ML20237B707

From kanterella
Revision as of 16:05, 25 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Resolution 39-87 Requesting That NRC Deny Authorization to Restart Plant Until Appropriate & Adequate Safety Margins Can Be Assured
ML20237B707
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/04/1987
From: Toporovich T
BALTIMORE COUNTY, MD
To: Zech L
NRC COMMISSION (OCM)
Shared Package
ML20236X442 List:
References
NUDOCS 8712170084
Download: ML20237B707 (2)


Text

- _ _ _ - _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _

~

d

, bO'ttlity 601111ril of hnlii1110re 601111tQ

  • (fourt [ louse, Coloson, $nrylanh 21204 (301) 494-3196 COUNCIL Ronald B. Ihdernell res r o,s ra.c r November 4, 1987 Mehin G Minn
f. ECONO Dif,f RICT Mr. Lando Zech, Jr. , Chairman

" ",f,ln("[,f[F' Nuclear Regulatory Comnission 1717 H Street, NW nachara r. asaur Washington, DC 20555 7 OURi H Di'i f 64CT

Dear Mr. Zech:

Nmnan W'. Laaenurin

"',"Jfi"f c ' Attached please find Resolution No. 39-87 requesting the Nuclear Regulatory Comnission to W's/liam R. Es ans deny authorization to restart the Peach Bottan siun o.sucr Nuclear Power Plant unless appropriate and Dale T.1*cd:

w aninnis'*

This Resolution was unanimously approved by the six Councilmembers present at the Noveaber 2, 1987 Baltimore County Council meeting. The 7A,,na, ne,r,x ia Resolution is being forwarded for appropriate socnet n, action.

Sincerely, Thomas Toporovich Secretary l

TT:dp Enclosure l

l l

8712170004 DR 971207 '

ADOCK 05000277 PDR

_ _ _ _ _ _ _ _ _ _ . . - _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ - . _ _ _ _ __ _ _ _ _ _ _ _ . . a

, COUN1Y COUNCIL OF BALTDORE COUITIY, MARYIAND 1EGISLATIVE SESSION 1987, IIG1SIATIVE DAY NO 20 0 l

FISOLUT10N 10. 39-87 Ms. Barbara F. Bachur, Councilwoman By the County Council, Novm ber 2, 1987 A RESOLUTION of the Baltimre County Council requesting the Nuclear Regulatory Cocmission to deny authorization to restart the Peach Botte Nuclear Power Plant unless appropriate and adequate safety m rgins can be assured.

WilEPIAS, in March of 1987, the Nuclear Regulatory Cmmission ordered the Peach Botte Nuclear Power Plant to shut down because of a history of serious safety violations and MIEPIAS, these violations raised serious concerns about the safety of the surrounding areas and therefore generated the decision by the Comission to close the plants and WHEREAS,BaltimoreCountyinitsentiretylieswithina50 mild radius of this plant, so that if a radioactive release were to occur, Balticore County citizens would be susceptible to the ingestion of fallout through contaminated crops and products: and MEREAS, any decision to restart the Peach Bottm Nuclear Power Plant t:ust be mde only after a thorough and careful review of the situation, with particular emphasis upon the disastrous consequences of any nuclear accidents and MERIAS, the Nuclear Regulatory Ccx: mission is the only agency  ;

1 with the authority and expertise to consider the many issues that have surfaced during the m nths of its investigations into conditions et the l power plants and MIEREAS, the Baltimre County Council believes that the Nuclear Regulatory Camission should be prepared to close the plant penmnently if a proper level of safety cannot be guaranteed.

NOW, 11EPIFDPI, BE IT RESOLVED by the County Council of Baltinore County, Maryland, that the Nuclear Regulatory Car.dssion be and it is hereby requested to deny the authorization to restart the Peach Botte Nuclear Power Plant unless appropriate and adequate safety margins can be assured.

. _ _ - _ - - - _ _ _ _ . ]