Notice of Violation from Insp on 921102-06.Violation Noted:Licensee Failed to Survey Package Containing Radioactive Matl within 3 or 18 H of Receipt
ML20125D878
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/03/1992
From: Pederson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20125D866 List:
References
50-483-92-25, NUDOCS 9212160078
Download: ML20125D878 (1)


Text

.- ------ .-. . -. - - - - - - -

r F[

NOTICE Of VIOLATION Union Electric Company Docket No. 50-483 Callaway Nuclear Power Station License No. NPF-30 During an NRC inspection conducted on November 2 through 6,1992, a violation '

of NRC requirements was identified. in accordance with the " General Statement of Policy and Procedure for NkC Enforcement Actions, "10 CFR 2, Appendix C, the violation is listed below:

Technical Specification 6.8.1 requires that written procedures be established, implemented and maintained. Callaway Health Physics Technical Procedures HTP-ZZ-02002 and HTP-ZZ-02004 require that upon receipt of a package containing radioactive material, including the receipt of radioactive sources, Health Physics shall perform a survey within three hours if the package was received during normal working hours or within eighteen hours if received after normal working hours.

Contrary to the above, on July 22, 1992 and September 9, 1992, the licensee failed to survey a package containing radioactive material within three or eightew hours of receipt.

This is a Severity Level V violation (Supplement IV).

Pursuant to the provisions of 10 CFR 2.201, Union Electric Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: document Control Desk, Washington, D.C. 20555 with a. copy to the Regional Administrator, Region lil, U.S. Nuclear Regulatory Commission, 799 Roosevelt Road, Glen Ellyn, Illinois 60137, and a copy to the NRC Resident Inspector at the Callaway Nuclear Power Station within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to the Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if-contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the-date when full compliance will be achieved. If an adequate reply is not received within the time specified in this Notice, a demand for information may be issued to show cause why the license should not be modified, suspended, or revoked, or why such action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.

Dated at Glen Ellyn, Illinois this 3"' day of December 1992 C.ynthia D. Pederson, Chief Mu.

' Reactor Support Programs Branch 9212160078 921203 PDR ADOCK 05000483