Text
'
-
_
j sh',G>/
'
'
q
.
.
.-
e
..
,
.
.
APR 2 8 rygg
Docket Nos. 50-348, 50-364
A1abama Power Company
LATTN:
M'.'. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291-0400
Gentlemen:
SCBJECT:
NRC INSPECTION REPORT NOS. 50-348/88-08 AND 50-364/08-03
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
W. H. Bradford on March 11 through April 10, 1938. The inspection included a
review of activities authorized for your Farley facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements. However, because all of the criterie for categorization of
licensee-identified violations were met, the violation is not being cited. The
details pertaining to the licensee-identified violation are described in the
enclosed Inspecticn Report.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed iri che NRC Public Document Roon.
Should you have any questions concerning this letter, please contact us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects Cranch 1
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/ enc 1:
(See page 2)
8805030380 880428
I ig
ADOCK 05000348
l
Q
26 c/
r
'
,
i
.
,
.
.
,
bkMf6!T,(g
Alabama Power Company
2
cc w/ enc 1:
491 M. Guthrie, Executive Vice President
4. D. Woodard, raneral Manager -
Nuclear Plant
I G. Hairston, III, Vice President -
Nuclear Support
vJ'. W. McGowan, Manager-Safety Audit
jnd Engineering Review
g. Fulmer, Suoervisor-Safety
Audit and Engineering Review
bcp w/ enc 1:
+(RC Resident Inspector
f.STechnicalAssistar.t
DR
Reeves, Project Manager, NRR
Document Control Desk
State of Alabama
.
.h
S
HDance:tj
DVerrelli
04/ J/88
04/p)/88
t
.