ML20244C892

From kanterella
Revision as of 21:53, 22 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1989 for Ei Hatch Units 1 & 2
ML20244C892
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/31/1989
From: Beard R, Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HL-426, NUDOCS 8904210033
Download: ML20244C892 (12)


Text

{{#Wiki_filter:_ . _ _ yy >+ q ENCLOSURE 1 .) 1 TABLE OF CONTENTS i PLANT HATCH - UNIT 1 l

                                                                     . NRC DOCKET 50-321                                           I MONTHLY OPERATING-REPORT                                          !

MARCH 1989  ;)

                                                                                                                                 -{

i NARRATIVE REPORT Page El-1: OPERATING DATA REPORT- Page El AVERAGE DAILY P0HER LEVEL- Page El-3 UNIT SHUTD0HNS AND POWER REDUCTIONS Page El-4

                                                                                                                                'l L-i p2asa ungh1 a                    -      -     -            -

I L t. '* L

  • l i NARRATIVE REPORT DOCKET NO. 50-321 UNIT 1 DATE: APRIL 6,.1989 COMPLETED BY: R. M. BEARD TELEPHONE: (912) 367-7781 x2878 March 1 0000 Maintaining rated thermal power.

March 2 1435 Reducing load to 685 GMWe to perform Turbine Control Valve Testing. March 2 1700 Returning to rated thermal power. l March 3 2305 Reducing load to 735 GMWe to perform Weekly Turbine Valve ' l and Auxiliaries Testing, Turbine Stop Valve Testing and -l Control Rod Exercise. March 4- 0030 Returning to rated thermal power. March.7 0915- Reducing power to less than 2432 MWt for maintenance on the Process Computer. March 7_ 1430 . Returning to rated thermal power. March 8' 1255 Reducing power to less than 2432 MWt for maintenance on the Process Computer. March 9 0130 Returning to rated thermal power. March 11 2108 Reducing load to 720 GMWe to perform Weekly Turbine Valve and Auxiliaries Testing, Turbine Stop Valve Testing and Control Rod Exercise. March 11 2136 Returning to rated thermal power. March 17 2155 Reducing load to-510 GMWe to perform Control Rod Sequence Exchange, Weekly Turbine Valve and Auxiliaries Testing, Turbine Bypass Valve Testing, Turbine Stop Valve Testing and. Control Rod Exercise. March 18 1112 Returning to rated thermal power.

             -March-24       2020   Reducing load to 740 GMWe to perform Weekly Turbine Valve and Auxiliaries Testing, Turbine Stop Valve Testing and Control Rod Exercise.

March 24 2045 Returning to rated thermal power. March 31 2400 Maintaining rated thermal power. E1-1

                                                                                                                                              .)

t . . n' :a I d d l OPERATING DATA REPORT DOCKET NO. 50-321 DATE: APRIL 6,.1989 COMPLETED.BY: R. M.-BEARD TELEPHONE: (912) 367-7781 x2878 I OPERATING STATUS'

                                 .n                     ,
1. UNIT MANE: E. I. HATCH UNIT 1
2. REPORT PERIOD: . MARCH,.1989
             .3. LICENSED THERMAL POWER (MWt):                                                       2436                                       "
4. NAMEPLATE RATING (GROSS MWe): 850 5.' DESIGN ELECTRICAL RATING.(NET.MWe): 776.3.
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 789.6-
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 756.6
             '8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES.               .
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWa): NO RESTRICTIONS.
10. REASONS FOR RESTRICTION,-IF ANY: N/A i

THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS Ill REPORTING PERIOD: 744 2160 116135
12. NUMBER:OF HOURS REACTOR WAS CRITICAL: 744.0 2160.0 83007.9 13.'REACTOil RESERVE SHUTDOWN HOURS: 0.0 0.0 .0.0
         '14. HOURS GENERATOR ON-LINE:                                                        744.0.            2160.0              78736.1
         '15. UNIT RESERVE SHUTDOWN HOURS:                                                      0.0               . 0.0'                0.0
16. GROSS THERMAL ENERGY GENERATED (MWH): 1799496 5216856 171697542
17. GROSS ELEC. ENERGY GENERATED (MWH): 582870 -1696910 55410840-
         -18. NET ELEC. ENERGY GENERATED (MWH):                                              558267            1625660             52652293
19. UNIT. SERVICE FACTOR: 100.0% 100.0% 67.8%
20. UNIT AVAILABILITY FACTOR: 100.0% 100.0% 67.8%
          '21. UNIT CAPACITY FACTOR (USING MDC NET):                                           99.2%                 99.5%              60.4%
          '22. UNIT CAPACITY FACTOR.(USING DER NET):                                           96.7%                 96.9%              58.4%
23. UNIT FORCED OUTAGE RATE: 0.0% 0.0% 14.9%
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS-(TYPE, DATE, AND DURATION OF EACH):

Maintenance Outage: Tentatively scheduled for April 21, 1909; 5. Days-

25. IF SHUTDOWN AT'END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A-
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)* N/A El-2

4

   , I.

UNIT 1 DOCKET NO. 50-321 AVERAGE DAILY DATE: APRIL 6, 1989 POWER LEVEL COMPLETED BY: R. M. BEARD MARCH, 1989 TELEPHONE: (912) 367-7781 x2878 DAY Net MWs i 1 ......... 761 2 ......... 750 3 ......... 758 4 ......... 756 5 ......... 754 6 ......... 756 7 ......... 762

1. 8 ......... 763 9 ......... 762 10 ......... 763 11 ......... 759 12 ......... 757 13 ......... 755 14 ......... 753 15 ......... 753 16 ......... 754 17 ......... 739 18'......... 630 19 ......... 755 20 ......... 753 21 ......... 753 22 ......... 760 23 ......... .759 24 ......... 754 25 ......... 754 26 ......... 750 27 ......... 748 28 ......... 748 29 ......... 748 30 ......... 747 31 ......... 748 E1-3

L- ' l . . L

                      ' UNIT SHUTDOWNS AND POWER REDUCTIONS             DOCKET NO. 50-321 DATE: APRIL 6, 1989 UNIT NAME:    E. I, HATCH 1              COMPLETED BY: R. M. BEARD TELEFHONE:    (912) 367-7781 x2878 REPORT MONTH: MARCH, 1989
                                ^*

R M S E E Y T A T LICENSEE SC Y S H EVENT TO COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER ME (SUBCODE) PREVENT RECURRENCE i No significant power reductions this month. 8 1 I  ! F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20% B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS. E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN) l G-OPERATIONAL ERROR (EXPLAIN) H-0THER (EXPLEIN) E1-4 j

I 1 ENCLOSURE 2 i TABLE OF CONTENTS PLANT HATCH - UNIT 2 ' NRC DOCKET 50-366 MONTHLY OPERATING REPORT MARCH 1989 NARRATIVE REPORT Page E2-1 OPERATING DATA REPORT Page E2-2 AVERAGE CAILY POWER LEVEL Page E2-3 UNIT SHUTD0HNS AND POWER REDUCTIONS Page E2-4 1 l l 1

>v ,

   .                                                                                                           i NARRATIVE REPORT          DOCKET NO. 50-366 UNIT 2               DATE: APRIL 6, 1989 COMPLETED BY: R. M. BEARD TELEPHONE:  (912) 367-7781 x2878 akrch 1              0000 Maintaining rated thermal power.                                j March 4              2137 Reducing load to 720 GMWe to perform Control Rod Pattern Adjustrent, Weekly Turbine Valve and Auxiliaries Testing,       .

Turbine Stop Valve Testing and Control Rod Exercise, i

                   . March 5            0330 Returning to rated thermal power.

March 10 2040 Reducing load to 260 GMWe to perform necessary maintenance on the Reactor Recirculation Pump's Motor / Generator Sets, a Weekly Turbine Valve and Auxiliaries Testing, Turbine Bypass Valve Testing, Turbine Stop Valve Testing and Control Rod Exercise. March 11 0822 Returning to rated thetaal power. March 12 1500 Reducing power to 2365 MWt to perform minor Rod Pattern Adjustment. March 12 1511 Returning to rated thermal power. March 13 0755 Reducing load to 750 GMWe due to erratic control characteristics of the "A" Reactor Recirculation System Pump. March 13 0805 Returning to rated thermal power. March 14 2055 Reducing power to 2365 MWt to perform minor Rod Pattern Adjustment. March 14 2130 Returning to rated thermal power. March 18 2300 Reducing load to 740 GMWe to perform Weekly Turbine Valve and Auxiliaries Testing, Turbine Stop Valve Testing, Control Rod Exercise and a minor Rod Pattern Adjustment. March 19 0023 Returning to rated thermal power. March 25 2200 Reducing load to 700 GMWe to perform Control Rod Pattern Adjustment, Weekly Turbine Valve and Auxiliaries Testing, Turbine Control Valve Testing, Turbine Stop Valve Testing and Control Rod Exercise. March 26 0105 Returning to rated thermal power. March 31 2400 Maintaining rated thermal power. E2-1 l

'Ag , OPERATING DATA REPORT DOCKET NO.'50-366 DATE: ~ APRIL 6, 1989 COMPLETED BY: R. M. BEARD. TELEPHONE: (912) 367-7781'x2878

OPERATING STATUS:

1'. UNIT NAME: -E. I. HATCH UNIT'2

        ' 2.: REPORTING PERIOD:-                                                                      MARCH, 1989 3.' LICENSED THERMAL' POWER (MWt):                                                          2436
        ' 4.. NAMEPLATE RATING (GROSS MWe):                                                           850-5.' DESIGN ELECTRICAL RATING (NET MWe):                                                     784
        - 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
                        ~

800.7

        . 7.' MAXIMUM DEPENDABLE CAPACITY (NET MWe):                                                  767.7-8..IF CHANGES OCCUR ~IN CAPACITY RATINGS (ITEMS-3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:                                  NO CHANGES
9. POWER LEVEL TO WHICH RESTRICTED,.IF ANY (NET MWe): NO RESTRICTIONS'
10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YR-TO-DATE CUMULATIVE-
        - 11. HOURS IN REPORTING PERIOD:                                                         744                                                             2160             83761.
        ~ 12. NUMBER OF. HOURS REACTOR WAS CRITICAL:                                           744.0                                                             2160          61062.3-
        - 13.' REACTOR RESERVE SHUTDOWN HOURS:                                                   0.0                                                                 0                 0.0
14. MOURS GENERATOR ON LINE: 744.0 2160 58516.0
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0 0.0 16.: GROSS THERMAL ENERGY GENERATED (MWH): 1785984 5208240 127245665
17. GROSS-ELEC. ENERGY GENERATED,(MWH): 583920 1709050 41802040
18. NET ELEC. ENERGY GENERATED (MWH): 559179 1637614 39794799
         '19. UNIT. SERVICE FACTOR:                                                            100.0%                                                           100.0%             69.9%
        ' 20. UNIT AVAILABILITY FACTOR:                                                        100.0%                                                           100.0%             69.9%
21. UNIT CAPACITY FACTOR (USING MDC NET): 97.9% 98.8% 62.2%'
22. UNIT CAPACITY FACTOR-(USING DER NET): 95.9% 96.7% 60.6%

23.' UNIT FORCED OUTAGE RATE: 0.0% 0.0% 9.0%

         .24.. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

Maintenance Outage: Canceled; Work to be accomplished during load reduction. Refueling-Outage: Scheduled for August 30, 1989; 102 Days

        ' 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:                                                                                                    N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A E2-2

l* .

             =.

l ' UNIT 2 DOCKET NO. 50-366 AVERAGE DAILY DATE: APRIL 6, 1989 POWER LEVEL COMPLETED BY: R. M. BEARD MARCH, 1989 TELEPHONE: (912) 367-7781 A2878 i DAY Net MWe 1 ......... 768 2 ......... 767 3 ......... 767 4 ......... 756 5 ......... 752 6 ......... 761 7 ......... 770 8 ......... 771 , 9 ......... 769 10 ......... 726 11 ......... 514 12 ......... 763-13 ......... 762 14 ......... 759 15 ......... 759 16 ......... 756 17 ......... 758 18 ......... 755 19 ......... 759 20 ......... 760 21 ......... 760 22 ......... 764 23 ......... 768 24 ......... 769 25 ......... 757 26 ......... 744 27 ... ..... 756 28 ...... .. 757-

                    .29  .........       757 30  .........       756 31  .........       760 t

E2-3

, 1

                     . UNIT SHUTDOWNS AND POWER REDUCTIONS               DOCKET NO. 50-366 DATE: APRIL 6, 1989 UNIT NAME:    E. I. HATCH 2                COMPLETED BY: R. M. BEARD TELEPHONE:   (912) 367.7781.x2878                                    i REPORT MONTH: MARCH, 1989 l

R M S E E Y T A T LICENSEE SC Y S H EVENT TO COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER NE (SUBCODE) PREVENT RECURRENCE 89-002 890310 S 17.92 E 5 N/A CB GENERA Power was reduced in order to (X) remove the Reactor j Recirculation System Pumps ' from service, one at a time, for needed repairs to the

                                                      '                             associated Motor / Generator Sets. While at reduced power the required weekly testing was also performed.

F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20% B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS. E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION j F-ADMINISTRATIVE 9 - OTHER (EXPLAIN) G-OPERATIONAL ERROR (EXPLAIN) H-OTHER (EXPLAIN) E2-4

le4  ;, ~ . ceo,g 69 ,r:carpany- ' -- l ys ' 303 thedmoN Asenw .j AtGnta Geoq,a 303ve ' r

                       - Ieiephor:e 404. f261"y,
                      .. Ma$ng Adt9%

L , ao mermncmer ram.~,ar k'St Off ct! Boy.1.2i6 thrrr.ngham. 4'ch.3ma 3e B;f - iipephone N ZG 6561' hs muy m vuxu , ate rn W. G. Haireen Hi . SFinaf V;Ce Pfeideh! UdCh 37 CDefifiQn$ , HL-426

                                                                                                   '0550I X7GJ17-H510 April 10, 1989 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk'
                    - Washington, D. C. 20555   .

PLANT HATCH . UNITS 1, 2 L NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 MONTHLY OPERATING REPORTS

                    - Gentlemen:

Enclosed are the Monthly Operating . Reports -for Plant Hatch Unit 1,  ; Docket Number 50-321, and for Plant Hatch Unit 2, Docket Number 50-366. 1 These reports are submitted in' accordance with the requirements of Technical Specifications Section 6.9.1.10. Sincerely, g/.). Ada W H. G. Hairston, III SJB/1s i

Enclosures:

1. Monthly Operating Report for Hatch-1
2. Monthly Operating Report for Hatch-2 l

c: (See next page.) i

G~- ,.

                    .=

g . L - U. S. Nuclear Regulatory Commission-1 April 10, 1989 Page Two c: Georai.a Power Company Mr. H..C. Nix, General Manager - Plant Hatch Mr. L.'T. Gucwa, Manager Nuclear Engineering and~ Licensing

                                                           -GO-NORMS U. S.' Nuclear Reaulatory Commission. Washinaton. D. C.

Mr. L., P. Crocker, Licensing Project Manager - Hatch _ , U. S. Nuclear Reaulatory Commission. Reaion II Mr. S. D. Ebeneter, . Regional Administrator

                                                           ~Mr.'J. E. Henning, Senior Resident Inspector - Hatch l

l 0550I _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _}}