ML20133J490

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request for Four Categories of Documents Re QC at Facility.Documents on App a Available in Pdr.Search Continuing
ML20133J490
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/11/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Bell N
NUCLEAR INFORMATION & RESOURCE SERVICE
References
FOIA-85-655 NUDOCS 8510180467
Download: ML20133J490 (2)


Text

_ _ - . . _ - _ _ _ _

902 -o no y

/: ~,fg g

UNITED STATES NUCLEAR REGULATOgY COMMISSION 7; y WASHINGTON, D. C. 20555

%...../

GCT 11 Wii Ms. Nina Bell, Assistant Director Nuclear Information and Resource Service 1616 P Street, NW, Suite 160 IN RESPONSE REFER Washington, DC 20036 TO F01A-85-655

Dear Ms. Bell:

This is in partial resoonse to your letter dated September 23, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), four categories of documents related to quality control at the Callaway nuclear power plant.

The documents listed on the enclosed Appendix A are already available in the NRC Public Docum!nt Room (PDR) located at 1717 H Street, NW, Washington, DC.

The NRC has not completed its search for and review of documents subject to your request. We will respond as soon as those actions are completed.

Since ely, Y

-t . M. Felton, Director Division of Rules and Records Office of Administration

~

Enclosure:

As stated a

a 8510180467 PDR 851011 FOIA DELL 85-655 PDR l

a

, Re: FOIA-85-655 APPENDIX A

1. 03/25/85 Show Cause Petition form the Missouri Coalition for the Environment and Kay Drey requesting suspension or revocation

": of the OL for Union Electric Company's Callaway Nuclear Plant, Unit 1 - Accession No. 8504040333. (10 pages)

2. 04/01/85 Inspection Report 50-483/85002 (follow-up on allegation
RIII-85-A-0021) - Accession No. 8504080524. (12 pages)
3. 05/10/85 A 50.54(f) letter of Schnell from Taylor Docket No. 50-483 -

Accession No. 8505170328. (15 pages)

4. 05/10/85 Memo to T. Combs from Taylor; Federal Register Notice on t

receipt of 10 CFR 2.206 on the Callaway Nuclear Plant -

Accession No. 8505200103. (4 pages) i 5. 06/06/85 Licensee's Response to Show Cause Petition of the Missouri Coalition for the Environment and Kay Drey before the Director, IE - Accession No. 8506070653. (30pages) 4

6. 08/21/85 SALP Report, J. Keppler to Union Electric Company - Accession No. 8508260078. (42 pages) 1
7. 08/21/85 Letter to Schnell from Taylor - Accession No. 8508230042.

I (2 pages)

8. 08/21/85 Letter to Nemes (attorney for petitioners) from Taylor -

Accession No. 8508230110. (2 pages) l l

I i

b i

t l

i l

f

, . , . -,---,,-n--,-,,,--.-,,,r- - - - - - - -,-~---e- , - - , - , . - - ----,y,,-,- .- ,

~_%

I 504638b2034

,. . PK!tlM; tine 7 follflCAllen 0F EVE 117 OR UlluSUAL OCCURRLiiCE--Pt.0-I(1-85-20

-, Date (p, A (. M65

) p. .

1 This preliminary oublic notification constitutes EARLY notice of events of P0551Blf int 0 rest significance. r The information is as initially received witi.out veri-N ation or evaluation, and is basically all that is known by the staff on this date. rb /)

tacility: Union Electric Company Callaway Nuclear Plant Licensee Emerge'ncy Classification:

Steedman, MD 65077 Notification of an Unusual Event Alert Docket No: 50-483 Site Area Emergency General Emergency 2 t ot N Applicable

Subject:

DECERTIFICATION OT QC INSPECTORS The licensee informed the Resident Inspector on February 26, 1985, that seven Union Electric Quality Control Inspectors were decertified after a review identifie procedural program. and education / experience deficiencies in UE's inspector certification impact on Construction.The decertification only affects the Operational QC program . not and j

The licensee began the re certification process wa: view after employees alleged that a key procedure in the i.e., that a level 111, inspector had not signed the certification documents of recently certified Level III The allegation additional was substantiated and further review by the licensee uncove deficiencies:

insufficient records to support QC inspector certification; QC inspectors did not have the required work experience in accordance wit

. deficiencies in the UE Certification / Qualification program .

eral i

, As part ofor:its correction action program, the licensee is planning an the impact u eval on of ati the plant by these now non-certified inspectors.

i include a reinspection of at least a sample of their work This on safety evaluation related will s ystems.

The resident inspectors are~following the licensee's course of action .

The State of Missouri will be notified.

The news media is aware of the inspettor decertification. "

This information is current as of 11:30 a.m., March 4,1985. i.-

CONTACT: P. Pelke E. Greenman I' FIS 388-5560 FTS 388-5518 l.

' DISTRIBUTION:

H. St. M .W MNBB/3 ' &

Chairman Palladino Phillips_/ 3 rb E/W /? W EDO tiRR

~

Willste /3 #7 Comm. Roberts PA IE NMSS Com. Asselstine MPA OlA RES Cunn. Berntha! AE00

i. Zech ELD Air Rights /? io MAIL:

/ SP (TRSA CA

!!aPO i 33 >

NSAC f? 26 ADM:DMB 00T: Trans Only POR Applicable Resident Site /3 t) ,

Megions 135' , II ,; >?, ivy; //, V ,3 % ~l Licensee (Corporate Office)/'/ e-Q g-- - ~" \ .

p PNG-Isl-05-020 PDR Pev. 07/CC/E' O