ML20196A200
| ML20196A200 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/25/1988 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W ALABAMA POWER CO. |
| Shared Package | |
| ML20196A205 | List: |
| References | |
| NUDOCS 8812050286 | |
| Download: ML20196A200 (2) | |
See also: IR 05000348/1988029
Text
.
.
,
.
'.
-
' . '
C/,A'-f
&
6
NOV 2 5 tM6
/j
-
-
p
(!, 4C 'i
)
Docket Nos. 50-348, 50-344
A labema Power Com)any
/ ATTN:
Mr. W. G.
iairston, III
Senior Vice President-Nuclear
Operations
P. O. Box 2641
Birmingham, AL 35291-0400
Gentleten:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-348/88-29 AND 50-364/88-29
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
G. F. Maxwell on October 11 thru November 10, 1988.
The inspection included a
revi;w of activities authorized for your Farley facility.
At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these at tas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
In accordance with Section 2.D0 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by D. Verre111)
David H, Verrelli Chief
ReactorProjects$ ranch 1
DivisionofReactorProjects
Enclosure-
hRC Inspection Report
cc w/ encl:
(See page 2)
acoo o@[,jbe
9
ssicoS02E6
es
roc
gg
U<
_ _ _ _ _ .
. _ _ - _ _ _ _ _ _
.
.
1
N 0 Y 1 5 1988
-
.
.
.
Alabama Power Coepany
2
w/ encl:
M. Guthrie, b ecutive Vice President
. D. Mcdonald Executive Vice President
uf. D. Woodard, Vice President -
M.NuclearGeneration
N. Morey, General Manager -
Nuclear Plant
/J. W. McGowan, Manager Safety Audit
I.andEngineeringReview
Fulrer. Supervisor-Safety
Audit and Engineering Review
State of Alabama
bec w/ encl:
M fC Resident Inspector
4 . Reeves, Project Manager, NRR
ORS Technical Assistant
Docurent Control Oesk
,
an
11/ 15 /ES