ML20151W361

From kanterella
Revision as of 14:54, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-348/88-08 & 50-364/88-08 on 880311-0410.Violations Noted But Not Cited
ML20151W361
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/28/1988
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20151W365 List:
References
NUDOCS 8805030380
Download: ML20151W361 (2)


See also: IR 05000348/1988008

Text

'

- _

'

.

'

j sh',G>/

..

. .- e q

, .

.

APR 2 8 rygg

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

A1abama Power Company

LATTN: M'.'. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SCBJECT: NRC INSPECTION REPORT NOS. 50-348/88-08 AND 50-364/08-03

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. H. Bradford on March 11 through April 10, 1938. The inspection included a

review of activities authorized for your Farley facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. However, because all of the criterie for categorization of

licensee-identified violations were met, the violation is not being cited. The

details pertaining to the licensee-identified violation are described in the

enclosed Inspecticn Report.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed iri che NRC Public Document Roon.

Should you have any questions concerning this letter, please contact us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects Cranch 1

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc w/ enc 1: (See page 2)

8805030380 880428 I ig

l

PDR ADOCK 05000348

Q DCD

26 c/

'

r ,

i * *

.

,

.

, .

bkMf6!T,(g

Alabama Power Company 2

cc w/ enc 1:

491 M. Guthrie, Executive Vice President

4. D. Woodard, raneral Manager -

Nuclear Plant

I G. Hairston, III, Vice President -

Nuclear Support

vJ'. W. McGowan, Manager-Safety Audit

jnd Engineering Review

g. Fulmer, Suoervisor-Safety

Audit and Engineering Review

bcp w/ enc 1:

+(RC Resident Inspector

DR

f.STechnicalAssistar.t

Reeves, Project Manager, NRR

Document Control Desk

State of Alabama

.

S

.h

HDance:tj DVerrelli

04/p)/88 04/t J/88

.