IR 05000298/1989013

From kanterella
Revision as of 06:32, 22 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Insp Rept 50-298/89-13 on 890327-30.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions Resulting from NRC Info Notice 86-053 Re Improper Installation of Heat Shrinkable Tubing at Nuclear Plants
ML20245C113
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/12/1989
From: Andrea Johnson, Stetka T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20245C106 List:
References
50-298-89-13, IEIN-86-053, IEIN-86-53, NUDOCS 8904270006
Download: ML20245C113 (10)


Text

[

,

. .

. .

.

APPENDIX

,

U.S. NUCLEAR REGULATORY COMMISS10N

REGION IV

NRC Inspection Report: 50-298/89-13 Operating License: DPR-46 j Docket: 50-298 .

Licensee: Nebraska Public Power District (NPPD)

P.O. Box 499 Columbus, NE 68601 Facility Name: CooperNuclearStation(CNS)

Inspection At: CNS, Brownsville, Nebraska and NPPD Corporate Office, Columbus, Nebraska Inspection Conducted: March 27 and 30, 1989 (CNS)

March 28-30, 1989 (NPPD Corporate Office)

Inspector: [ MJ4CA I E N/2[T7 A. R. Johnton, Reactor Inspector, Plant Systems Date'

Section, Division of Reactor Safety Consultant: M. Jacobus, Consultant Engineer, Sandia National Laboratory (SNL)

~

N 0 Wi1 - ),

4//#/87 Approved: N/ @/)Ji/29 T. F. Stetka, Chief, Plant Systems Section Date Division of Reactor Safety Inspection Summary Inspection Conducted March 27-30, 1989 (Report 50-298/89-13)

Areas Inspected: Routine, unannounced inspection of the licensee's actions resulting from NRC Information Notice (IN) 86-53 with regards to improper i'

installation of heat shrinkable tubing (HST) at nuclear plants. In addition, the licensee's actions on previously identified items regardin9 equipment qualification (EQ) as documented in NRC Inspection Reports 50-298/86-28, l April 1, 1987, and 50-298/88-26, October 19, 1988, and the Notice of Violation j j

dated October 25, 1988, were reviewe i I

e904270006 090417 90 DR ADOCn 0500

_ _ _ . . _ _ _ . -_ . _ _ _ _ _ _ _ _ _ _ _

__

.

.

. .

2_

Results: Within the areas inspected, no violations or deviations were identified. HST in bulk fann and engineered kits for specific applications are installed in accordance with qualification procedures and test criteria at CN Seven violations and one open item pertaining to EQ items have been close I l

l l

L _ _ _ _ _ _ ____ _ ____ _ ______________.__________ __ ________________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ . _ _ _ .

- _ - - - - - - .

__

.

.

.

. .

.

-3-DETAILS Persons Contacted NPPD/CNS

  • G. Horn, Division Manager of Nuclear Operations
  • E. Mace, Engineering Manager H. Hitch, Jr., Plant Services Manager R. Gardner, Maintenance Manager
  • G. Smith, Licensing Supervisor D. Robinson, Operations Quality Assurance Supervisor L. Bray, Licensing Specialist S. Ernest, EQ Coordinator NPPD/ Corporate Office
  • S. McClure, Engineering Manager
  • Fischer Electrical Engineering Supervisor
  • D. Buman, Electrical Engineer
  • M. Bennett, Nuclear Licensing and Safety Engineer
  • T. Arlt Licensing Specialist
  • R. Minadeo EQ Consultant to NPPD, Patel Engineers NRC R. Bennett, Senior Resident Inspector
  • G. Pick, Resident Inspector
  • T. Stetka, Chief, Plant Systems Section, Region IV Sandia National Laboratory
  • M. Jacobus, Consultant Engineer to NRC
  • Denotes attendance or teleconference participant at the exit meeting held at the NPPD corporate office on March 30, 198 . Licensee Actions on Previously Identified Items l

2.1 (Closed) Violation Part I.A (EA 88-159) (298/8628-03): During the November 1986 NRC EQ inspection, the licensee's E0 data package (EQDP) No. 5 for Kerite 600 volt cable, type HTK/FR, did not adequately support qualification in that the documented test results did not meet the acceptance criteria for adequate insulation resistance (IR)

during accident testing. NPPD has now analyzed the IR values and considu ed applications of these values to the Kerite cable used in the !

i l

pl a n '. . ?>w type testing has been documented and this testing confirmed I qualt :c:o ion of the Kerite cable for outside drywell application Rest. icted use of Kerite cable for outside drywell applications has been impoted. Kerite cable originally used inside the drywell has been '

,

replm.ed using a qualified Rockbestos Firewell III, Type SIS cable. NPPD l

_ _ _ _ _ _ - . _ _ _ _ _ __

_ _ _ _ _ - _ _ _ _ _ _ _

, .

A g

.

.

has implemented a computerized cable tracking program which identifies all cable used in E0 applications at CNS. The EODP No. 5 documentation file has been updated and is current to demonstrate qualification of Kerite cable used at CN This violation is close .2 (Closed) Violation Part I.B (EA 88-159)(298/8628-07): During the November 1986 NRC EQ inspection, the licensee's EQDP Nos. 220 and 220A for Fenwal/Patel temperature switches, Model 01-170230-090 did not adequately establish qualification because of failure to base the qualification of the interfacing Thomas & Bettu (T&B) STA-KON friction crimped cable splices on full accident conditions. NPPD has added a new EQDP Fo, 235 to the documentation file. EQDP No. 235 now contains test results that include postulated accident radiation levels and service life radiation, temperature, and aging effects for the T&B STA-KON connector splice NPPD reviewed their plant equipment for other applications where T&B STA-KOH splices are used; however, none were found in use in EQ application This violation is close .3 (Closed) Violation Part I.C (EA 88-159): During the Noveriber 1986 NRC EQ inspection, the licensee's EQDP No. 40 for Scotch 130/70/17 tape cable splices used to splice motor lead power connections in Limitorque motor operators, did not adequately establish qualification in that the documentation in the file could not demonstrate qualification for Scotch splices over fiberglass braided jacket motor leads. NPPD has fully evaluated and documented the qualification of Scotch 130/70/17 splice methodology to EQ cables including over fiberglass braided cabl Documentation for one qualified application, involving a successfully tested Scotch splice to silicone rubber insulation, was retrieved from the NPPD archives and placed in the file. However, all Scotch tape cable splices used in EQ applications at CNS have been replaced using qualified Okonite T95/35 tape splices which have been fully documented in

'

EQDP No. 224.

'

This violation is close l l 2.4 (Closed) Violation Part II.A (EA 88-159)(298/8628-01): During the 1 l November 1986 NRC EQ inspection, the licensee's EQDP No. 6 for Boston )

i Insulated Wire (BIW) Bostrad 7E, did not adequately demonstrate 1 l qualification because of failure to analyze the effects of cable l performance when used with penetrations, splices, and longer than type j l test lengths, a applicable to CNS. NPPD has now performed further 1 analyses to address the accuracy aspects related to instrumentation and  !

control circuits at CNS. The analyses were reviewed by the NRC and the IR J values were determined to be adequate to demonstrate cable qualification j for the CNS circuit configurations. The decreases in irs for BIW cables when penetrations, splices, and greater than 50 foot test lengths are used, demonstrated acceptable performance. The demonstrated acceptable IR

.

.

. .

-5-L decreases meet the intent of NRC Information Notice (IN) 85-39

"Auditability of EQ Records at Licensees Facilities."

This violation is close .5 (Closed) Violation Part II.B (EA 88-159)(298/8628-06): During the l November 1986 NRC EQ inspection, the licensee's E0DP No's. 12, 13, 36, 37, 493 76, 81, 217, 222, and 228 for various pressure / level switches and transmitters, did not adequately establish qualification because the documentation in the file failed to address mounting, orientation, and interface requirements. NPPD has now revi.;ed CNS Procedure No. 3.1 Revision 5. " Equipment Qualification Data Packr.ge" to include a specific section on installed verses tested configurations. The NRC inspector reviewed the above EQDPs and verified that additional clarification was added to comply with the new procedural requirements. All other EQDPs are also in the process of being revised accordingly as applicable to the procedural requirements to specify mounting, orientation, and interface requirements. This E00P revision effort is now 85 percent complete, and completion is targeted for June 198 This violation is close .6 (Closed) Violation Part II.C (EA 88-159)(298/8628-04): During the November 1986 NRC EQ inspection, the licensee's EDQP No. 4 contained documentation fo. five types of Raychem coaxial cable and it could not be determined whether Rayolin F and R insulation materials that were type tested were the same as those installed. NPPD completed a cable review walkdown in June 1988, in which it was determined that neither Rayolin types are used in EQ applications at CNS. This Notice of Violation required no written response from the license This violation is close .7 (Closed) Violation (298/8826-01): During the November 1986 NCC EQ inspection, the licensee's EQDP No's, 224 and 31A did not contain qualification documentation for Okonite T95/35 tape cable field splices to Limitorque motor operator field cable power leads with fiberglass braided jackets. NPPD has now revised CNS Procedures 7.3.26.1 and 7.3.26.2 to now require that the jacket be stripped back for cable tape splice applications to field fiberglass jadet motor leads. Consequently, Okonite splice tape sealing occurs between the tape and the field cable insulation as demonstrated by an Okonite type test documented in E0DP 22 All Okonite tape splices to Limitorque motor operators at CNS now have been installed using this procedural guidance. One exception called for by these CNS procedures prohibits the stripping back of the fiberglass braid which would result in the destruction of the jacket / insulation integrit In these cases, the Okonite T95 tape is bonded directly to the outer cable assembly which is made up of Nomex insulation (paper layers)

compressed with a varnished fiberglass braid. NPPD has tested this application to the CNS worst case accident profiles inside and outside the drywell. The type test results have demonstrated these splice

- _ - - _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ - _ . _ _ - - ._ _ ._ _ - _ __-_

,

__ . _ _ _ . _ _ _ _ _

e *

. .

-6-configurations can survive up to 46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> during these accidents. During the NPPD walkdown of Limitorque motor operators inside drywell, seven operators were identified which have the Nomex fiberglass braided motor lead splices. All seven require only a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> operability time during the accident conditions which is well within the demonstrated 46 hour5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> type testing survival perio This violation is close .8 (Closed) Open Item (298/8826-02): During the November 1986 NRC EQ inspection, the licensee's EQDP No. 31 contained inadequate documentation to establish qualification for T&B, RB-4 and RC-6 nylon crimp connector splices used by the manufacturer in the construction of dual voltage motor operators. The NRC inspector reviewed the timeliness of NPPD actions to correct any deficient conditions in Limitorque motor operators in accordance with the guidance given in IN 86-03 " Potential Deficiencies in Environmental Qualification of Limitorque Motor Valve Operator Wiring."

During a walkdown of CNS by NPPD, it was determined that all T&B nylon crimp type connector splices used in dual voltage motor operators have been replaced with qualified Okonite T95/3,5 tape splices. Dual voltage motor operators are not used within the drywell at CNS with one exception:

Motor Operator RHR-MOT-M018 used in 480VAC service. The motor operator, however, was retrofitted using qualified Buchanan terminal blocks in lieu of the T&B splice This open item is close .0 Programs for Installation of Heat Shrinkable Tubing (HST)

The NRC inspector reviewed the licensee's program for the installation and inspection of HST used on electrical and instrumentation splice connections and terminations. The licensee's review was performed in response to the issuance of IN 86-53, " Improper Installation of Heat Shrinkable Tubing" dated June 76, 1986, which identified industry problems with installation of splice connections manufactured by Raychem. NPPD's established program required an inspection of all safety-related splice connections in a harsh environment for instrument, control, and f motor circuits (both 480 and 4160 VAC) in accordance with IN 86-5 To ensure that Raychem splice connections are properly installed at CNS, j NPPD issued the following CNS procedures which were reviewed by the NRC inspector:

Procedure N Revision N Title 7.3.2 EO Raychem WCSF-N Insulated I Splices (Bolted) 1 7.3.2 Special 1" Overlap Raychem WCSF-N Insulated Splices (Bolted)

I

_ - - _ _ _ _ _ _ _

._ - ______ _ . _ _ _ _ _ .__

.

...

.. .

-

-7-

'

7.3.26.5' O Special Raychem WCSF-N'

Insulatedl Splices Overlap (Crimped)

7.3.2 EQ Raychem WCSF-N Wire and Cable Insulation Repairs 7.3.2 EQ Raychem WCSF-N Rosemoun Conduit. Seal Splices 7.3.2 EQ Raychem 4160 V Motor Head Splices The NRC inspector walked down the following equipment at CNS to examine the quality of the Raychem installations in accordance with CNS Procedures 7.3.26.3, 7.3.26.5, and 7.3.26.7 above:

Tag N Description Manufacturer PC PT-20 Torus Pressure Rosenount 1153D Transmitter

-

SW-FT-387A Service Water Flow-Reactor Rosemount 1153D Heat Exchanger A Transmitter SW-FT-3878 Service Water Flow-Reactor Rosemount 1153D Heat Exchanger B Transmitter RHR-TE-94A Temperature - RHR Heat Conax Resistance Exchanger Inlet Temperature Detector (RTD)

RHR-TE-94C Temperature - RHR Heat Conax RTD Exchanger Outlet RHR-TE-94B Temperature - RHR Heat Conax RTD Exchanger Inlet RHR-TE-94D Temperature - RHR Heat Conax RTD Exchanger Outlet The following attributes were observed by the NRC inspector and were indicative of proper installation of Raychem HST:

  • Evidence of uniform heating around the circumference to the starting point and moving progressively to each en * Uniform overall shrinkage as evidenced by a smooth shiny outer surfac *

Small bead of red adhesive visible at both end _ _ _ - - . _ _ _ _ _ _ _ _ _ _ _ _ ____________________________u

. _ _ - - _ _ _ _ - - - - _ _ _ _ _ _ _ _ . _ - _ _ - _ - - -. - - _

-

. :-

-8

-

.HST properly positioned allowing appropriate sleeve length *

No surface blisterin *

No excessive bend radi "

. Assembly (i.e., sleeves, filters, spacers, breakouts, etc.) was in agreement with the drawings contained in each of the above CNS procedure Based on the review of the above CNS procedures and a walkdown to sample installed splice configurations by the NRC inspector, it appears that the licensee was implementing a program that ensures proper installation of Raychem splice connector No violations or deviations were identifie . Exit Interview ,

The inspection scope and findings were summarized in an exit meeting held at the corporate office on March 30, 1989, with the licensee personnel indicated in paragraph 1 above. The licensee did not identify as proprietary any of the materials provided to or reviewed by the NRC inspector during the inspection.

i

_ -_ _.___.__.-___._..__-_______m_.-. _ _ _

_ - - - - _ _ - - --- - - - _ _ _ _ _ _ _ _ - - _ _

_ _ - _ _ _ _ -- _ - - _ _ _

i IC.c pO:M 7ee- U.S. NUCLEAR REGULATORY COMMIS$10N PRINCIPAL INSPECTOR (Name last, insf. a m e eed,a4

' ' '

INSPECTOR'S REPORT

-

.

RI EWER /

. Office of Inspection and Enforcement q g -

p INSPECTORS -

AN hI % h _ i 1 _, , [

Eb c du s ' /

b\, (b.ni Idd d ka6due.- Com ut.m u 7)

LICENSEEtVENDOM TRANSA TION gg 7 g , * ] pgpggy gggy gggpfC DITE NO (BY PRODUCTII13 0.gosi NO SEO MO vR 06 0 0 0 1 9 6

-

Yli f rA A f.t oe d s 89 1 % ^

P. n . %v 480 .

', * - * *'" si

. O ha1 JJ$ s

'

dbv/'Ah ra . D - DELETE C g , \\ bP I$(#01 R - REPLACE D bOOtI NOfNidk N dim '

~' '

2 14 15 ta ptMIODDF INVESTIGATION / INSPECTION INSPECTION PERFORMED By ORGANIZATION COCE OF REGION /MO CONDUCT-FROM TO X 1. REGIONAL OFFICE ST arf OTHER [ ,

M DAY Y M DAY Y RESIDENT INSPECTOR FIEGON DIVI $lON BRANCH oB 217 89 0 13 310 W9 2 - '< aFoaa^~ce ^a'a^'s^5^* t G /

20 ' 26 26 35 ,32 33 r 34 35 REGION 4 ACTION TYPE OF ACTiviTv CONDUCTED (Checa one bon onsv i (Check one bon ontv!

X 02 - SAFETY 06 - MGMT. VISIT 10 - PLANT SE _

14 - INOUIRY 1 - NRC FORM 6ei 03 - INCIDENT 07 - SPECIAL 11 - INVENT. VE INVESTIGATION 2 - REGIONAL OFFICE LETTER 04 - ENFORCEMENT 08 - VSDOR 12 - SHIPMENT / EXPORT

'

05 - MGMT. AUDIT 09 - MAT ACC _ MPORT

~

36 31 31 6NbP;cTeQN AvEaTsGATaON hN>NGb

.Chern one im oaiv> TOT AL NUMBER ENFORCEMENT CONFERENCE REPORT CONT AIN 2 790 LETTER OF REPORT TRANSMITTAL DATE OF VIOLATONS AND HELD INFORMATION A B C D DEVIATONS NRC FORM 691 RE PORT SENT

,

OR REG TO MO FOR LETTE R IS $ULD ACYlON 2 - VOLATiON 3 - DEVIATION A C D B

Al9 C D A B C D MO DA YL g MO DAY VR 4 - VOLATON & DEVIATON , , , , l 1 YES 1., ygS Q lll @7l l l 1 3 4041 42 ' 43 44 89 50 55 MODULE INFORM Af TON MODUL f *N50AMAtioN kM, gE,C MODULE NUMBER INS dg MODULE REO FOLLOWUP Ib MODULE NUMBER INS g 3g MODULE REO FOLLOWUP

_ pp go .

DD

.

rgLg so -

j $!! n! $E!! $$i

Ig  !;! ohig

' E E i -

!!! 5  !! En5

r

g

,

s z

s

=5 i !e,[5 g< 8 r

. .

e s a

r$erarKr8e a

vio :E a a a

t < g; aM rE ,g g

.

-

c

,

<mg-I a5 ea m

r e

e m l Lmp ~r r8e eso E n s- s c >< M E,

.

r

-

e M5 biOW,0i $l ^ OA2, ,, i liil R , i 1e iI ^

i e i i il il En4 m a. y *

i , , , i liil a i i i i i Iiil Ed c i i , , i liil c i i i i i liil M4.LbM3h- a

, , i , i liil o i i i i i i i i l

. ds9,MiDiPJ ^ Dil ,7 i i o i l,il e , , liiI ^

i i i i i liil

.{-Mo4

'

liil Iiil 1 N <> pen

, , , , i i i , i i Q W (' t i T

y C i i i i t Ii,i C i i i i i lI I I A com mu o i i , , , I,,I o , , , , I i ,il a d4 9,217ioil l ^ 0,04 ,, o i Ii,l . i , iiil ^

i i i , i It ,1 74*h *

i i , i i le il '

i i i Itil on Av i C

, , , , I l,il c I . , i i !I il 14* g o

, , , , i liil o e i i i i I,iI

. %ddad i71 ^ 0,0i /o \,0io o i l>il . i i liiI ^

ii i i i i iiI

Iii! '

i liiI M] *M*g c

, , it t , i i i pg .

i i ii i liil c i, i i i ll i l e CIRCLE sEOU CE iF vCL A f eon Ou af viATiON 3 l i 3 j , , i i e ie i i , e i ei , , ,

i l : i i

'

tl2slals- 4

~ to 12 is 4 15 is ' ia to ao 21 ; s 1 2e 1]2 sl 4 l5' 10 12 is is is is i ts 2i> 21 25

-.

_ _

,

__

_ _ _ _ _ _ ___ .__ _ __

y

., ..

  • .

,

ATTACHMENT 2

~ ~

UPDATE FORM TACILITY: Ub DOCKET:- AciA TO 14 kl S C) td ORIGINATORS NAME: DOOOOOOOOOORODOOOOOO

__ TYPE: O R

, f S96 SQb6dl ~

-~ ITEM NO.:

'

,000 000000

. B lo 1 @>

REPORI:

D00000 I

&L PARAGRAPH: OOO FUNCTIONAL AREA: '00000O00000000000000  ;

3 r v) Bos7 tap 7E cas tE DESCRIPTION: 0000000000u0000000D0 l

000000000000000000D0 000000000000D00000D0 STATUS CODE: OO UPDATE /CLOSE $. O <M E5 / 89 'l b PARA / REPORT OOOO DD00 DDD00OOGD0 RESPONSIBLE T6S /DE SECTION OOOOOO OOO DETAILS:

.

_____.m._- ____m._ - _ _ _ _ _ _ _ _ _ _ _ _ _______-_____-__._________.-_____________________m.______.________.__-_______.-_._,___ -__.._____<__m__._____-_____-______._.;