|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
y _
- r. Duke Power Company'
", g[~' l{ A M Ee p Ce yry . -
us/ =" Fnergy Center A M l-p % v- RO. Box 1006 -
4 Charlone, NC 28201;1006 -
November 14, 1997 U.S Nuclear Regulatory Commission Atter. tion: Document Control Desk Washington, D.C. 20555 -
1
Subject:
_. Catawba Nuclear Station
. Docket No. 50-413 and -414
Dear Sir:
Please find attached information concerning the performance and operation status of the Catawba Nuclear' Station for the month of October, 1997 Any. questions or comments may be' directed to Roger A. Williams at (704) 382-5346.
Si erely, 4
/
44 M
\ erry immery M nager ,
Nucl ar--Busin Support Attachment L. A. Reyes, Regional Adminic,trator USNRC, Region II
-Peter Tam, Project Manager USNPC, ONRR INPO Records Center Ms. Margaret Aucoin W Nuclear Assurance Corporation Dottie.Sherman, ANI Library '
American Nuclear Insurers MY)
Daryl Roberts,; Senior Resident Inspector
~ "
9711200108 971031 PDR R
ADOCK 05000413:
_PDR g
. , , l]ll l
, Oc a.
P Document Control Desk U.S. NRC Catawba bxc:
-J. M.-Davis (ON01VP)
K. S. Canady (EC08H)
- T. E. Mooney-(CC090)
Hcrsley (EC12T)
B. J.
T~. E. Hunter.(ON0102)-
- C. 11. Green - (MG010P)-
B. W. Walsh (EC11C)
Jeanette Meares . (CN020P)
G. A. Copp (EC050)
D.-R. Groux (ON01VP)
B. T._Faulkenberry (EC07C)
M. J. Johnson (PB02L)
D. A. Harton (EC05P)
G. R. Peterson (CN01SM)
J..S. Forbes (CN01EG, E..G. LaCasse (CN01BM)
M. S. Kitlan (CNOIRC)
S. F..Hatley (CNO3MC)
J. J. Fisicaro (EC070)
e OPillf1NG IATA !!P017-DOCK!f 10 50-(11 DAf! Nctether 1L 1997 DPftATIH f?A7 4 COMPtITED BY R.L Villitu TILIFEII , 704 332 5346
- 1. Fait Xase: Cativta 1
- 2. Reperting Perled: Octcher 1,1997 Octcher 31, !!!7 3.LicensedTher:11 Power (KVt): 3111
- 4. Xaseplate lating (Gress Eve): 9 05' Ictes 'Nattplate lating
- 5. Design !!actrical lat.Dg (Itt NWe): 1145 (GressMVe)calculatedla 6.MajaustependableCapacity(GrossEVe): 1192 1(50,000NYAI.90 power
- 7. Marian Dependable capacity (Iet MVel: 1129 facterperPage111, 8.-If Change Occur in Capacity Ittings (Ites: Rather 3 through 7) Since Last KUtIG-0020.
tercrt Give leasent:
- 9. Pcuer level Tc Which testricted. If Any (tet XVel:
- 10. teasen for testrictions, If anr:
ThisIcnth Tr. to Date Cuulative
- 11. Hears In Reporting Perici 745.0 7296.0 108193.0
- 12. Huber of Hours teacter vu critical 7(5.0 7216.0 85529.8
- 13. Reacter Reserve Snudorn Ectis ~0~ ~0 - *
- 14. Ents Generater On line 7(5.0 7216.0 8(193.8
- 15. Unit teserve shutdcun Ecurs - O~ - 0~
18.GrcssthernalinergyGenerated(MVH1 2511171 24881174 275584615-17.GrcssIlectricalEnergyGenerated.MVH) 906319 8880126 97499532 18.NetIlectricalEnergyGenerated(NVH) 860565 8(29628 9178(994 19.Usit'fervicefacter 100.0 100.0 17.8 20.UnitAvailabilityfacter 100.0 100.0 17.8
- 21. Unit capacity facter (Using XDC Net) 102.3 102.3 74.9 12.Unitcapacitifacter(UsingDitRet) 100.9 100.9 14.1 23.UnitforcedOutagetite 0.0 0.0 7.3
- 24. Shutden Scheduled Over Xaxt 6 Ranths (Type, Date, and turatica cf tach):
Refue31ng - November 29, 1997 _ _ _ _ ,
- 25. If shut Denn At Ind of teport Pericd Estinated Cate cf Starturt
- 26. Units In test Status (Prict to Cenercial Operatien): Terecast Achieved IXITIAL CRITICALITY
.IIITIALIIICTt! CITY CCXMIRCIAL CPIDTION
0F!!Af!I3t)TA!!P0t?
DOCK!f N0 50 413 L'XIT totivtt1 CAttRefeater 14,1997 CCH?llf!D If I.A.Villiul
?!LIFBONI 701 382 5316 NOITH Oetcher 1997 QT avita 38 DAILY 70VII LIVIL E, )VitAGI DAILY 70VII LIVIL (MVeItt) (NItXtt) 1 1155 17 1161 2 1160 18 l',- 9 3 1161 !! 1155 4 1150 20 1162 5 1156 21 1160 6 1155 22 1153 7 1152 23 1161 1 1150 2( 1160 1 _
1150 25 115!
10 114! 26 1104
-11 1151 27 1157 12 1153 28 1164 13 1153- !! 1164 14 1150 30 1162 15 - 1159 31 1160 16 1161
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME LArewea 1 DATE 11/14/y/
REPORT MONTH October 1997 COMPLETED BY x. a _. williams TELEPHONE tive1.Juz yJsd (1) (2) (3) (4) (5)
R MET- -
E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE ED CORRECTIVE P DURATION O DOWN REPORT TEM COMPONENT ACTION TO O PREVENT RECLTRENCE
. DATE E HOURS N R/X NO. CODE CODE NO SHUTDOWNS OR REDUCTION S 1
(1) (2) (3) (4)
F Forced Reason- Method: Exhibit G - Instructions 1-Manual for Preparation of Data S Scheduled A-Equipment Failure (Explain) 2-Manua Scram Ent.7 Sheets For Licensee B-Maintenance or test Event Reoort (LER)
C-Refueling 3-Automatic Scram D-Regulatory Restriction , ,
4-Other (Explain) File (NUhEG-0161)
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source.
H-Other (Explain) (Explain)
, .. g
t DOCKET: 50-413 UNIT: Catawba 1 Date: 11/14/97 NARRATIVE
SUMMARY
MONTil: October,1997 Catawba Unit I began the month of October operating at 100% full power. The unit operated at or near 100% full power for the entire month.
Prepared by: R. A. Williams Telephone: (70A)- 382-5346
MONTIILY REFUELING INFORMATION REOUEST
- l. Facility name: Catawba. Unit i
- 2. Scheduled next refueling shutdown: November 1997
- 3. Scheduled restart following refueling: January 1998 Tile PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TIIEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE MAINTAINED IN TI-ils REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 19_1 (b) in the spent fuel pool: 6))
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: =
- 9. Projected date oflast refueling which can be accommodated by present license capacity:
November 2009 DUKE POWER COMPANY DATE: November 14.1997 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 l
l l
J
. . . - - . - , . . - ~ . . . . . -. ~.- .... --- .- - . . .
.=
l
-d--
'b.i .T OFItA?IIS bATA IIF0tf
!I DOCKIf 50 50 114 -I
- DATII:vantar 1 0 1917 CPIRAf!I3 ftATU5 CotflITID If t.1. E1111ans
- ?!LIPH0I! 701 112-5346 -
- 1. Unit Base: Catasta 2 3 2.leportittPeriod:Octcher1,Ill7Octcher 31,1997 '
L3.LicensedTherealFover.(Wt):. 3(11.
- 4. Itseplate lating (Grcss H e): .1305' Ictes 'lastplate lating_
- 5. Desip Ilectrical lating (Ret MVe): . -1145 (Gress He) calculated as
- 6. Marins Septadahle capacity _(Gross He):- 1112 1450.000 NY1 .90 povar
'7._ Kuins cependable Capacity (Net hVe):- ~ '1129 - .factcrperPage111,_ x
- 0 If Changes occur-in capacity latings_(Itess Nasher 3 Thrcu d U sinca 1.ast. HtI 0020.
leport.GiveReasons: .
- 9. Pcuer level 70 Which testricted, If Any (Eet XVe):
~10.ReasonTcrtestrictions,Ifany' t
. ThisMenth Tr. to Date Cusulative l 4
-!!.hetisInRepor!!ngPeriod 745.0 7295.0 98209.0 12.InsherOfEcurs261ctorVasCritical 715.0 6213.9 78583.0
- 13. Reacter Reserve Shitisvn Hours - 0- '0-
- 14. Hours Generascr On Line 7(5.0 6161.9 7*408.1
. 15.UnitReserveShutdevnHcurs 0-- " 1 J16. Grcss Thersal Intrg Generated (N9) 2490176 20311727 251076803 j
!?. 3resi llectrical Inergy Generated (RFI- 898001 7280182 19128815- !
14.NetIlectricalInergyGenerated-(NH)- 851050 6881859 14035751 19.Unitservicefactor. 100.0 Bl.5 78.8
. -28lUtitAtallabilityfactor 100.0 84.5 78.8
- 21.LUnit Capacity Tacter (Uning EC Net) 101.4 -83.6 75.7 22.UnitCarteltyfacter(UsingDItIst) -100.0 82.5 71.7 23.Unitforced0tragelate- _
- 0.0 l'8 - 8.2 24.18hatdevn Scheduled CTer Xert 6 Rcaths (typa, Date, and Duration cf Iach):
"None _
' -35. If shut tevn At End of tepert Period._Istimated tate cf Starturt .
- 26.~ Units 2nTestStdus(FriortoCcenercialOperationi
- icrecast Achie7ed' IIIf11LCRIf!CALITT-INITIAL ILICit!C"~ -
CCHIRCIAL OFItATION 4
{w , p- .,v- - +ms s
a 4
OfttATIN3;ATA!!?Ctf DOCK!? N0 50 114 U117 Citivha 2. _
Dit! Xemhr 14,1917 COMPLITIDBY t.L Villint
?!LIFHOII 704 312 5346 LJR 0!tcher,1997 ,
El AVIAAGI C1111 P0f!! LIVIL El AVIRA3! DAILY POVII LWIL (MVeItt)- (MVeItt) 1- 1167 17 ,_
1167 2 1169 18 1167 3 till 19 1166 4 1164 20 193 5 1162 21 950 6 1160 22 1156 1 1160 23 1110 t 1160 24 1166 9 1157 25 1159 10 1155 26 1160
!! 1160 27 1163 12 1161 28 1172 13 1160 29 1170 16- 1155 30 1171 15 1165 31 1171 16 1167 n
h.
~
UNIT SHUTBOWNS AND POWER REDUCTIONS- DOCKET NO. 501414' UNIT NAME ta1;antsa e .
DATE 11/14/yi-REPORT MONTH October 1997 COMPLETED BY' x. A. williams TELEPHONE t / us ) -Juz-dde b (1) (2) (3) (4) (5)
R MET-E HOD- - t T A OF LICENSE N' .Y. -
S- SHUT EVENT SYS- CAUSE AND C.ORRECTIVE' O- P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE' E HOLRS N R/X NO. CODE CODE PREVENT RECURRENCE 15-P 97-10-20 'F:
A --
HH VALVEX REPAIR MAIN FEEDWATER VALVE""2CF33*-
NITROGEN ACCUMULATOR-SOLENOID FIT'1ING LEAK 16-P '97-10-21 F --
A --
'RB CONROD EVALUATE CONTROL ROD BANK LO LO LIMIT ALARM 1
'i b
(1) (2) (3)- (4)
F Forced Reason- Method: Exhibit G Instructions ^
S Scheduled A-Eqi,li6 ment' Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent W Sneets-For License,e-
! C-Refueling 3 -Automatic Scram Event'Re rt (LER) '
D-Regulatory Restriction 4-Other (Explain) File-( EG-0161) i E-OperaQor Training & License Examination "
F-ABministrative (5) "
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) j 1
~
I -.
= , . _ ,
DOCKET: 50-414 UNIT: Catawba 2 Date: 11/14/97
(
NARRATIVE
SUMMARY
MONTil: October,1997 Catawba Unit 2 began the month of October operating at 100% full power, The unit began decreasing power on 10/20/97 at 1300 and held at 16% power from 1852 to 2347 to repair main feedwater valve '
"2CF33" nitrogen accumulator solenoid fitting leak. During power escalation, the unit held at 63% power from 10/21/97 at 0400 to 10/21/97 at 0450 to evaluate cor. trol rod bank to lo limit alarm. De unit retumed to 10i full power on 10/26/97 at 0435, and operated at or near 100% full power the remainder of the month.
I
)
Prepared by: R. A. Williams Telephone: (704).382 5346
i l
MONTHLY REFUELING INFORMATION REOUEST
- l. Facility name: Catawba. Unit 2
- 2. - Scheduled next refueling shutdown: Fentembe 1 >98
- 3. Scheduled restart following refueling: &tober 1998 T11E PROJECT MANAGER liAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specincation change or other license amendment?
If yes, what will these be?
If no, has reload design and core conHguration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting in formation.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or pMormance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: J.9,).
(b) in the spent fuel pool: 600
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
- 9. Projected date oflast refuciing which can be accommodated by present license capacity:
May 2012 DUKE POWER COMPANY DATE: November 14.1997 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346
CATAWBA NUCLEAR STATION ,
MONTHLY OPERATING STATUS REPORT September 1997
- 1. Personnel Exposure -
The total station liquid release for September has been compared with the Technical Specifications maximum annual dose commitment and was-less than 10 percent of this limit.
The total station gaseous release for September has been compared with the Technical Specifications maximum annual dose commitment and was lese than 10 percent of this limit.
l l
1
- - -.