ML20126E193

From kanterella
Revision as of 03:30, 12 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to FOIA Request for Five Categories of Documents. Forwards Documents Listed on App.Documents Also Available in PDR
ML20126E193
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/11/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Devine T, Varricchio M
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20126E194 List:
References
FOIA-85-80 NUDOCS 8506150319
Download: ML20126E193 (3)


Text

f

/ ),, UNITED STATES -n I

r.

g j

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20666 7M'h h

%,4... /

MAR 111985 Mr. Tom Devine Ms. Michele Varricchio Government Accountability Project 1555 Connecticut Avenue, NW, Suite 202 IN RESPONSE REFER Washington, DC 20036 TO F01A-85-80

Dear Mr. Devine and Ms. Varricchio:

This is in response to your letter dated February 1, 1985, in which you requested, pursuant to the Freedom of Infonnation Act (FOIA), copies of all agency records relevant to and/or generated in connection with the five reports and one letter specifically described in your request.

The requested documents, listed on the enclosed appendix, are available intheNRCPublicDocumentRoom(PDR),1717HStreet,NW, Washington,DC, for your inspection and copying. Some of the records will be filed in PDR folder F01A-85-80 under your name. Other records, noted by asterisks on the appendix, are filed in other PDR folders and may be retrieved by the accession numbers indicated beside the document description.

Sincerely, J. M. Felton, Director Division of Rules and Records Office of Administration

Enclosure:

As stated g61g9850311 DEVINEBS-90 PDN

p Re:F01A-85-80 APPENDIX

1. 3/29/83 Licensee Report per 10 CFR 50.55(e). (1 page)
  • 2. 4/8/83 Letter to Rosenthal, Edles, Gotchy from Baxter on failures in qualit Callaway (5 pages)yAccession assuranceNo./ 8304120605.

quality control at ,

PDR/A DOCK /50-483G

  • 3. 4/28/83 Letter to Rosenthal Edles, Gotchy from Baxter on=

potential deficiency in testing of candidates for Quality Control inspector certification at Callaway (8 pages). Accession No. 8305030467.

PDR/A DOCK /50-483G

4. 6/30/83 Letter to Schnell from Kno June 17, 1983 (11 pages.) p on inspection of June 14 thru
  • 5. 4/6/84 Letter to Keppler from Schnell,

Subject:

Forwards SALP Report 50-483/84-08 for October 1982-November 1983 (2pages)AccessionNo. 8404120271 PDR/ADOCK/50-483Q

  • 6. 4/6/84 Report:

Subject:

SALP Report 50-483/84-08 for October 1982 - November 1983(29 pages) Accession No. 8404120275 PDR/ADOCK/50-483Q

7. 9/13/84 Letter te Schnell from Warnick on inspection of June 3 thru June 27, 1984 (23 pages).
8. 12/10/84 Draft letter to Garde from Keppler (3 pages)
9. 12/10/84 Draft letter to Garde from Keppler, with handwritten coments (3 pages).
10. 12/26/84 Draft letter to Garde from Keppler (2 pages).

j 11. 12/28/84 Draft letter to Garde from Keppler, with typo / spelling errorsnoted(3pages).

I I

a

r.:

. Re: FOIA-85-80 APPENDIX (Continued)

12. 1/2/85 Draft letter to Garde from Keppler (3 pages).
13. 1/2/85 Draft letter by Region III to Garde from Keppler (3 pages).
14. 1/2/85 Draft letter (by Lieberman) to Garde from Keppler (4 pages).
15. 1/8/85 Chart: Re Callaway-Page 16-50.55(gion III Tracking System Updates:E) & Part 21 File-Com
16. 1/11/85 Letter to Garde from Keppler (2 pages).
  • NOTE: These documents are already located in the NRC Public Document Room.

i i

i 1 -

L '