IR 05000250/1989003

From kanterella
Revision as of 08:46, 12 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Insp Repts 50-250/89-03 & 50-251/89-03 on 890206-10. Violations Noted.Major Areas Inspected:Access Control to Protected Vital Areas,Records & Repts,Compensatory Measures & Protection of Safeguards Info
ML20246N321
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/08/1989
From: Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20246N314 List:
References
50-250-89-03, 50-250-89-3, 50-251-89-03, 50-251-89-3, NUDOCS 8903270347
Download: ML20246N321 (1)


Text

,w____~~~~-- --- . .i

"

.'

? 'e Mc ' . . -e , UNITFD STATE iq- - ' <'  !

h-J g - -

'

.f

' '

'. - .

NUCLEAR REGULATORY COMMISSIOb[ ~d - j REGIOM11 ' il

'

-$g 54 , $ 101 MARIETTA STREET, N.W/

"

I

^* ATLANVA, GEORGl A 30323 i9 N 'c *

Q .

,

e ..... ,

Report Nos.: 50-250/89-03 and 50-251/89-03 ,

f-Licensee: Florida Power and Light Company

'9250 West Flagler Street Miami, FL 33102 Docket Nos.: 50-250 and 50-251 License Nos.: DPR-31 and DPR-41 Facility Name: Turkey Point 3 and 4 Inspection Cond ted F ebruary -10, 198 Inspector: M /M ~

ff,di3/ .Y A..T 11 n pftaT S'ecurftp Inspector ..Date/ Signed Approved by: g ; M D. R. McGuire, Chief D&te' Signed Physical. Security Section Nuclear Materials Safety and Safeguards Branch Division of Reactor Safety and Safeguards

. SUMMARY Scope: This routine, unannounced inspection was . limited to reactive inspection of -. licensee reported safeguards events and allegations of improprieties in security operational activities. Specific areas of inspection performed in response to the reported events and allega-tions included: Access Control to Protected and Vital Areas; Records and Reports; Compensatory Measures, and Protection of Safeguards Informatio Results: This reactive inspection of the Turkey Point Security Program identif?ed significant weaknesses in communication and supervision at the shift level as demonstrated by delays in reporting security events to shift and site level security management; shift supervisors failing to ensure personnel compliance with duty assignments; and

~

indecisive actions by shift supervisory personnel in response to questionable personnel actions and performanc * Within the areas inspected, the following violations were identifie (1) Failure to provide compensatory measures for a. degraded Vital'

Ares barrie (2) Failure to provide adequate protection for Safeguards Informatio .

8903270347 890315 PDR ADOCK 05000250 O PDC Dxument transmitted herewith ;

'. centains sensitive uncianified " ' " " * " , ' * * " " " ' ' ' " ' " " "endusures this

- - _ - _ _ _ _ = _ _ - - _ _