ML20153B505

From kanterella
Revision as of 06:28, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Confirms 880707 Enforcement Conference at Region II Ofc to Discuss Nonconservatism Recently Discovered in Instrument Settings Associated W/Hpci/Rcic High Steam Line Flow Isolation,Per 880615 Telcon
ML20153B505
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/24/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8807130095
Download: ML20153B505 (1)


Text

x.  % ,

^

4 JUN 2 41988 Carolina Power and Light Company ATTN: Mr. E. E. Utley.

Senior Executive Vice President Power Supply and Engineering and Construction P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

ENFORCEMENT CONFERENCE - BRUNSWICK UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 This- confirms the telephone conversation between C ~ R. Dietz of your staff and P. E. Fredrickson of my staff on June 15, 1988, concerning an Enforcement Conference to be conducted at the Region II Office, Atlanta, Georgia on July 7, 1988, at 9:30 a.m. We requested this meeting to discuss the non-conservatism recently discovered in the instrument settings associated with High Pressure Coolant Injection (HPCI)/ Reactor Core Isolation Cooling (RCIC) high steam line flow isolation.

Should.you-have any questions regarding these arrangements, we will be pleased to discuss them.

Sincerely, J. Nelson Grace Regional Administrator cc: P. W. Howe, Vice President i Brunswick Nuclear Project C. R. Dietz, Plant General Manager bec: NRC Resident Inspector DRS, Technical Assistant Document Control Desk j State of North Carolina RII RII RI RI BCarroll:sh PFr d ekson RI'G"(

DVerrelli e

AGi on0 R

,i.Reye b"en ns cgg/

06//p/88 6/p /88 6/ u /88 6/2 /88. 6/go/88 6/al/88 Og73hh N '

n

-_ _ [f cI