UXIT Catawba 1 CATIj ) 15.1998 COMPLITID BY R.A. Villians TILIPHONE 704-392-5346 N0XTH June,1998 I&l AVIRAGI DAILY PCEIR LIVIL IJJ AVIRAGI CAILY POVER LIVIL (XVeNet) (MWeNet) {

i i

1 1148 17 1150 l

2 1149 18 1150  !

3 1145 19 1147 l 1

4 1149 20 1149 1150 1149 I

5 21 6 1152 22 1145 7 1162 23 1147 8 1161 24 1144

.9 1157 25 1144 10 1150 26 1139 11 1147 27 1116 12 1139 28 34 13 '1112 29 0 li 1124 30 0 j 15 1145 1 16 1146 k._.___..._m_ _A _

lllI l

d s e nas e

^

se ms aa id l-W O

L F

otn iae tDc c ,i ufL) S c

r u

o 1 lz ro R) ui u G t rE1 e Aswa N snoL6 m

.. 3u/ - E I noF(1 a 1 n d .) V E R Ii 0 S 4a1Ae I C E tst-r/ u T N P atrG -

0 A. i 5t. u x.t s C E M reoE E R E GaepR I ROR T pneU RTU teSRN( t

.E E Y E' O C R ir i

. OMTBN CNE E bPytne b NAA O OR TK i i NDDH DI AA h r t el h r EP NTT WE xonvi x rT u TE ACN DL )EfEEF )E lI EL AE E 4 5 CN LE E V EW ( (

OU PT S E FO D M U R B O A P YL C C RE m)

A IG an ri LN II mca aSl XP r p UI ccx AP SiE S t(

N lla O T :aamr I N X duuoe T ) E X onnth C 8 5 NE X haaut

.U 9 (' OD X tMMAO _

D 9 PO X e- _

E 1 MC X )M1234 R O 3 e C (

R n n E u - E o _

W J ) SMD H ,i _

O 4 YEO C t _

P (

STC a n _

D ,i N E m A S T a NTR x S ENO. E _

N CEPO W H IVEN ) e O T LER n s _

u N i n _

T O a e) .

u M - TN l c n -

h )TD UWX p ni i

. S T 3EOFHO/ 1 x oL a R (MHOSDR E i l _

T O (t t& p _

I P )- s c x .

N E 2 A ee ig E _

U R (REASON rt rn ( -

u ti )

lr snern N 8 io eivoi O 9 a R ai r a IS .

Fe rtrl TR 6 c yT aE p

.AU 6 tngr r x RO nanortrE UH enitoso(

D m el a tit pt el a n a r nil n u u ri r e

) o \if ge m eh 1 TYPE F s qa e e d pt

(

aEMRR@AOO e-8

)RABCDEFGH 2

2 (

E 6 d T e A - l D 8 du 9 ed ce rh oc FS NO. 6

)FS 1

(

_ ll I !l

1 i

I .

MONTHLY REFUELING INFORMATION REOUEST L

1. . Facility name: Catawba Unit I l
2. Scheduled next refueling shutdown: April 1999

, 3. Scheduled restart following refueling: May 1999 l

THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF l ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4

! 'lHROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

l l

4. Will refueling or resumption of operation thereafter require a technical specification change or o$erlicense amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions'?

5. Scheduled date(s) for submitting proposed licensing action and supportirg information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: .l.91 9 (b) in the spent fuct pool: 294
8. Present licensed fuel pool capacity: .[i))

Size of requested or planned increase: -.-

9. Projected date oflast refueling which can be accommodated by present license capacity:

November 2009 l

l DUKE POWER COMPANY DATE: July 15.1998 'I Name, of

Contact:

R. A. Williams Phone: (704)- 382-5346 I

I 1

i l

I L. _ _ _ _ _ _ . _ _ _ _ . _ _ _ . __ _ _ _ _ _ _ _ ._ . . . . _ _ _ _ _ . _ . . _ . _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _

_ _ _w

DOCKET: 50-413 UNIT: Catawba 1 Date: 07/15/98 NARRATIVE

SUMMARY

' MONTH: June,1998 1

Catawba Unit I began the month of June operating at 100% full power. On 06/27/98 at 2118 the unit began decreasing power and was taken off line on 06/28/98 at 0501 to repair steam generator "lC" auxiliary feedwater tempering flow piping elbow leak.1he unit was in the outage the remainder of the month.

4

. l

! i l

l l

l l

l l

l .

! l l

t i

Prepared by: R. A. Williams Telephone: (704)- 382-5346 l

l-l 0 PIRATING DATA RIF0tf t

DOCIIT NO 50 414 DATI.fulv 15, 1998 CPIRATIIG STATUS COMPLITID ST 1.A. Villi ns TILIPH0VI 704 3H2 5346 1 Unit Nase: Catavha 2 2.ReportingPericd: June 1,1998-June 30,1998 l

3.LicensedThermalPower(pt):' 3(11

4. Naseplate lating (Grcss H e): 1305' Notes 'Naseplate Rating

[ 5. Design Ilectrical tating (Net He): 1145 (GrossNVe)calculatedas

6. Nazins Dependable Capacity (Grcss MVe): 1192 1(50,000 N A I 90 power
7. Marists Dependable Capacity (Net He): 1129 factorpertageill, l 8. If Changes Occur in capacity Ratings (Itess Huaber 3 Thr ngh 7) Since last URIG0020.

.leport.GiveReascas:

9. Power Level 70 Which testricted, If Any (Net NVe):
10. Reasen for Restrictions, If any:

~

l l

l^

ThisMenth fr. to-Date Cuulative l

11. Hours In Reperting Period 720.0 (343.0 104016.0 12.EusberOfHoursReactorWasCritical 720.0 (343.0 84390.0 13.ReacterleserveShutdernHours - - 14.HoursGeneratorOnLite 720.0 (343.0 83215.1
15. Unit Reserve Shutdon Hours --0-- -D-16.GrcssThertalEnergyGenerated(NH). 2439550 14778118 2707873(B l 17.GrcssIlectricalEnergyGenerated(HVH) 864802 5304861 96215314 l 18.HetIlectricalInergyGenerated(MVH) 821061 504(062 90773384 19.. Unit'Servicefactor 100.0 100.0 80.0 20.UnitAvailabilityFactor 100.0 100.0 80.0

. 21. Unit capacity Factor (Using KDC Net) 101.0 102.9 77.2

22. Unit Capacity Factor (Using DIR Net) 99.6 101.4 76.2 q
23. Unit 7creedOutagelate .

0.0 0.0 7.7 l 24.ShutdownScheduledOverNext6 Months (Type, tate,andturationofIach):

Refuelina - Senta=her 05, 199n - an aava

i. 25. If Shut Down At End of lepert feriod. Estimated Inte of Startup:

. 26. Units In Test States (Prior to Cenercial Operation): Torecast Achieved INITIAL CRITICALIff INITIAL IIICitICIff 0 COMMItCIAL OPIRATION-l l

t b__ __ . . _ _ _ . _ _ _ __ _ - . _ - . __ _ _ _ _ __ _ _ _ _ _ __ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

e

  • l OPERATING DATA !!P017 I

DOCIIT NO $0-414 l UVIT Cataura 2 l DATI July 15. 1998 l

COMPLIf!D BT R.A.Illlians l TILIPHONI 704 392 5346 l

NOITH June,1999 El AVIRAGI CAILY POWER LIVIL p)J AVIRAGI IAILY POVIR Lli!L (XVe-let) (NVe-Net) 1 1146 17 1151 2 1147 18 1151 3 1142 19 1146

( 1150 20 1151 5 1150 21 1149 6 1153 22 1139 7 1075 23 1147 3 l

6 1151 24 1139  ;

I 9 1086 25 1144 i 10 1126 26 1141 11 1146 27 1141

12 1141 28 1139 13 1144 29 1140 14 1152 30 1139 15 1141

. 16 1144 l

l l

l-I L__________-____. _ _

4n1as I C tst-6f u T N atrG -

01 i . t C E reoE E R 5uux(

ROR RTU G a e pR pneU I

.EEYE O C teSRN t ir ( i OMTBN CNE b NAA O OR bPytne i i NDDH DI h r t el h T EP NTT xonvi x ET TE ACN )EfEEF )E KI EL AE 4 5 CN LE E V ( (

OU PT S E D M U R O A P C C m) an ri mca aSl r p ccx S SiE t(

N lla O T :aamr I N duuoe T ) E onnth C 8 5 NE haaut U 9 (

OD tMMAO D 9 PO e-E 1 MC )M1234 R O 3 e C (

R n n E u - E o W J ) SMD ,i O 4 YEO t P (

STC S a D

n N ,i N E O m A S T I a NTR T x S ENO. C E N CEPO U W H IVEN D ) e O T LER E n s D N R i n T O a e )

U M - TN l c n H )TD UWX p ni i S T 3EOFHO/ x oL a R (MHOSDR E i l T O (t t& p I P ) R s c x N E 2 O ee ig E U R (REASON rt rn (

u ti )

S lr snern N N io eivoi O W a Raira IS O Fe rtrl TR D c yT a E p AU T t n gr r x RO U nanortrE UH H enitoso(

D S m el atit htelanar ni n u u ri r e

) O o u if ge m eh 1 TYPE N sqaee d t

(

aEMRR@A@O e-

)RABCDEFGH 2

(

_ E d

_ T e A l D du ed ce rh oc FS NO .

)FS 1

(

1 MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: Catawba Unit 2
2. Scheduled next refueling shutdown: Scotember 1998
3. Scheduled restart following refueling: October 1998 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Imponant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuelassemblies (a) in the core: 19),

(b) in the spent fuel pool: 6QQ

8. Present licensed fuel pool capacity: 14]1 Size of requested or planned increase: =
9. Projected date oflast refueling which can be accommodated by present license capacity:

May 2012 i

DUKE POWER COMPANY DATE: July 15.1998 l

Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 l

l Li- - _ _ - - - - - - _ _ _ - - _ - - - - _ a

4 i

1 DOCKET: 50-414 UNIT: Catawba 2 Date: 07/15/98 NARRATIVE

SUMMARY

MONTH: June,1998 Catawba Unit 2 began the month of June operating at 100% full power. The unit operated at or near 100%

full power for the entire month. j i

)

i l

I l

I i

l i

l Prepared by: R. A. Williams l Telephone: (704)- 382-5346 i