ML20212B517

From kanterella
Revision as of 18:33, 21 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-325/86-32 & 50-324/86-33 on 861101-30.No Violations or Deviations Noted
ML20212B517
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/22/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20212B521 List:
References
NUDOCS 8612290266
Download: ML20212B517 (2)


See also: IR 05000324/1986033

Text

'n ,

.% '

2C Y

'

DEC 2,25 -

Docket Nos. 50-325, 50-324 -

License Nos. DPR-71, DPR-62

Carolina Power and Light Company

4

y ATTN: Mr. E. 2. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-325/86-32 AND 50-324/86-33

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. H. Ruland en November 1-30, 1986. The inspection included a review of

activities authorized for your Brunswick facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff identi-

fied in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

ORIGNAL SIGNED BY

8612290266 861222 4 DAVID M. VERRELU

ADOCK 0500 David M. Verrelli, Chief

gDR

, Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

NRC Inspection Report

kccw/

P. W. encl:

Howe, Vice President

Brunswick Nuclear Project

. R. Dietz, Plant General Manager

bec w/ encl: (See page 2)

i f

i

IPo/

_. _. . . ..

r <(

,. ES2 2 5

Carolina Power and Light Company 2

cc w/ enc 1:

. J RC Resident Inspector

Document Control Desk

State of North Carolina

.

_

) , .

7 A_-

L5Mellen:cdg

.h' 0 u

. Fredhckson

12At/86 1 /.c/86

.