ML20207B169

From kanterella
Revision as of 19:33, 27 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-324/86-25 & 50-325/86-24 on 860901-1004 & Notice of Violation
ML20207B169
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 10/31/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20207B173 List:
References
NUDOCS 8611110521
Download: ML20207B169 (2)


See also: IR 05000324/1986025

Text

r

2%f

,% -

g

\

k

.

l

.

OCT 31 1986

Docket Nos. 50-325 and 50-324

License Nos. DPR-71 and DPR-62

Carolipa Power and Light Company

ATTNV Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-325/86-24 AND 50-324/86-25)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

William H. Ruland on September 1 - October 4,1986. The inspection included a

review of activities authorized for your Brunswick facility. At the conclusion

of the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities appeared to violate NRC

requirements. The violation, references to pertinent requirements, and elements

to be included in your response are described in the enclosed Notice of

Violation.

Your attention is invited to an unresolved item identified in the inspection

report. This matter will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Pub lic Document Room.

The responses directed by this letter and its enclosure are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

0611110521 061031

PDR ADOCK 05000324

O PDR

l \h

        *
    ,
                  *
  .       ;,   .
                                                                        OCT 311986
          Carolina Power and Light Company      2
          Should you have any questions concerning this letter, please contact us.
                                                Sincerely,

, mic, BIAL S'C?" "'#

                                                 DAVID M. VEP.RELU

i

                                               David M. Verre111, Chief
                                                Reactor Projects Branch 2
                                               DivisionofReactorProjects
          Enclosures:
          1.     Notice of Violation
          2.     NRC Inspection Report

l

l        Sc w/ enc 1s:
     \/P. W. Howe, Vice President
       / Brunswick Nuclear Project
    VC       R. Dietz, Plant General Manager
      /bcc w/encls:
    V NRC Resident Inspector
         Document Control Desk

,

         State of North Carolina

t i i

         RII                    RII
         LHeken:1b              PFre Irickson
         104/86                 Ig/86
                                                                                   -

}}