Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted. Major Areas Inspected:Inspectors Performed Partial Walkdown of high-pressure Coolant Injection Sys,Including Components Located in Sys Pump RoomML20210P705 |
Person / Time |
---|
Site: |
Cooper |
---|
Issue date: |
08/09/1999 |
---|
From: |
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
---|
To: |
|
---|
Shared Package |
---|
ML20210P692 |
List: |
---|
References |
---|
50-298-99-06, NUDOCS 9908130065 |
Download: ML20210P705 (8) |
|
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000298/19990121999-10-22022 October 1999 Insp Rept 50-298/99-12 on 990927-30.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program & Included Review of Emergency Preparedness Performance Indicators IR 05000298/19990101999-10-14014 October 1999 Insp Rept 50-298/99-10 on 990920-24.No Violations Noted. Major Areas Inspected:Radiological Environ & Meteorological Monitoring Programs & Program for Unrestricted Release of Matl from Radiological Controlled Area IR 05000298/19990031999-10-0808 October 1999 Insp Rept 50-298/99-03 on 990823-27 & 990907-10.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000298/19990071999-09-27027 September 1999 Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Implementation of Reactor Safety & Emergency Preparedness Programs IR 05000298/19990091999-09-22022 September 1999 Insp Rept 50-298/99-09 on 990823-26.No Violations Noted. Major Areas Inspected:Radioactive Matl Processing & Shipping Programs & Occupational Radiation Safety Performance Indicator IR 05000298/19990081999-09-14014 September 1999 Insp Rept 50-298/99-08 on 990816-20.No Violations Noted. Major Areas Inspected:Access Authorization/Fitness-for-Duty (Behavior Observation) Program,Access Control of Personnel, Packages & Vehicles Into Protected & Vital Areas & PIs IR 05000298/19990061999-08-0909 August 1999 Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted. Major Areas Inspected:Inspectors Performed Partial Walkdown of high-pressure Coolant Injection Sys,Including Components Located in Sys Pump Room IR 05000298/19990021999-07-21021 July 1999 Insp Rept 50-298/99-02 on 990628-0702.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluation Operator IR 05000298/19990051999-06-16016 June 1999 Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000298/19990041999-05-19019 May 1999 Insp Rept 50-298/99-04 on 990321-0501.Non-cited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Status.Emergency Procedures Failed to Instruct Operators When to Reduce Core Spray Pump Flow Following DBA IR 05000298/19990011999-05-0505 May 1999 Insp Rept 50-298/99-01 on 990207-0320.Non-cited Violations Noted.Major Areas Inspected:Operations & Maint ML20204D9811999-03-18018 March 1999 Insp Rept 50-298/98-09 on 981227-990206.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980081999-01-22022 January 1999 Insp Rept 50-298/98-08 on 980115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199E1691999-01-0707 January 1999 Insp Rept 50-298/98-22 on 981116-1208.Violations Noted.Major Areas Inspected:Licensee Performance in Completing Engineering Strategy Action Item 3.2.e IR 05000298/19980151998-12-17017 December 1998 Insp Rept 50-298/98-15 on 980504-22 & 980608-26.Violations Noted.Major Areas Inspected:Safety Sys Engineering Insp Performed for Dgs,Vital Ac Eds & CR Emergency Filtration Sys IR 05000298/19980071998-12-11011 December 1998 Insp Rept 50-298/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980211998-10-29029 October 1998 Insp Rept 50-298/98-21 on 981005-09.No Violations Noted. Major Areas Inspected:Third 10-yr Interval Inservice Insp Program,Including GE Reactor Insp Sys Automated Ultrasonic Exams of Reactor Vessel Circumferential Weld IR 05000298/19980061998-10-21021 October 1998 Insp Rept 50-298/98-06 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Plant Support IR 05000298/19980201998-09-21021 September 1998 Insp Rept 50-298/98-20 on 980831-0904.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000298/19980051998-09-18018 September 1998 Insp Rept 50-298/98-05 on 980712-0822.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980041998-08-19019 August 1998 Errata to Insp Rept 50-298/98-04.Page 10 of Rept Was Inadvertently Omitted ML20237A6221998-08-10010 August 1998 Insp Rept 50-298/98-04 on 980531-0711.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980181998-06-30030 June 1998 Insp Rept 50-298/98-18 on 980518-21 & 0608-11.No Violations Noted.Major Areas Inspected:Reviewed Radiation Protection Activities Including Exposure Controls,Controls of Radioactive Matls & Contamination IR 05000298/19980031998-06-23023 June 1998 Insp Rept 50-298/98-03 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980161998-06-22022 June 1998 Insp Rept 50-298/98-16 on 980608-11.Weakness Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale Biennial Exercise of Emergency Plan & Implementing Procedures IR 05000298/19980191998-06-17017 June 1998 Cancelled Insp Rept 50-298/98-19.Open Items Insp That Was Assigned NRC Insp Rept 50-298/98-19 Will Be Combined W/ Engineering Insp Documented in NRC Insp Rept 50-298/98-15 IR 05000298/19980021998-06-11011 June 1998 Errata to Insp Rept 50-298/98-02,dtd 980515.Changes Have Been Made to Fourth Paragraph IR 05000298/19980171998-05-26026 May 1998 Insp Rept 50-298/98-17 on 980504-08.Violations Noted.Major Areas Inspected:Plant Support ML20247L2721998-05-15015 May 1998 Insp Rept 50-298/98-02 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980131998-04-17017 April 1998 Insp Rept 50-298/98-13 on 980406-09.No Violations Noted. Major Areas Inspected:Training & Qualifications,Quality Assurance Oversight,Facilities & Equipment,Procedural Guidance & Annual Repts IR 05000298/19980141998-04-17017 April 1998 Insp Rept 50-298/98-14 on 980406-09.No Violations Noted. Major Areas Inspected:Organization & Mgt Controls, Radioactive Effluent Monitoring & safety-related Air Cleaning Sys ML20216F8721998-04-14014 April 1998 Insp Rept 50-298/98-12 on 980316-19.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits IR 05000298/19980111998-04-0909 April 1998 Cancelled Insp Rept 50-298/98-11.No Rept Will Be Issued W/Subj Number IR 05000298/19980011998-03-31031 March 1998 Insp Rept 50-298/98-01 on 980125-0307.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980101998-03-19019 March 1998 Insp Rept 50-298/98-10 on 980302-06.Violations Noted.Major Areas Inspected:Review of Access Authorization,Vehicle Access Control,Assessment Aids,Safeguards Event Logs,Plans & Procedures & Audit & self-assessment Programs IR 05000298/19970111998-02-23023 February 1998 Insp Rept 50-298/97-11 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19972011998-02-0505 February 1998 Insp Repts 50-298/97-201 on 971027-1121 & 1201-04.No Violations Noted.Major Areas Inspected:Rhr Sys & REC Sys ML20198L0471998-01-12012 January 1998 Insp Rept 50-298/97-10 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970091997-12-19019 December 1997 Insp Rept 50-298/97-09 on 970921-1101.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970191997-12-17017 December 1997 Insp Rept 50-298/97-19 on 971117-20.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring,Training & Qualifications,Qa Oversight,Facilities & Equipment IR 05000298/19970181997-12-17017 December 1997 Insp Rept 50-298/97-18 on 971020-1117.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000298/19970171997-12-10010 December 1997 Insp Rept 50-298/97-17 on 971117-20.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Evaluation IR 05000298/19970081997-10-20020 October 1997 Insp Rept 50-298/97-08 on 970810-0920.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000298/19970161997-10-0909 October 1997 Insp Rept 50-298/97-16 on 970915-24.Violations Noted.Major Areas Inspected:Follow Up on Licensee Planned & Implemented Activities Associated W/Erosion/Corrosion Monitoring Program & Open NRC Items IR 05000298/19970121997-10-0303 October 1997 Insp Rept 50-298/97-12 on 970708-0905.Violations Being Considered for Escalated Ea.Major Areas Inspected:Evaluation of Licensee Performance Re Recognizing Documenting & Correcting Conditions Adverse to Quality ML20154F2061997-09-19019 September 1997 Partially Withheld Insp Rept 50-298/97-15 on 970818-22 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Utilizing Technical Instruction 2515-132,dtd 960118 IR 05000298/19970131997-09-12012 September 1997 Insp Rept 50-298/97-13 on 970728-0814.Violation Noted.Major Areas Inspected:Surveillance Procedure IR 05000298/19970071997-09-0404 September 1997 Insp Rept 50-298/97-07 on 970629-0809.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000298/19970141997-08-27027 August 1997 Insp Rept 50-298/97-14 on 970804-08.No Violations Noted. Major Areas Inspected:Licensee FFD Program Utilizing IP 81502, FFD Program, ML20149K8881997-07-25025 July 1997 Insp Rept 50-298/97-06 on 970518-0628.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-27
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000298/19990121999-10-22022 October 1999 Insp Rept 50-298/99-12 on 990927-30.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program & Included Review of Emergency Preparedness Performance Indicators IR 05000298/19990101999-10-14014 October 1999 Insp Rept 50-298/99-10 on 990920-24.No Violations Noted. Major Areas Inspected:Radiological Environ & Meteorological Monitoring Programs & Program for Unrestricted Release of Matl from Radiological Controlled Area IR 05000298/19990031999-10-0808 October 1999 Insp Rept 50-298/99-03 on 990823-27 & 990907-10.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000298/19990071999-09-27027 September 1999 Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Implementation of Reactor Safety & Emergency Preparedness Programs IR 05000298/19990091999-09-22022 September 1999 Insp Rept 50-298/99-09 on 990823-26.No Violations Noted. Major Areas Inspected:Radioactive Matl Processing & Shipping Programs & Occupational Radiation Safety Performance Indicator IR 05000298/19990081999-09-14014 September 1999 Insp Rept 50-298/99-08 on 990816-20.No Violations Noted. Major Areas Inspected:Access Authorization/Fitness-for-Duty (Behavior Observation) Program,Access Control of Personnel, Packages & Vehicles Into Protected & Vital Areas & PIs IR 05000298/19990061999-08-0909 August 1999 Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted. Major Areas Inspected:Inspectors Performed Partial Walkdown of high-pressure Coolant Injection Sys,Including Components Located in Sys Pump Room IR 05000298/19990021999-07-21021 July 1999 Insp Rept 50-298/99-02 on 990628-0702.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluation Operator IR 05000298/19990051999-06-16016 June 1999 Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000298/19990041999-05-19019 May 1999 Insp Rept 50-298/99-04 on 990321-0501.Non-cited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Status.Emergency Procedures Failed to Instruct Operators When to Reduce Core Spray Pump Flow Following DBA IR 05000298/19990011999-05-0505 May 1999 Insp Rept 50-298/99-01 on 990207-0320.Non-cited Violations Noted.Major Areas Inspected:Operations & Maint ML20204D9811999-03-18018 March 1999 Insp Rept 50-298/98-09 on 981227-990206.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980081999-01-22022 January 1999 Insp Rept 50-298/98-08 on 980115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199E1691999-01-0707 January 1999 Insp Rept 50-298/98-22 on 981116-1208.Violations Noted.Major Areas Inspected:Licensee Performance in Completing Engineering Strategy Action Item 3.2.e IR 05000298/19980151998-12-17017 December 1998 Insp Rept 50-298/98-15 on 980504-22 & 980608-26.Violations Noted.Major Areas Inspected:Safety Sys Engineering Insp Performed for Dgs,Vital Ac Eds & CR Emergency Filtration Sys IR 05000298/19980071998-12-11011 December 1998 Insp Rept 50-298/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980211998-10-29029 October 1998 Insp Rept 50-298/98-21 on 981005-09.No Violations Noted. Major Areas Inspected:Third 10-yr Interval Inservice Insp Program,Including GE Reactor Insp Sys Automated Ultrasonic Exams of Reactor Vessel Circumferential Weld IR 05000298/19980061998-10-21021 October 1998 Insp Rept 50-298/98-06 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Plant Support IR 05000298/19980201998-09-21021 September 1998 Insp Rept 50-298/98-20 on 980831-0904.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000298/19980051998-09-18018 September 1998 Insp Rept 50-298/98-05 on 980712-0822.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980041998-08-19019 August 1998 Errata to Insp Rept 50-298/98-04.Page 10 of Rept Was Inadvertently Omitted ML20237A6221998-08-10010 August 1998 Insp Rept 50-298/98-04 on 980531-0711.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980181998-06-30030 June 1998 Insp Rept 50-298/98-18 on 980518-21 & 0608-11.No Violations Noted.Major Areas Inspected:Reviewed Radiation Protection Activities Including Exposure Controls,Controls of Radioactive Matls & Contamination IR 05000298/19980031998-06-23023 June 1998 Insp Rept 50-298/98-03 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980161998-06-22022 June 1998 Insp Rept 50-298/98-16 on 980608-11.Weakness Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale Biennial Exercise of Emergency Plan & Implementing Procedures IR 05000298/19980191998-06-17017 June 1998 Cancelled Insp Rept 50-298/98-19.Open Items Insp That Was Assigned NRC Insp Rept 50-298/98-19 Will Be Combined W/ Engineering Insp Documented in NRC Insp Rept 50-298/98-15 IR 05000298/19980021998-06-11011 June 1998 Errata to Insp Rept 50-298/98-02,dtd 980515.Changes Have Been Made to Fourth Paragraph IR 05000298/19980171998-05-26026 May 1998 Insp Rept 50-298/98-17 on 980504-08.Violations Noted.Major Areas Inspected:Plant Support ML20247L2721998-05-15015 May 1998 Insp Rept 50-298/98-02 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980131998-04-17017 April 1998 Insp Rept 50-298/98-13 on 980406-09.No Violations Noted. Major Areas Inspected:Training & Qualifications,Quality Assurance Oversight,Facilities & Equipment,Procedural Guidance & Annual Repts IR 05000298/19980141998-04-17017 April 1998 Insp Rept 50-298/98-14 on 980406-09.No Violations Noted. Major Areas Inspected:Organization & Mgt Controls, Radioactive Effluent Monitoring & safety-related Air Cleaning Sys ML20216F8721998-04-14014 April 1998 Insp Rept 50-298/98-12 on 980316-19.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits IR 05000298/19980111998-04-0909 April 1998 Cancelled Insp Rept 50-298/98-11.No Rept Will Be Issued W/Subj Number IR 05000298/19980011998-03-31031 March 1998 Insp Rept 50-298/98-01 on 980125-0307.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980101998-03-19019 March 1998 Insp Rept 50-298/98-10 on 980302-06.Violations Noted.Major Areas Inspected:Review of Access Authorization,Vehicle Access Control,Assessment Aids,Safeguards Event Logs,Plans & Procedures & Audit & self-assessment Programs IR 05000298/19970111998-02-23023 February 1998 Insp Rept 50-298/97-11 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19972011998-02-0505 February 1998 Insp Repts 50-298/97-201 on 971027-1121 & 1201-04.No Violations Noted.Major Areas Inspected:Rhr Sys & REC Sys ML20198L0471998-01-12012 January 1998 Insp Rept 50-298/97-10 on 971102-1213.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970091997-12-19019 December 1997 Insp Rept 50-298/97-09 on 970921-1101.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19970191997-12-17017 December 1997 Insp Rept 50-298/97-19 on 971117-20.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring,Training & Qualifications,Qa Oversight,Facilities & Equipment IR 05000298/19970181997-12-17017 December 1997 Insp Rept 50-298/97-18 on 971020-1117.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000298/19970171997-12-10010 December 1997 Insp Rept 50-298/97-17 on 971117-20.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Evaluation IR 05000298/19970081997-10-20020 October 1997 Insp Rept 50-298/97-08 on 970810-0920.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000298/19970161997-10-0909 October 1997 Insp Rept 50-298/97-16 on 970915-24.Violations Noted.Major Areas Inspected:Follow Up on Licensee Planned & Implemented Activities Associated W/Erosion/Corrosion Monitoring Program & Open NRC Items IR 05000298/19970121997-10-0303 October 1997 Insp Rept 50-298/97-12 on 970708-0905.Violations Being Considered for Escalated Ea.Major Areas Inspected:Evaluation of Licensee Performance Re Recognizing Documenting & Correcting Conditions Adverse to Quality ML20154F2061997-09-19019 September 1997 Partially Withheld Insp Rept 50-298/97-15 on 970818-22 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Utilizing Technical Instruction 2515-132,dtd 960118 IR 05000298/19970131997-09-12012 September 1997 Insp Rept 50-298/97-13 on 970728-0814.Violation Noted.Major Areas Inspected:Surveillance Procedure IR 05000298/19970071997-09-0404 September 1997 Insp Rept 50-298/97-07 on 970629-0809.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000298/19970141997-08-27027 August 1997 Insp Rept 50-298/97-14 on 970804-08.No Violations Noted. Major Areas Inspected:Licensee FFD Program Utilizing IP 81502, FFD Program, ML20149K8881997-07-25025 July 1997 Insp Rept 50-298/97-06 on 970518-0628.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000298/19990121999-10-22022 October 1999 Insp Rept 50-298/99-12 on 990927-30.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program & Included Review of Emergency Preparedness Performance Indicators IR 05000298/19990101999-10-14014 October 1999 Insp Rept 50-298/99-10 on 990920-24.No Violations Noted. Major Areas Inspected:Radiological Environ & Meteorological Monitoring Programs & Program for Unrestricted Release of Matl from Radiological Controlled Area IR 05000298/19990031999-10-0808 October 1999 Insp Rept 50-298/99-03 on 990823-27 & 990907-10.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000298/19990071999-09-27027 September 1999 Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted. Major Areas Inspected:Implementation of Reactor Safety & Emergency Preparedness Programs PNO-IV-99-040, on 990924,licensee Was Replacing Motor Operator for Suction Valve on B Recirculation Loop.After Completing Repairs,Operators Plan to Restart Reactor.Info Has Been Discussed with Licensee1999-09-24024 September 1999 PNO-IV-99-040:on 990924,licensee Was Replacing Motor Operator for Suction Valve on B Recirculation Loop.After Completing Repairs,Operators Plan to Restart Reactor.Info Has Been Discussed with Licensee IR 05000298/19990091999-09-22022 September 1999 Insp Rept 50-298/99-09 on 990823-26.No Violations Noted. Major Areas Inspected:Radioactive Matl Processing & Shipping Programs & Occupational Radiation Safety Performance Indicator IR 05000298/19990081999-09-14014 September 1999 Insp Rept 50-298/99-08 on 990816-20.No Violations Noted. Major Areas Inspected:Access Authorization/Fitness-for-Duty (Behavior Observation) Program,Access Control of Personnel, Packages & Vehicles Into Protected & Vital Areas & PIs IR 05000298/19990061999-08-0909 August 1999 Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted. Major Areas Inspected:Inspectors Performed Partial Walkdown of high-pressure Coolant Injection Sys,Including Components Located in Sys Pump Room IR 05000298/19990021999-07-21021 July 1999 Insp Rept 50-298/99-02 on 990628-0702.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluation Operator IR 05000298/19990051999-06-16016 June 1999 Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000298/19990041999-05-19019 May 1999 Insp Rept 50-298/99-04 on 990321-0501.Non-cited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Status.Emergency Procedures Failed to Instruct Operators When to Reduce Core Spray Pump Flow Following DBA IR 05000298/19990011999-05-0505 May 1999 Insp Rept 50-298/99-01 on 990207-0320.Non-cited Violations Noted.Major Areas Inspected:Operations & Maint ML20204D9811999-03-18018 March 1999 Insp Rept 50-298/98-09 on 981227-990206.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19993011999-03-0909 March 1999 NRC Operator Licensing Exam Rept 50-298/99-301 (Including Completed & Graded Tests) for Tests Administered on 990212. Exam Results:Four Reactor Operator License Applicants Passed Exam IR 05000298/19980081999-01-22022 January 1999 Insp Rept 50-298/98-08 on 980115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20202E3261999-01-22022 January 1999 Notice of Violation from Insp on 981115-1226.Violation Noted:Licensee Failed to Take Effective Measures to Preclude Repetition of Inadvertent Opening of torus-to-drywell Vacuum Breaker Documented in LER 50-298/97-007 IR 05000298/19960041999-01-0707 January 1999 Notice of Violation from Insp on 981116-1208.Violation Noted:Deviations from Plant Design Basis Identified as Result of Investigation Following Issuance of Violation 50-298/9604-1013 Not Properly Corrected ML20199E1691999-01-0707 January 1999 Insp Rept 50-298/98-22 on 981116-1208.Violations Noted.Major Areas Inspected:Licensee Performance in Completing Engineering Strategy Action Item 3.2.e IR 05000298/19980151998-12-17017 December 1998 Insp Rept 50-298/98-15 on 980504-22 & 980608-26.Violations Noted.Major Areas Inspected:Safety Sys Engineering Insp Performed for Dgs,Vital Ac Eds & CR Emergency Filtration Sys ML20198J3531998-12-17017 December 1998 Notice of Violation from Insp on 980504-22 & 0608-26. Violation Noted:As of October 1997,licensee Failed to Provide Procedures to Implement Compensatory Measures for Standby Liquid Control Tank Heater Failure,Per USAR ML20197J7321998-12-11011 December 1998 Notice of Violation from Insp on 981004-1114.Violation Noted:On 981001,inspectors Identified That Between 980125- 980125 & 0916,licensee Failed to Properly Maintain Procedures Governing Operation of Reactor Equipment Cooling IR 05000298/19980071998-12-11011 December 1998 Insp Rept 50-298/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980211998-10-29029 October 1998 Insp Rept 50-298/98-21 on 981005-09.No Violations Noted. Major Areas Inspected:Third 10-yr Interval Inservice Insp Program,Including GE Reactor Insp Sys Automated Ultrasonic Exams of Reactor Vessel Circumferential Weld IR 05000298/19980061998-10-21021 October 1998 Insp Rept 50-298/98-06 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Plant Support IR 05000298/19980201998-09-21021 September 1998 Insp Rept 50-298/98-20 on 980831-0904.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000298/19980051998-09-18018 September 1998 Insp Rept 50-298/98-05 on 980712-0822.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000298/19980041998-08-19019 August 1998 Errata to Insp Rept 50-298/98-04.Page 10 of Rept Was Inadvertently Omitted IR 05000298/19980991998-08-17017 August 1998 SALP Rept 50-298/98-99 for Cooper Nuclear Station for Period of 970112-980711 ML20237A6221998-08-10010 August 1998 Insp Rept 50-298/98-04 on 980531-0711.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980181998-06-30030 June 1998 Insp Rept 50-298/98-18 on 980518-21 & 0608-11.No Violations Noted.Major Areas Inspected:Reviewed Radiation Protection Activities Including Exposure Controls,Controls of Radioactive Matls & Contamination IR 05000298/19980031998-06-23023 June 1998 Insp Rept 50-298/98-03 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 07100022/20120311998-06-23023 June 1998 Notice of Violation from Insp on 980419-0530.Violation Noted:No Explanation Was Included in Subsequent Annual Radioactive Matls Release Rept & Condition Was Not Repaired in Timely Manner from 971022-1231 IR 05000298/19980161998-06-22022 June 1998 Insp Rept 50-298/98-16 on 980608-11.Weakness Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale Biennial Exercise of Emergency Plan & Implementing Procedures IR 05000298/19980191998-06-17017 June 1998 Cancelled Insp Rept 50-298/98-19.Open Items Insp That Was Assigned NRC Insp Rept 50-298/98-19 Will Be Combined W/ Engineering Insp Documented in NRC Insp Rept 50-298/98-15 IR 05000298/19980021998-06-11011 June 1998 Errata to Insp Rept 50-298/98-02,dtd 980515.Changes Have Been Made to Fourth Paragraph ML20249C2481998-05-26026 May 1998 Notice of Violation from Insp on 980504-08.Violation Noted: on 980506,inspector Observed Group of Visitors Enter Protected Area That Were Not Issued Visitor Badges,Did Not Card in & Did Not Enter Protected Area Through Turnstiles IR 05000298/19980171998-05-26026 May 1998 Insp Rept 50-298/98-17 on 980504-08.Violations Noted.Major Areas Inspected:Plant Support ML20247L2451998-05-15015 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:Procedure 7.2.63 Was Inappropriate to Circumstances & Had No Appropriate Acceptance Criteria,In That Required Torque Value Not Given in Flange Bolt Work Instructions ML20247L2721998-05-15015 May 1998 Insp Rept 50-298/98-02 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000298/19980141998-04-17017 April 1998 Insp Rept 50-298/98-14 on 980406-09.No Violations Noted. Major Areas Inspected:Organization & Mgt Controls, Radioactive Effluent Monitoring & safety-related Air Cleaning Sys IR 05000298/19980131998-04-17017 April 1998 Insp Rept 50-298/98-13 on 980406-09.No Violations Noted. Major Areas Inspected:Training & Qualifications,Quality Assurance Oversight,Facilities & Equipment,Procedural Guidance & Annual Repts ML20216F8721998-04-14014 April 1998 Insp Rept 50-298/98-12 on 980316-19.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits IR 05000298/19980111998-04-0909 April 1998 Cancelled Insp Rept 50-298/98-11.No Rept Will Be Issued W/Subj Number IR 05000298/19980011998-03-31031 March 1998 Insp Rept 50-298/98-01 on 980125-0307.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217A3681998-03-19019 March 1998 Notice of Violation from Insp on 980302-06.Violation Noted:On Five Separate Occasions,Licensee Mgt Called in Workers to Perform Back Shift Work W/O Providing Transportation or Administering Breathalyser Test IR 05000298/19980101998-03-19019 March 1998 Insp Rept 50-298/98-10 on 980302-06.Violations Noted.Major Areas Inspected:Review of Access Authorization,Vehicle Access Control,Assessment Aids,Safeguards Event Logs,Plans & Procedures & Audit & self-assessment Programs IR 05000298/19970111998-02-23023 February 1998 Insp Rept 50-298/97-11 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203F8751998-02-23023 February 1998 Notice of Violation from Insp on 971214-980124.Violation Noted:On 971222,while MSL High RM Was Inoperable & Primary Containment Integrity Was Required,Licensee Opened Both Reactor Water Sample Valves IR 05000298/19972011998-02-0505 February 1998 Insp Repts 50-298/97-201 on 971027-1121 & 1201-04.No Violations Noted.Major Areas Inspected:Rhr Sys & REC Sys ML20198L0391998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:As of 971213,Procedure 6.SC.502,Rev 2,was Not Appropriate to Circumstances in That Did Not Include Appropriate Acceptance Criteria 1999-09-27
[Table view] |
Inspection Report - Cooper - 1999006 |
---|
|
|
Text
F
.
.
ENCLOSURE U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
Docket No.: 50-298 License No.: DPR-46 ;
Report No.: 50-298/99-06 Licensee: Nebraska Public Power District Facility: Cooper Nuclear Station Location: P.O. Box 98 Brownville, Nebraska Dates: May 30 through July 17,1999 Inspectors: M. Miller, Senior Resident inspector D. Loveless, Senior Project Engineer J. Melfi, Project Engineer, Project Branch E Accompanying Personnel: L. Willoughby, Reactor Engineer, Technical Support Section M. Hay, Resident inspector Approved By: Charles S. Marschall, Chief, Project Branch C
,
ATTACHMENT: Supplemental Information 9908130065 990809 PDR ADOCK 05000298 G PDR
.
.
SUMMARY OF FINDINGS Cooper Nuclear Station NRC Inspection Report 50-298/99-06 The report covers a 7-week period of baseline resident inspectio The body of the report is organized under the broad categories of Reactor Safety and Other Activitie Findings are assessed according to their potential risk significance and are assigned colors of green, white, yellow, or red. Green findings are indicative of issues that, while they may not be desirable, represent little risk to safety. White findings indicate issues with some increased risk to safety, which may require additional inspection resources. Yellow findings are more serious issues with higher potential risk to safe performance. Red findings represent an unacceptable loss of margin to safety and would result in the NRC taking significant actions that could include ordering the plant to be shut down. The findings are considered in total with other inspection findings and performance indicators to determine overall plant performanc Initiating Events
- No Significant Findings ,
!
Other
. No color. The inspectors identified three power changes that the licensee should have j reported as part of the performance indicator, Unplanned Power Changes per
'
7,000 Critical Hours, and did not. Following discussions of these events with licensee ;
representatives, the Nuclear Projects Manager initiated Problem Identification i Report 4-02841 to address the problem. The inspectors determined that despite the three additional unplanned power changes, the performance indicator remained green (Section 40A2).
- Green. On June 4,1999, approximately 5,000 gallons of water with 3 to 4 cubic feet of condensate demineralizer resin spilled onto the radioactive waste building basement floor. The inspectors determined that no significant radiation exposure nor potential overexposure had occurred. The inspectors determined that, because no significant radiation exposure nor potential overexposure had occurred, the spill remained within the licensee's response band (green). Operators documented the event in Problem Identification Report 4-02417 (Section 40A3).
r
..
..
Report Details 1.- REACTOR SAFETY -
1R04 - Eauioment Alianments ~ Insoection Scooe -
!The inspectors performed a partial walkdown of the high-pressure coolant injection system, including all components located in the system pump room. The inspectors reviewed the component alignments designated in Operations Procedure 2.2.33A, "High 1 Pressure Coolant injection System Component Checklist, Revision 13." They verified correct component alignments during the inspection using Piping and Instrumeritation Drawing 2044, "High Pressure Coolant injection and Reactor Feed Systems." Observations and Findinas The inspectors did not identify anyl findings during this inspectio l 1R09 Inservice Testina Inspection Scope The inspectors observed a test conducted using Attachmonts 1, "HPCI Test Data Sheet," and 2 "HPCI IST Data Sheet," of Procedure 6.HPCI.103, "HPCI IST and 92 Day Test Mode Surveillance Operation," Revision 12.=The inspectors performed an
. evaluation of the system equipment response to the testing to determine the equipment availability and reliabilit ,
b.- Observations and Findinas The inspectors did not identify any findings during this inspectio ' 1R14 ' Nonroutine Plant Evolutions Insoection Scope The inspectors reviewed Licensee Event Reports 50-298/99-01 and 50-298/98-01, focusing on operator performance, to determine if operator errors occurred. For those operator errors identified, the inspectors evaluated whether: (1) the operators followed procedures and training, (2) the licensee identified the errors and initiated corrective action, and (3) the corrective action had been effective in preventing recurrenc !
. Observations and Findinas-The inspectors did not identify any findings during this inspectio l l
l
!
,
p
.
-2-1R22 Surveillances
.
a. Inspection Scoce The inspectors observed the following test and reviewed the completed data packages:
Surveillance Procedure 6.2DG.101, " Diesel Generator 31 Day Operability Test (IST)"
The inspectors evaluated whether operators and maintenance personnel had performed the testing in an adequate manner to verify compliance with the associated Technical
<
Specification surveillance requirements. They also determined if system components met the acceptance criteri b. Observations and Findinas The inspectors did not !dentify any findings during this inspectio R23 : Temoorary Plant Modifications Inspection Scope The inspectors reviewed Temporary Modification PTM-96-33, "FP-P-D, Disabling of Remote Stop Capability." In accordance with the modification documents, maintenance
. personnel had installed a jumper in the diesel-driven fire pump local control cabine Engineers had designed the jumper to disable the circuit that allowed operators to stop the pump from the main control room. The engineers had determined that a fire in the cable spreading room or main control room could spuriously energize the remote stop relay. This could have prevented the operation of the fire pump in response to the postulated fir The inspectors evaluated the documentation to determine if the modification had resulted in a departure from the design basis or the system success criteri i Additionally, the inspectors evaluated the modification to determine if it had resulted in '
any temporary or unrecognized risk change ' Observations and Findinas The inspectors did not identify any findings during this inspectio ,
.
-3- OTHER ACTIVITIES 40A2 Performance Indicator Verification Inspection Scope The inspectors reviewed a sampling of data and records to determine the validity of the following performance indicators:
- Safety System Functional Failures The inspectors reviewed operating logs for the previous year to identify reactor criticality and power changes. The logs also provided indication of prior planning for the power reductions. The inspectors evaluated a sample of licensee event reports to identify safety system failures and determine if they involved functional failure I Observations and Findinas l
The draft Nuclear Energy Institute document, NEl 99-02, " Regulatory Assessment i Performance Indicator Guideline," Revision B, defined the performance indicator,
" Unplanned Power Changes per 7,000 Critical Hours," as:
The number of unplanned changes in reactor power of greater than 20% full-power, per 7000 hours0.081 days <br />1.944 hours <br />0.0116 weeks <br />0.00266 months <br /> of critical operation excluding manual and automatic scram l Unplanned changes in power are defined as changes in reactor power that are initiated less than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> following the discovery of an off normal condition, and that result in, or require a change in power level of greater than 20% full power to resolv During the review of control room logs, the inspectors identified the following three power changes that should have been reported but were not: On May 8,1999, at 8:46 p.m., with the reactor at 100 percent power, Cooper Nuclear Station operators performed partial stroke surveillance testing of main steam isolation valves. Following the test, one of the valves failed to indicate full open, and the relays failed to reset. At 10:36 a.m. on May 9, operators lowered reactor power to approximately 65 percent to troubleshoot the problem with the valv During the performance indicator verification inspection, the inspectors found that the licensee had not reported this as an unplanned power change. Licensee representatives indicated that the engineer responsible for the indicator did not understand the definition of the performance indicator and that management had not reviewed the supporting documentation prior to reporting the indicator dat .
I.
!
l
Following the inspection, operations department managers stated that they had
,
anticipated the failure of the main steam isolation valve relays to reset because l of similar results seen during a test conducted on March 20,1999. As a contingency to the relay failure, plant managers had discussed the possibility of reducing power much more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the reduction. The operations l manager stated that the discussion satisfied the licensee's criteria used to l establish an event as planned. As a result, the licensee did not consider the May l
'
9 power reduction unplanne The inspectors informed the licensee that the May 9,1999, power reduction should have been classified as e i unplanned power change. The NRC does not consider such contingency actions as planned events as defined by the performance indicator. Consequently, the inspectors determined that the May 9 event met the definition of an unplanned power chang . On April 13,1998, the lubricating oil pump for Reactor Feedwater Pump B seized, causing a momentary feedwater pump trip signal and brief reduction of the feedwater pump flow. Operators reduced power to 75 percent for troubleshooting and repair . Also on September 7,1998, operators reduced reactor power to approximately 70 percent to remove a feedwater pump from service as a result of speed control problem Following discussions of these events with licensee representatives, the plant staff initiated Problem Identification Report 4-02841 to address the problem. The inspectors determined that, despite the three additional unplanned power changes, the performance indicator remained green in addition, inspectors identified an Unresolved item to determine what, if any, enforcement action the NRC should take in response to incorrect reporting of Performance Indicator data (50-298/99006-01).
The inspectors did not identify any findings related to the Safety System Functional Failures performance indicato i l
40A3 Event Followup l Insoection Scoce The inspectors reviewed the licensee's actions following a June 4,1999, spill of low-level radioactive condensate demineralizer resin to assess the significanc Observations and Findinas ]
i On June 4,1999, plant operators did a routine backwash of Condensate Demineralizer G. The backwash system's automatic sequencer controlled the evolutio During the evolution, the domineralizer vent valve failed to return to its required closed l
I
r t .
.
.
5-position. Operators did not observe that the valve remained open. The automatic sequencer had closed a common demineralizer vent header valve, preventing a discharge at that tim Later that day, operators performed a backwash of Condensate Demineralizer C. When the automatic sequencer opened the common vent header valve, about 20,000 gallons of water flowed out of the open Demineralizer G vent valve. Water and resin overflowed the backwash tank into the radioactive waste building basement sump. The rate of flow caused the drains to back up onto the radioactive waste building floor. Curbs protected the electrical equipment and tanks in the spill area from rising water levels. The licensee estimated that about 3 to 5 cubic feet of resin and 5,000 gallons of water accumulated on the basement floor. The licensee documented the event in Problem Identification Report 4-02417 and dispositioned the concerns as Significant Condition ,
'
Report 99-040 Plant radiation protection personnel observed that general area radiation levels increased from a maximum of 20 mr/hr to a maximum of 60 mr/hr as a result of the spil Technicians documented radiation levels ranging from 20 to 80 mr/hr in contact with the resin and surveys indicated contamination levels of 250,000 dpm/100 cm2 ,
The inspectors determined that, since no significant radiation exposure nor potential overexposure had occurred, the spill remained within the licensee's area of responsibility for corrective action. It did not require additional NRC involvement (green).
40A5 Exit Meetino Summary The inspectors presented the inspection results to members of the licensee's management at the conclusion of the inspection on July 15,1999. The NRC conducted additional meetings to discuss the findings on August 3 and 5,1999. The licensee acknowledged the findings presented. The licensee did not consider proprietary any material examined during the inspectio _
_
.
.
!
,
l ATTACHMENT PARTIAL LIST OF PERSONS CONTACTED Licensee W. Baruth, Operations Support
- D. Billesbach, Maintenance '
T. Borgan, Operations Supervisor J. Burton, Performance Assessment Manager I T. Chard, Radiation Protection Manager L. Dewhirst, Licensing Engineer P. Donahue, Engineering Support Manager L. Dugger, Acting Manager of Engineering Gupport M. Gillan, Outage Manager J. Long, Nuclear Project Manager S. Minahan, Acting Plant Manager J. Peters, Licensing Secretary B. Rash, Engineering Manager A. Shiever, Operations Manager J. Swailes, Vice-President of Operations ITEMS OPENED, REVIEWED, AND CLOSED Ooened 298/99006-01 URI Inspectors found that the licensee inaccurately reported the number for the Unplanned Power Reductions Performance Indicator (Section 40A2).