|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K1051999-10-19019 October 1999 Ack Receipt of Ltr Dtd 990707,which Transmitted Rev 29 to Callaway Plant Physical Security Plan,Under Provisions of 10CFR50.54(p).Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required 05000482/LER-1999-002, Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl 05000482/LER-1994-014, Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl1999-10-15015 October 1999 Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl ML20217F7481999-10-14014 October 1999 Informs That Based on Approval of Core Assessment Damage Guidance in WCAP-14696,rev 1 for Westinghouse Nuclear Power Plants,Licensee May Use WCAP-14696,rev 1 at Wolf Creek Generating Station ML20217G2071999-10-14014 October 1999 Forwards Insp Rept 50-483/99-10 on 990913-16.No Violations Noted.Insp Was to Review Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise ML20217F8701999-10-13013 October 1999 Provides Summary of Meeting on 991007 with Representatives of Wolf Creek Nuclear Station in Burlington,Kansas Re Status of Licensee Radiation Protection Program.List of Meeting Attendees & Licensee Presentation Encl ML20217C1721999-10-0707 October 1999 Forwards Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted.Purpose of Insp to Perform Routine Operational Status Insp of Emergency Preparedness Program & to Resolve Questions Re Revised Emergency Plan ML20217B5901999-10-0505 October 1999 Informs That Staff Concludes That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Callaway Plant,Unit 1 ML20217B5711999-10-0505 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & Uec Responses for Callaway NPP Unit 1 ,990224 & 990628.Informs That Staff Reviewed Responses & Concluded That All Requested Info for GL 98-01 Provided ML20217A4881999-09-29029 September 1999 Forwards Changes to Plant Data Point Library,Iaw 10CFR50,App E,Section VI.3.a.ERDS Point Affected Is RDS0001 ML20216H9291999-09-29029 September 1999 Informs That Licensee Responses to GL 97-06, Degradation of Steam Generator Internals Acceptable & Did Not Identify Any New Concerns with Condition of SG Intervals at Plant ML20212G1681999-09-24024 September 1999 Notifies NRC of Change in Status of Licensed Individual at Plant,Per 10CFR50.74.RL Acree Holds License OP-42654 at Plant,But Has Been Permanently Reassigned from Position for Which Plant Has Certified Need for RO License ML20216F9591999-09-22022 September 1999 Forwards Withdrawal of Amend Request Re Ultimate Heat Sink Temp for Wolf Creek Generating Station ML20212G0221999-09-22022 September 1999 Forwards Insp Rept 50-483/99-11 on 990812-20.No Violations Noted.Team Found,Weakness in flow-accelerated Corrosion Monitoring Program Resulted in No Previous Insp of Pipe Segment Which Failed ML20212G5641999-09-20020 September 1999 Forwards Insp Rept 50-482/99-13 on 990725-0904.Three Violations Being Treated as Noncited Violations 05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I1999-09-17017 September 1999 Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I ML20212D9381999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of WCGS on 990818.Areas of EP & Engineering Warranted Increase in NRC Action.Nrc Plan to Conduct Add Insp Beyond Core Insp Program Over Next 7 Months to Address Listed Questions 05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util1999-09-16016 September 1999 Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util ML20212D9341999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Callaway Plant.In Area of Ep,C/As Taken in Response to Problems Identified During Previous Exercises Warrant More in-dept Review.Details of Insp Plan Through March 2000 Encl ML20217D5791999-09-15015 September 1999 Provides Formal Documentation of Reviews & Discussions Re Technical Ltr Rept for Proprietary Info.Review of Ltr Was Discussed in Telcon & Via e-mail Messages. Summary of Telcons as Documented on 990708,included ML20212C9211999-09-15015 September 1999 Forwards NRC Form 536, Operating Licensing Examination Data, in Response to NRC Administrative Ltr 99-03 05000482/LER-1999-006, Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl1999-09-15015 September 1999 Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl ML20216F1641999-09-14014 September 1999 Forwards Insp Rept 50-482/99-12 on 990816-20.No Violation Noted.Determined That Solid Radwaste Mgt & Radioactive Matls Transportation Programs Were Properly Implemented ML20212A4921999-09-13013 September 1999 Forwards Insp Rept 50-483/99-08 on 990725-0904.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212B1521999-09-10010 September 1999 Forwards Insp Rept 50-483/99-07 on 990809-13.No Violations Noted.Inspectors Used Annual Licensed Operator Requalification Exams to Assess Licensed Operator Performance ML20212A4701999-09-10010 September 1999 Rssponds to NRC 990709 RAI Re Util Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection Iwe. Acceptance Criteria for Liner Plate Pressure Boundary Thickness Will Be Limited to 10% Nominal Thinning 05000482/LER-1999-009, Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER1999-09-10010 September 1999 Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER ML20212A5651999-09-10010 September 1999 Informs of Completion of Review of & Encl Objectives for Wolf Creek Generating Station 1999 Emergency Preparedness Exercise Scheduled for 991117.Determined Exercise Objectives Appropriate to Meet EP Requirements ML20211M7151999-09-0303 September 1999 Forwards Changes to Wolf Creek Generating Station Data Point Library.Emergency Response Data Sys Points Affected Are EJL0007 & EJL0008 05000482/LER-1999-008, Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER1999-09-0303 September 1999 Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER ML20211K8301999-09-0202 September 1999 Forwards marked-up TS Page Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band,Per 990708 Application to Amend License NPF-42 ML20211N0081999-09-0202 September 1999 Informs That NRC Staff Has Reviewed Submittals & Concluded Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves ML20211N0321999-09-0202 September 1999 Forwards SE Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20211K1941999-08-31031 August 1999 Forwards Rev 31 to WCGS Physical Security Plan,Safeguards Contingency Plan & Training & Qualification Plan,Iaw 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20211H1491999-08-26026 August 1999 Forwards Insp Rept 50-482/99-16 on 990809-13.No Violations Noted.Insp Focused on Low as Is Reasonably Achievable Program,Training Program for Contract Radiation Protection Personnel & Radiation Protection QA Program ML20211A8581999-08-18018 August 1999 Forwards Insp Rept 50-482/99-08 on 990316-0724.One Violation Being Treated as Noncited Violation ML20211B0241999-08-18018 August 1999 Ack Receipt of Ltr Dtd 990714,transmitting Scenario for Licensee Upcoming Biennial Exercise.Based on Review,Nrc Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20211G2201999-08-17017 August 1999 Forwards Exam Rept 50-482/99-301 on 990726-29.Exam Evaluated Six Applicants for SO Licenses & Three Applicants for RO Licenses ML20210U0991999-08-13013 August 1999 Forwards Insp Rept 50-482/99-11 on 990712-16.No Violations Noted.Insp Was to Review Radiological Environ Monitoring Program ML20210U9751999-08-13013 August 1999 Informs That Licensee Identified That Answer Key for One Question on 990720 Written Exam & Event Classification for on Job Performance Measure Required Mod.Description & Justification for Proposed Mod,Including Technical Ref,Encl ML20210T9121999-08-13013 August 1999 Forwards Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20210R7241999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data Rept for Callaway Nuclear Plant for 990101-990630,IAW 10CFR26.71(d) ML20210R5621999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Revised Repts for Apr,May & June 1999,correcting Number of Hours Reactor Critical,Encl ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ULNRC-04085, Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power1999-08-11011 August 1999 Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power ML20210P0371999-08-10010 August 1999 Forwards SE Granting Licensee 980710 Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code for Second 10-year Interval ISI at Plant,Unit 1 ML20210P7491999-08-0909 August 1999 Ack Receipt of ,Which Transmitted Wolf Creek Radiological Emergency Response Plan 06-002,Rev 0,under Provisions of 10CFR50,App E,Section V ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210N0061999-08-0303 August 1999 Forwards Response to NRC 990401 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Motor-Operated Gate Valves ULNRC-04079, Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal 1999-09-03
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARIA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)1989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20247R3361989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) DD-89-04, Advises That Time for Commission to Review Director'S Decision DD-89-04 Expired.Commission Declined Review. Decision Became Final Agency Action on 890721.W/Certificate of Svc.Served on 8908081989-08-0707 August 1989 Advises That Time for Commission to Review Director'S Decision DD-89-04 Expired.Commission Declined Review. Decision Became Final Agency Action on 890721.W/Certificate of Svc.Served on 890808 ML20247F0481989-07-25025 July 1989 Partial Response to FOIA Request for Records.App L Record Available in Pdr.App M Records Partially Withheld Ref (FOIA Exemption 7).App N Record Provided to Requestor But Not Made Publicly Available at This Time ML20245B3881989-06-15015 June 1989 Responds to Re Flow & Pressure Drop Calculations for RWCU & Feedwater & Condensate Sample Panels.Util Actions Do Not Have Adverse Impact on Nuclear Reactor Safety to Extent That Protection of Safety of Environ Affected ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20245J9461989-04-25025 April 1989 Partial Response to FOIA Request for Records.App B & C Records Available in Pdr.App D Documents Provided to Requestor But Not Publically Available Since Related to Oia Investigation Re Allegations by Client ML20245B4051989-04-14014 April 1989 Responds to 881004 & 890119,23 & 0310 Ltrs Re Status of Investigation of Concerns About Corrosion Inhibitors & Design of Sampling Sys.Low Velocity of Liquid in Hotwell Sampling Considered Satisfactory ML20247C9571989-03-23023 March 1989 Forwards Fr Notice Denying 890120 Petition for Immediate Action to Suspend OL & Reopen Ofc of Investigations Case 4-86-004 ML20246N1521989-02-22022 February 1989 Responds to Re Amended Indemnity Agreement W/ Utils to Permit Storage of Spent Nuclear Fuel.Fr Notice Encl ML20206D9201988-11-0909 November 1988 Responds to Re NRC 880331 Response to Questions Raised Concerning Conditions at Plants & Recipient Proposal to Station Senior Operator in Control Room at All Nuclear Plants to Oversee Plant Operations ML20195G2121988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App D Document & Releasable Portions of Documents E/1 Through E/3. App D & Releasable Portions of Documents E/4 Through E/6 Available in Pdr.Portions Withheld (Ref FOIA Exemption 5) ML20195G5361988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App a Documents.App a Documents Also Available in PDR ML20206D8871988-11-0808 November 1988 Responds to 881015 Postcard Recommending Keeping Seabrook & Pilgrim Facilities Closed & Question Re Nuclear Waste Disposal.Two Levels of Waste for Commercial Nuclear Power Plants Considered NUREG/CR-5009, Forwards NUREG/CR-5009, Assessment of Use of Extended Burnup Fuel in Lwrs. Rept Concludes That Environmentally, Burnup Increase Would Have No Significant Impact Over That of Normal Burnup.W/O Encl1988-10-26026 October 1988 Forwards NUREG/CR-5009, Assessment of Use of Extended Burnup Fuel in Lwrs. Rept Concludes That Environmentally, Burnup Increase Would Have No Significant Impact Over That of Normal Burnup.W/O Encl ML20205S3841988-10-13013 October 1988 Partial Response to FOIA Request for Documents.App D,E & F Records Encl & Available in Pdr.App F Records Partially Withheld (Ref FOIA Exemption 6) DD-88-14, Advises That Time for Commission to Review Decision DD-88-14 Expired.Commission Declined Review.Decision Became Final Agency Action on 880916.Served on 8809261988-09-23023 September 1988 Advises That Time for Commission to Review Decision DD-88-14 Expired.Commission Declined Review.Decision Became Final Agency Action on 880916.Served on 880926 ML20154D3891988-08-22022 August 1988 Partial Response to FOIA Request for Documents.Forwards App T Documents.Apps & T Documents Available in PDR ML20151Y3431988-08-22022 August 1988 Responds to 850515 Submittal & 850531 Amend,On Behalf of Nuclear Awareness Network Requesting Enforcement Action Concerning Facility.Request Denied for Reasons Stated in Encl Director'S Decision Under 10CFR2.206 ML20245D6581988-08-0404 August 1988 Discusses to Congressman Hastert Re Concern That Maint & Operations Employees of Listed Nuclear Power Plants in Vicinity of Seneca,Il Working Excessive Hrs ML20206E0051988-07-27027 July 1988 Responds to Enclosing Prior Correspondence W/Nrc Re Conditions at Ref Plants & 10CFR50.54(x) & (Y).Issues Raised Will Be Given Wide Dissemination in Fr & Careful Consideration by NRC ML20207D1121988-07-0505 July 1988 Partial Response to FOIA Request for Documents.Forwards App M Documents.App L Documents Maintained in Pdr.Apps N & O Documents Partially & Totally Withheld,Respectively (Ref FOIA Exemption 5) ML20195F8041988-06-15015 June 1988 First Partial Response to FOIA Request for Documents. Forwards Apps B & C Documents.Documents Available in Pdr.App a Documents Also Available in Pdr.Apps D Through G Documents Withheld (Ref FOIA Exemption 5).Releasable Portion Encl ML20155K0211988-06-13013 June 1988 Partial Response to FOIA Request for Documents.Forwards App D Documents.App C Documents Available in Pdr.App E Documents Completely Withheld (Ref FOIA Exemption 5) ML20151Z5571988-04-28028 April 1988 Responds to FOIA Request for Copies of Quality First Program Files at Plant.Document Listed Under App Available in Pdr. Remaining Records Withheld (Ref FOIA Exemption 6) ML20151Y4681988-04-15015 April 1988 Partial Response to FOIA Request for Documents Re Event Involving Problems W/Msiv.App a & B Documents Available in Pdr.App B Documents Also Encl ML20151C6641988-04-0404 April 1988 Partial Response to FOIA Request for Documents Re Info Assessment Team Notification & Alleged Valve Tampering. App a Documents Available in Pdr.Forwards App B Documents. App B Documents Also Available in PDR ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20150C1731988-03-14014 March 1988 Final Response to FOIA Request for Documents Re Investigation of Util Alleged Matl False Statement.App A/11 Document in Pdr.Remaining App a Documents Partially & Entirely Withheld (Ref FOIA Exemptions 6 & 7) ML20150B9051988-03-14014 March 1988 Final Response to FOIA Request for Documents.Ofc of Investigations Case 4-86-004 Addressed in Response to Previous FOIA Request FOIA-87-800.Response to That Request Available in PDR & at Listed Lpdrs IA-87-811, Final Response to FOIA Request for Documents.Ofc of Investigations Case 4-86-004 Addressed in Response to Previous FOIA Request FOIA-87-800.Response to That Request Available in PDR & at Listed Lpdrs1988-03-14014 March 1988 Final Response to FOIA Request for Documents.Ofc of Investigations Case 4-86-004 Addressed in Response to Previous FOIA Request FOIA-87-800.Response to That Request Available in PDR & at Listed Lpdrs ML20149H8811988-02-18018 February 1988 Partial Response to FOIA Request for Documents.Forwards App a Documents.Documents Also Available in PDR ML20149G0731988-02-10010 February 1988 Responds to Re Announced Reorganization of NRC at TMI-2.NRC Personnel Stationed at Site,Region I & NRC Headquaters Will Continue to Provide Effective Regulatory Oversight of Cleanup Activities ML20195K2931988-01-29029 January 1988 Final Response to FOIA Request for Event Repts 10646 & 10691,dtd 871111 & 871116,respectively.Records Identified in App C Available in PDR & Forwarded IA-87-827, Final Response to FOIA Request for Event Repts 10646 & 10691,dtd 871111 & 871116,respectively.Records Identified in App C Available in PDR & Forwarded1988-01-29029 January 1988 Final Response to FOIA Request for Event Repts 10646 & 10691,dtd 871111 & 871116,respectively.Records Identified in App C Available in PDR & Forwarded ML20148E8681988-01-21021 January 1988 Final Response to FOIA Request for Info Re Facility Allegations.Forwards App B Documents.App A,B & C Documents Available in Pdr.App C Documents Partially Withheld (Ref FOIA Exemptions 6 & 7) ML20147E6621988-01-19019 January 1988 Partial Response to FOIA Request.App G Documents Already Available in Pdr.App H Documents,Re INPO Accreditation Training,Encl & Available in PDR ML20148D0981988-01-15015 January 1988 Responds to Requesting When Response to Gap 880515 2.206 Petition,Amended on 850531,may Be Expected. Response to Petition Scheduled to Be Completed by 880315 ML20147C3831988-01-14014 January 1988 Partial Response to FOIA Request for Documents Re Plant. Forwards App B Documents.Apps a & B Documents Available in PDR ML20147C0281988-01-12012 January 1988 Final Response to FOIA Request for Documents Re Safeteam Program.Forwards App I & J Documents.App H & I Documents Available in Pdr.Other Records Available in Pdr.App J Documents Partially Withheld (Ref FOIA Exemption 6) ML20147D4821988-01-0606 January 1988 Partial Response to FOIA Request for Documents.Forwards App B Documents.Documents Also Available in Pdr.Portions of App B Documents Withheld (Ref FOIA Exemptions 6 & 7) ML20237C1891987-12-16016 December 1987 Ack Receipt of 871112 Petition Requesting That NRC Institute Investigation to Determine Whether Security Being Satisfactorily Maintained at Facility to Protect Public from Exposure to Radiation,Per 10CFR2.206.Notice Encl ML20236V7511987-12-0202 December 1987 Partial Response to FOIA Request for All NRC Records & Info Re Petition for Issuance of Show Cause Order.Forwards App N Documents.App M & N Documents Available in Pdr.Portions of App N Documents Deleted (Ref FOIA Exemption 6) ML20236V5241987-11-18018 November 1987 Forwards 870806 SALP Rept,In Response to Question Re Performance of Plant ML20236L6761987-11-0909 November 1987 Ninth Partial Response to FOIA Request for Records,Including Notes of Interview of K Mcmahon.Forwards App K Documents. App K & L Documents Partially & Completely Withheld (Ref FOIA Exemptions 6 & 7,respectively) ML20245C4051987-10-29029 October 1987 Final Response to FOIA Request for Records.App a & B Documents Available in Pdr.App a Documents Encl ML20236D4491987-10-23023 October 1987 Partial Response to FOIA Request for Documents,Including Rd Martin 850716 Memo Re Allegation Processing Programs.Encl App E & F Documents in Pdr.App F & G Documents Partially & Completely Withheld (Ref FOIA Exemptions 5 & 6) ML20236D1691987-10-21021 October 1987 Responds to Re Replacement of Fuel Rods W/Filler Rods & Vantage-5 Fuel for Cycle 3 Operation at Facility.Encl Safety Evaluation Discusses Safety Considerations That Were Evaluated Before Approving Util Application ML20235W2571987-10-13013 October 1987 Final Response to FOIA Request for Documents Re Plant. Forwards Documents Listed in Apps M & N.Apps M & N Documents Also Available in Pdr.App O Documents Partially Withheld Ref (FOIA Exemptions 6 & 7) 1989-09-26
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217K1051999-10-19019 October 1999 Ack Receipt of Ltr Dtd 990707,which Transmitted Rev 29 to Callaway Plant Physical Security Plan,Under Provisions of 10CFR50.54(p).Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML20217F7481999-10-14014 October 1999 Informs That Based on Approval of Core Assessment Damage Guidance in WCAP-14696,rev 1 for Westinghouse Nuclear Power Plants,Licensee May Use WCAP-14696,rev 1 at Wolf Creek Generating Station ML20217G2071999-10-14014 October 1999 Forwards Insp Rept 50-483/99-10 on 990913-16.No Violations Noted.Insp Was to Review Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise ML20217F8701999-10-13013 October 1999 Provides Summary of Meeting on 991007 with Representatives of Wolf Creek Nuclear Station in Burlington,Kansas Re Status of Licensee Radiation Protection Program.List of Meeting Attendees & Licensee Presentation Encl ML20217C1721999-10-0707 October 1999 Forwards Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted.Purpose of Insp to Perform Routine Operational Status Insp of Emergency Preparedness Program & to Resolve Questions Re Revised Emergency Plan ML20217B5711999-10-0505 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & Uec Responses for Callaway NPP Unit 1 ,990224 & 990628.Informs That Staff Reviewed Responses & Concluded That All Requested Info for GL 98-01 Provided ML20217B5901999-10-0505 October 1999 Informs That Staff Concludes That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Callaway Plant,Unit 1 ML20216H9291999-09-29029 September 1999 Informs That Licensee Responses to GL 97-06, Degradation of Steam Generator Internals Acceptable & Did Not Identify Any New Concerns with Condition of SG Intervals at Plant ML20212G0221999-09-22022 September 1999 Forwards Insp Rept 50-483/99-11 on 990812-20.No Violations Noted.Team Found,Weakness in flow-accelerated Corrosion Monitoring Program Resulted in No Previous Insp of Pipe Segment Which Failed ML20216F9591999-09-22022 September 1999 Forwards Withdrawal of Amend Request Re Ultimate Heat Sink Temp for Wolf Creek Generating Station ML20212G5641999-09-20020 September 1999 Forwards Insp Rept 50-482/99-13 on 990725-0904.Three Violations Being Treated as Noncited Violations ML20212D9341999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Callaway Plant.In Area of Ep,C/As Taken in Response to Problems Identified During Previous Exercises Warrant More in-dept Review.Details of Insp Plan Through March 2000 Encl ML20212D9381999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of WCGS on 990818.Areas of EP & Engineering Warranted Increase in NRC Action.Nrc Plan to Conduct Add Insp Beyond Core Insp Program Over Next 7 Months to Address Listed Questions ML20216F1641999-09-14014 September 1999 Forwards Insp Rept 50-482/99-12 on 990816-20.No Violation Noted.Determined That Solid Radwaste Mgt & Radioactive Matls Transportation Programs Were Properly Implemented ML20212A4921999-09-13013 September 1999 Forwards Insp Rept 50-483/99-08 on 990725-0904.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212A5651999-09-10010 September 1999 Informs of Completion of Review of & Encl Objectives for Wolf Creek Generating Station 1999 Emergency Preparedness Exercise Scheduled for 991117.Determined Exercise Objectives Appropriate to Meet EP Requirements ML20212B1521999-09-10010 September 1999 Forwards Insp Rept 50-483/99-07 on 990809-13.No Violations Noted.Inspectors Used Annual Licensed Operator Requalification Exams to Assess Licensed Operator Performance ML20211N0081999-09-0202 September 1999 Informs That NRC Staff Has Reviewed Submittals & Concluded Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves ML20211N0321999-09-0202 September 1999 Forwards SE Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20211H1491999-08-26026 August 1999 Forwards Insp Rept 50-482/99-16 on 990809-13.No Violations Noted.Insp Focused on Low as Is Reasonably Achievable Program,Training Program for Contract Radiation Protection Personnel & Radiation Protection QA Program ML20211B0241999-08-18018 August 1999 Ack Receipt of Ltr Dtd 990714,transmitting Scenario for Licensee Upcoming Biennial Exercise.Based on Review,Nrc Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20211A8581999-08-18018 August 1999 Forwards Insp Rept 50-482/99-08 on 990316-0724.One Violation Being Treated as Noncited Violation ML20211G2201999-08-17017 August 1999 Forwards Exam Rept 50-482/99-301 on 990726-29.Exam Evaluated Six Applicants for SO Licenses & Three Applicants for RO Licenses ML20210T9121999-08-13013 August 1999 Forwards Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20210U0991999-08-13013 August 1999 Forwards Insp Rept 50-482/99-11 on 990712-16.No Violations Noted.Insp Was to Review Radiological Environ Monitoring Program ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P0371999-08-10010 August 1999 Forwards SE Granting Licensee 980710 Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code for Second 10-year Interval ISI at Plant,Unit 1 ML20210P7491999-08-0909 August 1999 Ack Receipt of ,Which Transmitted Wolf Creek Radiological Emergency Response Plan 06-002,Rev 0,under Provisions of 10CFR50,App E,Section V ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6381999-07-30030 July 1999 Forwards SE Accepting Relief Request for Approval for Use of Alternate Exam Requirement for Plant Inservice Insp Program ML20210B8191999-07-20020 July 1999 Ack Receipt of ,Which Transmitted Wolf Creek EP Implementing Procedure 06-005,Rev 1.Implementation of Changes Will Be Subj to Insp to Confirm That Changes Does Not Decrease Effectiveness of EP ML20210B5611999-07-20020 July 1999 Forwards Review of Ltr & Encl Objectives for Plant,Unit 1,1999 Emergency Plan Exercise Scheduled for 990914 ML20210B4021999-07-19019 July 1999 Ack Receipt of Facility Emergency Plan Implementing Procedure EIP-ZZ-00101, Classification of Emergencies, Rev 23,issued on 990513,under Provisions of 10CFR50,App E, Section V ML20210B4401999-07-19019 July 1999 Ack Receipt of Revs to Facility Radiological Emergency Response Plan,Chapters 8.0 & 4.0,issued Respectively on 990512-14,under Provisions of 10CFR50,App E,Section V ML20209H5411999-07-15015 July 1999 Forwards Insp Rept 50-482/99-07 on 990614-18.No Violations Noted.Insp Focused on Radiation Program During Normal Operating Conditions ML20209E3581999-07-12012 July 1999 Discusses Util 980925 Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Wolf Creek Generating Station ML20209E5591999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.TAC MA0531 Closed ML20196K0501999-07-0202 July 1999 Forwards Insp Rept 50-482/99-06 on 990502-0612.Three Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20196J9501999-07-0202 July 1999 Ack Receipt of Plant Ep,Rev 22,received on 981207 & Submitted Under Provision of 10CFR50,App E,Section V.Changes Does Not Decrease Effectiveness of EP & Continues to Meet Stds of 10CFR50.47(b).NRC Approval Not Required ML20209A7461999-06-29029 June 1999 Informs of Changes in Project Mgt Staff Assigned to Wcgs. Effective 990628,J Donohew Will Assume PM Responsibilities ML20196H2521999-06-25025 June 1999 Forwards Insp Rept 50-483/99-05 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20196F8101999-06-25025 June 1999 Informs That J Donohew Will Assume Project Manager Responsibilities,Effective 990621 ML20196F8181999-06-24024 June 1999 Forwards RAI Re 990111 Request for Relief from Certain ASME Code ISI Requirements for Containment Liners.Response Requested within 30 Days from Date of Agreement IR 05000483/19990041999-06-18018 June 1999 Refers to GL 96-05 Issued by NRC on 960918,UE Responses & 970313 & NRC Insp Rept 50-483/99-04,dtd 990427. Forwards Request for Addl Info Re GL 96-05 Program at Callaway Plant,Unit 1 ML20195H0971999-06-14014 June 1999 Discusses Une 990407 Request That Proprietary Document Entitled, Thermal Stability Assessment - Electrosleeved Tubes, Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20207H3751999-06-14014 June 1999 Discusses 990407 Une Request That Proprietary Version of Document Entitled, Evaluation of Severe Accident Simulation, Dtd April 1999,be Withheld from Public Disclosure.Determined Info Proprietary & Will Be Withheld ML20195G3451999-06-0909 June 1999 Ack Receipt of Ltr Dtd 990105,which Transmitted Wolf Creek Emergency Plan Form Apf 06-002-01 Emergency Action Levels, Rev 0,dtd 990105,under Provisions of 10CFR50,App E,Section V.No Violations of 10CFR50.54(q) Identified During Review ML20207G3151999-06-0707 June 1999 Ack Receipt of Callaway Plant EP Implementing Procedure EIP-ZZ-001001M,Classification of Emergencies,Rev 22,issued on 981222 Under 10CFR50,App E,Section V Provisions.No Violations Identified ML20207G3201999-06-0707 June 1999 Ack Receipt of Change Notice 98-008 Dtd 980918,which Transmitted Changes to Callaway Plant Ep,Rev 21,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required.No Violations Identified ML20195D5111999-06-0202 June 1999 Forwards Safety Evaluation Authorizing Inservice Inspection Program Alternative for Limited Reactor Vessel Shell Weld Exam & Relief Request from Requirements of ASME Code,Section XI for Wolf Creek Generating Station 1999-09-29
[Table view] |
Text
,
%D%oW
+ UNITED STATES
[ g NUCLEAR REGULATORY COMMISSION .
5 j IVASHINGTON, D. C. 20555 4, ,o Docket No. 50-482 3 18 5 Ms. Stevi Stephens Nuclear Awareness Network 13471 Massachusetts IN RESPONSE REFER Lawrence, KS 66044 TO FOIA-85-594
Dear Ms. Stephens:
This is in partial response to your letter dated August 20, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), copies of all documentation pertaining to all cases regarding the Wolf Creek plant. In a telephone conversation with Ms. Pappas, Ms. Reed, and yourself on October 15, 1985, you narrowed the scope of your request to copies of all the Region IV Allegation Data Forms (ADF) and the background records pertaining to these forms. You also clarified that your request covers the time frame between January 1,1983, through August 20, 1985.
The records identified on the enclosed Appendix A are already available for public inspection and copying in the NRC Public Document Room (PDR). The PDR accession number is noted next to the description of each record. Additional records have been identified in NRC's responses to two previous F0IA requests F01A-85-161 and F01A-85-595 under your name, F01A-85-101 under the names of Varricchio and Devine, and F01A-84-291 under the name of Brosius. The responses are maintained in the PDR, and you may obtain copies of these records by referring to the F0IA folders.
Records originated by the Department of Labor (D0L) have been referred to DOL. We have requested that D0L respond directly to you regarding those records.
With the exception of those records identified by asterisks, which are already in the PDR, the records identified on the enclosed Appendix B are being placed in the PDR in Washington, DC, and at the following NRC Local Public Document Rooms (LPDR):
William Allan White Library Emporia State University 1200 Commercial Street Emporia, KS 66801 (316) 343-1200, extension 205 Attention: Ms. Vicky Bozarth Documents Librarian Government Documents Division Washburn University School of Law Topeka, KS 66621 (913)295-6688 Attention: Ms. Jan Brown, Librarian h62 9 860618 STEPHEN 85-594 PDR
Ms. Stephens -
If you have any questions when you visit either LPDR, you may telephone the NRC's LPDR Branch toll free on (800) 638-8081.
There is no charge for inspecting records at the PDR and LPDRs. However, enclosed is a notice which explains charges and procedures for obtaining documents from the PDR. Copying equipment is available at the LPDR for copying records at nominal charges.
We will communicate with you further with regard to additional records which
- are subject to your F0IA request.
Sincerely,
, (nt d O 7 Donnie H. Grimsley, Director Division of Rules and Records Office of Administration
Enclosures:
As stated l
l 1
j l
I
.- . -- . = ..
$.' r 9( .
('
Appendix A FOIA 85-594 age 1 Documents in PDR (First Partial)
Accession No. t
. 6/14/83 Inspection Report 50-482/83-13 W.C. Seidle to 8307120010 G.L. Koester, KG&E 4-83-A-08 1
. 10/13/83 Inspection Report 50-482/83-28, W.C..Seidle to 8311290109 4-83-A-17
~
G.L. Koester, KG&E
.. 8/18/83 Investigation Report 50-482/83-32, W.C. Seidle to 8311290174 G.L. Koester, KG&E 4-83-A-20 -
- 9/1/83 Inspection Report 50-482/83-21, W.C. Seidle to 8310130251 G.L. Koester, KG&E 4-83-A-25
,. 2/14/84 Inspection Report 50-482/84-01, J.E. Gagliardo to 8404030484 G.L. Koester, KG&E 4-83-A-44, 4-83-A-25
. 11/4/83 Inspection Report 50-482/83-29, J.E. Gagliardo to 8311290192 G.L. Koester KG&E 4-83-A-45
. 11/26/84 Inspection Report 50-482/84-33, R.P. Denise to 8412310022 G.L. Koester, KG&E 4-83-A-75 FOIA 85-161
- 11/15/83 Inspection Report 50-482/83-25, J.E. Gagliardo to 3401040435 G.L. Koester, KG&E 4-83-A-75 FOIA 85-161
. 3/'15/85 Investigation Report 50-482/85-18 R.P. Denise to 8503190104 G.L. Koester, KG&E 4-84-A-007 O. 10/12/84 Inspection Report 50-482/84-12, R.P. Denise to 8411030361 G.L. Koester, KG&E 4-84-A-008 t
Inspection Report 50-482/84-23 R.P. Denise to 8503010262
- 1.2/25/85 4-84-A-10; 4-84-A-58; 4-84-A-102 G.L. Koester, KG&E i
- 2. 4/12/84 Inspection Report 50-482/84-07, E.H.' Johnson'to 8406210536 G.L. Koester, KG&E 4-84-A-013 i
,.3 10/24/84 Inspection Report 50-482/84-18, R.P. Denise to 8503250489 G.L. Koester, KG&E 4-84-A-14; 4-84-A-63; 4-84-A-78 l
,, o Appendix A FOIA 85-594 Page 2 Documents in PDR (FirstPartial)
Accession No.
4 8/2/85 Inspection Report 50-482/85-22, R.P. Denise to 8508140221 G.L. Koester, KG&E 4-84-A-19; 4-85-A-45 5 2/28/85 Inspection Report 50-482/84-58 R.P. Denise to 8503050347 G.L. Koester, KG&E 4-84-A-22; 4-84-A-98; FOIA 86-59 4-84-A-55 6 4/16/84 Inspection Report 50-482/84-04, J.E. Gagliardo to 8404100262 G.L. Koester, KG&E 4-84-A-22
- 7. 3/1/85 Inspection Report 50-482/85-03 R.P. Denise to 8503080320 C.L. Koester, KG&E 4-84-A-71; 4-84-A-76; 4-84-A-114; 4-85-A-04
- 8. 1/23/85 Inspection Report 50-482/84-52 R.P. Denise to 8501290495 G.L. Koester, KG&E 4-84-A-80; FOIA 86-59
- 9. 3/4/85 Inspection Report 50-482/85-10, R.P. Denise to 8503080311 G.L. Koester KG&E 4-84-A-195
- 9. 7/26/85 Inspection Report 50-481/85-19 R.P. Denise to 8508080757 G.L. Koester, KG&E 4-85-A-50
- 1. 8/22/85 Inspection Report 50-482/85-31 E.H. Johnson to 8509090200 G.L. Koester, KG&E 4-85-A-77
- 2. 4/12/83 Inspection Report 50-482/83-06, W.C. Seidle to 8305100112 G.L. Koester, KG&E
- 3. 10/19/84 Inspection Report 50-482/84-30 R.P. Denise to 8412030078 G.L. Koester, KG&E
- 24. 10/11/83 Letter from Seidle to Koester, KG&E 8311290165 l
l l l I !
i _ _
. i I
F0IA 85-594 (FirstPartial)
APPENDIX B DATE TITLE
- 1. 2/3/83 Allegation Review, subject:
" Improper Procedure Revision" (1 page) 4-83-A-08
- 2. 3/1/83 Handwritten note, Bill Johnson to Bud (1 page) AIR A4-83-003
- 3. 3/1/83 Handwritten note, Bill Johnson to .
Doyle(1page)4-83-A-17
- 4. 3/3/83 Handwritten note, Bill Johnson to Bud (1page)A4-83-004
- 5. 4/1/83 Allegation Review, subject: " Alteration of Electrical QC NCRs By DI QC Management" (1 page) 4-83-A-25
- 6. 5/19/83 Daniel Int'l Field Change Request (FCR)
Wolf Creek 210/7158 FCR No. 1-4199-E ID of Area and Item - All Areas and Elevations Power Block (1 page) 4-83-A25 ATTACHMENTS:
A. 2/23/83 Daniel Int'l Nonconformance Report (NCR) Wolf Creek 210/7158 ISN 8245-E ID of area and Item - All Areas and Elevations Galvanizing Touch Up Paint Carbo Zinc II (2Pages)4-83-A-25 B. 5/29/81 Request for Clarification of Information (RCI) to Bechtel Power from Wolf Creek Req No.
1-0555-E (1 page) 4-83-A-25
- 7. 7/8/83 Allegation Review, subject: " Alleged Improper Disposition of NCRs" (1 page) 4-83-A-44 1
F01A-85-594 (FirstPartial)
Appendix B
- 8. 7/14/83 System Discrepancy List, Designation EF-1, I.D., Support Verification Checklist. (1 page) 4-84-A-22
- 9. 7/26/83 Handwritten memo, Bill Johnson to Tom Westerman, subject: "4-83-A-8" 4-83-A-08
- 10. 7/26/83 Handwritten memo, Bill Johnson to Tom Westerman, (1 page) "4-83-A-17
- 11. 8/12/83 Handwritten Memorandum, Bill Johnson )
to Ray Hall,
Subject:
" Allegation 4-83-A-54" (1 page)
- 12. 8/25/83 Allegation Review Form, subject:
" Allegation of Intimidation" 4-83-A-78 Q4-83-24 (1 page) Handwritten
- 13. 9/2/83 Previously released under F0IA 85-161:
4-83-A-20, Memorandum T.F. Westerman to File 8507200342 - PDR/F0IA/Stephens85-161 (4 pages)
- 14. 10/15/83 Allegation review, subject: " Drugs on site" (1 page) 4-83-A-70
- 15. 10/18/83 Allegation Review Form, no case number, subject: " Drugs On Site" (1 page)
- 16. 10/18/83 Telephone or Verbal Conversation Record, SRT, Wolf Creek subject: " Alleged Cocaine Use at Wolf Creek Site" (1 page) 4-83-A-70
- 17. 10/19/83 Conversation Record, Seidle to Glenn Koester, subject: " Alleged Cocaine Use at Wolf Creek Site" 4-83-A70 (1 page)
- 18. 10/26/83 Handwritten memo, Bill Johnson to Tom Westerman, subject: "4-83-A-54" (1 page)
- 19. 10/26/83 Handwritten memo, Bill Johnson to Tom Westerman, (1page)4-83-A-17 AIRS A4-83-002
- 20. 12/20/83 Allegation Data Form, Wolf Creek KG&E, (1 page) 4-84-A-008 Q4-84-002
- 21. 1/24/84 Engineering Change Report (ECR (3 pages) 4-84-A-22 l
l 2
l
F0IA 85-594 (First Partial)
Appendix B
- 22. 1/23/84 Telephone or Verbal Conversation Record, Jerri Woodward to K. Whittlesey,
Subject:
" Allegation of Improper Tennination" (1page)4-84-A-13
- 23. 1/24/84 US.NRC Petition For Leave to Intervene and Request for Hearing, for Mary M. Stephens, NAN (14 pages) 4-84-A-10
- 24. 1/26/84 Allegation Review, subject:
" Allegations of Improper Construction" (1 page) 4-84-A-10
- 25. 1/30/84 Letter, Thomas Byrne to William Schum, from Missouri Public Service Commission (2pages)4-84-A-14
- 26. 2/3/84 Allegation Review, subject: " Documentation Construction Deficiencies" (1 page) 4-84-A-14
Electric, 50-482, by NAN (99 pages) accession no. 8402070205 - PDR/AD0CK/50-482G 28, 2/13/84 Facsimile sheet, Schum to Tom Westennan, ATTACHMENT Same Letter dtd 1/30/84, Byrne to Schum (3 pages) 4-84-A-14
- 29. 2/14/84 Corrective Action Report (CAR) Daniel Int'l, CAR No. 1-P-0038, (4 pages) 4-84-A-22
- 30. 2/15/84 Allegation Review, subject: "QA Documentation and Use of Drugs" (1 page) 4-84-A-22
- 31. 2/16/84 Handwritten note, signed Mark T. Woodward, (1page)4-84-A-13
- 32. 2/21/84 Handwritten note, unsigned (1 Page) 4-84-A-14
- 33. 2/21/84 Memorandum, W.S. Schum to Bill Johnson, subject:
" Allegations of Mrs. Jerry Woodward" (1 page) 4-84-A-13
- 34. 2/22/84 Handwritten memo, Bill Johnson to Tom Westerman, subject: " Allegation 4-83-A-25" (1 page) l 3
.J F0IA 85-594 (FirstPartial)
Appendix B ,
l l
, 35. 2/22/84 Handwritten memo, Bill Johnson to )
- Tom Westerman, subject
- " Allegation 4-83-A-44" (1 page)
- 36. 3/15/84 Telephone or Verbal Conversation Record, P. Moppens to W.S. Schum, subject: Information on Mr. M. Woodward
' Allegation (1 page) 4-84-A-13 ATTACHMENT:
Engineering Change Report with various drawings (17 pages)
- 37. 3/27/84 US NRCforMemorandum and Order, Deny (ing NAN's Petition Leave to Intervene 14 pages) 4-84-A-10
- 38. 4/20/84 Allegation Review, subject: Welding Undercur 4-84-A-63 (1 page)
- 39. 5/30/84 Startup Field Report (9 pages) 4-84-A-71
- 40. 6/7/84 Letter, John Collins to G.L. Koester, KG&E (1 page) Processed F0IA 85-161 4-84-A-007 8507200352 - PDR/F0IA/ Stephen 85-161(4pages)
- 41. 6/27/84 Allegation Review, subject: Allegation i startup and Construction (1 page) 4-84-A-71
- 42. 8/1/84 Memorandum, H.F. Bundy to R.P. Denise, subject:
" Allegations By Wolf Creek Startup Engineer" (1page)4-84-A-76
- 43. 8/17/84 Allegation Review, subject: "Possible false resume" (1 page) 4-84-A-80 ATTACHMENT:
l Allegation Data Form, suspected falsified resume (1 page) 4-84-A-80
- 44. 9/13/84 Allegation Review, subject: " Kickbacks, coverups, qualifications in QA Dept" (1 page) 4-84-A-89
- 45. 9/13/84 Allegation Review Form, Same as above.
4-84-A-89 (1 page)
- 46. 9/12/84 Telephone or Verbal Conversation Record, QA Organization at Wolf Creek 4-84-A-89 (1 page)
Anonymous to L.E. Martin
! 4 l
F0IA 85-594 (First Partial)
Appendix B
- 47. 10/1/84 Memo, Daniel Int'l, Inspection and Documentation Requirements (1 page) w/att, Field Change Request (5 pages) 4-84-A-102 Scott Miller ATTACHMENT Weld Data Sheets, assorted, (66 pages)
- 48. 10/1/84 Allegation Review, subject: " DOL complaint containing QA/QC program allegations"(1page)4-84-A-98
- 49. 10/3/84 Allegation Action Plan, G.L. Madsen, L.E. Martin, Allegation Concerning Structural Steel Weld Inspections, (1 page) 4-84-A-102
- 50. 10/3/84 Memorandum, Bruce L. Bartlett to Richard Denise, subject: " Allegation Concerning Structural Steel Weld Inspections" (2 pages) 4-84-A-102
- 51. 10/3/84 Handwritten note, unsigned (4 pages) 4-84-A-102 " Mr. L. Martin, RIV NRC" (firstwords)
- 52. 10/3/84 Allegation Review, subject: " Structural steel weld inspections" (1 page) 4-84-A-102
- 53. 10/3/84 Allegation Data Form, rough draft, Wolf Creek structural steel welds inspections (1 page) 4-84-A-102 Bartlett
- 54. 10/3/84 Allegation Data Fonn Wolf Creek structural steel weld inspections B.L. Bartlett (1 page) 4-84-A-102
- 55. 10/22/84 Allegation Data Form, Alleged Drug Plant, (1 page) 4-84-A-114
- 56. 11/20/84 Handwritten memo, L.E. Martion to Tom Westerman, subject: " Allegation 4-83-A-44" (1 page)
- 57. 12/12/84 Allegation Data Form, Wolf Creek, Breslau, Westerman (1 page) 4-84-A-195 5
- F0IA 85-594 (First Partial)
Appendix B
- 58. 12/26/84 Memorandum, T.F. Westerman to Allegation Files 4-83-A-08 and 4-83-A-54, subject:
" Question of Intimidation, Harassment, And/
Or Discrimination" (2 page)
- 59. 1/9/85 Allegation Data Fonn, (1 page) 4-85-A-04
- 60. 1/22/85 Memorandum, Robert D. Martin to Richard K. Herr subject: " General Allegations Regarding KG&E and Quality First" (1 page) 4-84-A-195 Released F0IA 85-161 8606110135 - PDR/F01A/ Young-85-161
- 61. 2/4/85 Letter, partially superimposed with call memorandum, Robert D. Martin to Mary Stephens, Nuclear Awareness Network (1 page) 4-85-A-13 concurrence copy
- 62. 2/4/85 Letter, Robert D. Martin to Mary Stephens, Nuclear Awareness Network (1 page) 4-85-A-13 concurrence copy
- 63. 2/6/85 Allegation Review, subject: Electrical problems (1 pg) 4-84-A-04
- 64. 2/19/85 Handwrittennote,GM,(1page)4-84-A-85
- 65. 3/13/85 Allegation Data Form, (1 page) 4-85-A-44
- 66. 3/15/85 AllegationDataForm,(1page)4-85-A-13 Wolf Creek
- 67. 3/17/85 STN Procedures Manual Table of Contents (80 pages) 4-85-A-50
- 68. 4/5/85 Memorandum, T.A. Nash to File, subject:
" Allegation RIV-84-A-98 (1page)
- 69. 4/12/85 Memorandum, H.F. Bundy to L.E Martin, subject:
" Document Control Audit of E0F and TSC" (1page)
- 70. 4/29/85 Memorandum, R.P. Mullikin to Allegation File, subject: " Background Information For Allegation 4-84-A-114" (1 page) concurrence copy
- 71. 5/15/85 Allegation Data Input form, concerns in areas of D0L (1 page) 4-85-A-45
- 72. 5/26/85 Newspaper article, "KG&E Foes Cite Report of Cover-Up" (1 page) 4-85-A-62 6
FOIA 85-594 (First Partial)
Appendix B
- 73. 7/22/85 Memorandum, Clyde E. Wisner to Tom Nash, subject: " Kansas City Times Inquiry Regarding Wolf Creek" (1 page) 4-85-A-77
- 74. 7/29/85 Memorandum, Spitxberg/Chaney thru Blaine Murray, for Tom Nash, subject: " Review of Alleged July 7, 1985 Overexposure at Wolf Creek Generating Station" (2 pages) 4-85-A-77
- 75. 7/30/85 Allegation Review, subject: " Intimidation of QC Inspector" (1 page) 4-84-A-007
- 76. 7/30/85 Allegation Review, subject: "Im Construction Practices" (1 page) proper 4-84-A-008
- 77. 8/6/85 Memorandum, L.E. Martin to T.A. Nash, subject:
" Allegation 4-85-A-13"(1page)4-85-A-13
- 78. 8/6/85 Memorandum, L.E. Martin to T.A. Nash, subject:
" Allegation 4-84-A-114" (1 page) 4-84-A-114
- 79. 8/26/85 Allegation Data Input, Reporter from Kansas City Times called RIV re anonymous caller (1page)4-85-A-77 i
- 80. 8/?/85 Letter, T.A. Nash to To Whom It May Concern, subject: "RIV-85-A-00077" (1 page) 4-85-A-77
- 81. 8/27/85 Allegation Review, subject: " General allegation regarding KG&E and Quality First" (1 page) 4-84-A-195
- 82. 8/27/85 Allegation Review, subject: " Alleged Drug Plant" (1page)4-84-A-114
- 83. 8-28-85 Allegation Review, subject: Radiation overexposure in containment building (1 page) 4-85-A-77
- 84. 9/3/85 Allegation Review, subject: " Allegation of Improper Termination" (1 page) 4-84-A-13 l Sort Code X ATTACHMENTS:
A. Allegation Review, subject: " Allegation of l Improper Termination" (1 page) 4-84-A-13 Sort Code C 1
B. Allegation Review, subject: " Allegation of Improper Termination" (1 page) 4-84-A-13 Sort Code C 7
F0IA 85-594 (First Partial)
Appendix B
- 85. 9/4/85 Memorandum, L.E. Martin to T.A. Nash, subject:
" Allegation 4-85-A-44" (1 page) 4-85-A-44
- 86. 9/4/85 Memorandum, L.E. Martin to T.A. Nash, subject
" Allegation 4-85-A-44" (1 page) 4-85-A-44
- 87. 9/4/85 Memorandum, L.E. Martin to T.A. Nash, subject:
" Allegation 4-85-A-076" (1 page) 4-84-A-76
- 88. 9/4/85 Allegation Data Input fom, KG&E mishandling (1page)4-85-A-50
- 89. 9/4/85 Memorandum, L.E. Martin to T.A. Nash, subject:
" Allegation 4-85-A-050" (1 page) 4-85-A-50
- 90. 9/27/85 Allegation Review, subject: " Potential discrimination case" (1 page) 4-84-A-76
- 91. 9/30/85 Allegation Review, subject: Alleged KG&E mishandling of document control program (1 page) 4-85-A-50
- 92. 10/2/85 Allegation Review, subject: General Allegations Concerning Quality Assurance and Quality Control (1 page) 4-85-A-44 Wolf Creek
- 93. 10/15/85 Allegation Review, subject: Inadequate / improper installation of equipment and electrical (1 page) 4-85-A-45
- 94. 1/21/86 Allegation Review, subject: " Alteration of Personnel Records" (1 page) 4-84-A-85
- 95. 3/3/86 Allegation Review, subject: Alle construction activities, (1 page)gations 4-85-A-13related to 8
F0IA 85-594 (FirstPartial) l Appendix B
- 96. Undated Document List, 3 items, (1 page) 4-85-A-13
- 97. Undated Allegation Data Form, rough draft, Wolf Creek, Intimidation and Harassment (1 page) 4-84-A-102
- 98. Undated Document List, 3 items, 4-84-A-102 (1 page)
- 99. Undated Document list, 2 items (1 page) 4-84-A-71 100. Undated Document List, 4 items 101. Undated Various drawing copies of welds and valves (16 pages) 4-84-A-22 102. Undated Two pages out of context of inspection report 50-482/84-07 pp 5 and 6, almost illegible (2 pages) l 4-84-A-13 l
103. Undated Handwritten note, Weld involved (3 lines) (1 page) '
4-84-A-13 104. Undated Handwritten memo, Bill Johnson to Tom Westennan, subject: " Allegation 4-83-A-70" (1 page) 105. Undated Letter, T.A. Nash to Mary Stephens (1 page) w/ handwritten note at top and bottom of letter dtd 8/30/85 4-85-A-13 106. Undated " Correction of Tests (Certification) Between Revisions" Lloyd - Gladman (1 page) A-4-83-003 4-83-A-08 107. 1/27/83 Inter Office Comunication, W.S. Lockwood to l Lloyd Gladman subject: " Level II Coatings Certification Examination" (1 page) A-4-83-003 4-83-A-008 108. 1/28/83 Inter Office Comunication, L.D. Bryant to 0.L. Gladman, subject: "Out of Date Certification ,
Examinations and/or Questions" (1 page) A-4-83-003 l 4-83-A-008 l
109. 2/1/83 Memo, W.S. Lockwood to L. Gladman, subject: " Civil Coatings Examination L/II" (1 page) A-4-83-003 4-83-A-08 9
F0IA 85-594 (FirstPartial)
Appendix B 110. 10/26/83 Memo, handwritten, Bill Johnson to Tom Westerman, subject: "4-83-A-45"(1page)
Processed in 85-161 111. 3/12/85 Allegation Review, subject: Harassment of QC Inspectors 4-84-A-15 (1 page) 112. Undated Memo, handwritten, Bill Johnson to Tom Westerman, subject: " Allegation 4-84-A-15" (1 page) Processed in 85-161 113. 2/5/85 Letter To Mr. Thomas M. Byrne from L.E. Martin (2 pages) 4-84-A-014 10
_ - _ _ - _ _ . ._ ,. -