Forwards Insp Repts 50-348/88-29 & 50-364/88-29 on 881011- 1110.No Violations or Deviations Noted
ML20196A200
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/25/1988
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
Shared Package
ML20196A205 List:
References
NUDOCS 8812050286
Download: ML20196A200 (2)


See also: IR 05000348/1988029

Text

. .

,

'.

.

-

'.'

- -

NOV 2 5 tM6

&

/j

C/,A'-f

p

6

(!, 4C 'i

Docket Nos. 50-348, 50-344 )

License Nos. NPF-2 and NPF-8

A labema Power Com)any

/ ATTN: Mr. W. G. iairston, III

Senior Vice President-Nuclear

Operations

P. O. Box 2641

Birmingham, AL 35291-0400

Gentleten:

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/88-29 AND 50-364/88-29

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

G. F. Maxwell on October 11 thru November 10, 1988. The inspection included a

revi;w of activities authorized for your Farley facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these at tas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2.D0 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by D. Verre111)

David H, Verrelli Chief

ReactorProjects$ ranch 1

DivisionofReactorProjects

Enclosure-

hRC Inspection Report

cc w/ encl: (See page 2)

ssicoS02E6

acoo 9

o@[,jbe

es roc gg

U<

_ _ _ _ _ . . _ _ - _ _ _ _ _ _

. .

-

. 1 N 0 Y 1 5 1988

.

.

Alabama Power Coepany 2

w/ encl:

M. Guthrie, b ecutive Vice President

. D. Mcdonald Executive Vice President

uf. D. Woodard, Vice President -

M.NuclearGeneration

N. Morey, General Manager -

Nuclear Plant

/J. W. McGowan, Manager Safety Audit

I.andEngineeringReview

Fulrer. Supervisor-Safety

Audit and Engineering Review

State of Alabama

bec w/ encl:

M fC Resident Inspector

4 . Reeves, Project Manager, NRR

ORS Technical Assistant

Docurent Control Oesk

,

an 11/ 15 /ES