ML20198E649
| ML20198E649 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs, Oconee, Indian Point, Catawba, Byron, Seabrook, River Bend, Callaway, Waterford, 05000000 |
| Issue date: | 05/08/1986 |
| From: | Grimsley D NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Murphy S NUCLEAR INFORMATION & RESOURCE SERVICE |
| Shared Package | |
| ML20151L176 | List: |
| References | |
| FOIA-86-266, REF-GTECI-A-03, REF-GTECI-A-04, REF-GTECI-A-05, REF-GTECI-SG, REF-PT21-86, RTR-NUREG-0844, RTR-NUREG-844 ACRS-GENERAL, IEIN-86-005, IEIN-86-5, NUDOCS 8605280139 | |
| Download: ML20198E649 (7) | |
Text
f
- >blLOI pnstop UNITED STATES 4
'o NUCLEAR REGULATORY COMMISSION
~
W ASHINGTON, D.
C.
20555
\\
u j
f MAY 8 E66 Ms. Stephanie Murphy Nuclear Information and Resource Service 1616 P.
Street, NW, Suite 160 IN RESPONSE REFER Washington, DC 20036 TO FOIA-86-266
Dear Ms. Murphy:
This is in regard to your request, pursuant to the Freedom of information Act, to which the NRC assigned the above number.
_K__
This is a partial response to your request.
We will notify you upon completion of search for and review of any additional records subject to your request.
The staff has completed the search for and review of records subject to your request, and this is the final response to your request.
The NRC has no records subject to your request.
_K__
Records subject to your request are available for public inspection and copying at the NRC Public Document Room
?
(PDR), 1717 H Street, NW, Washington, DC 20555, as noted on the enclosure (s).
The PDR accession number is identified beside each record description.
_K__
Records subject to your request are being made available for public inspection and copying at the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555, in the PDR file folder under the above number and your name.
These records are listed on the enclosure (s).
We are enclosing a notice that provides information about charges and procedures for obtaining records from the PDR.
Sincerely,
\\
Donnie H. Grimsley, Direc or
]
Division of Rules and Records j
Office of Administration i
Enclosure (s):
As stated 8605280139 860508 PDR FOIA j
MURPHY 86-266 PDR
j l
-Appendix A 1.
09/10/85 ACRS Subcommittee on' Reactor Operations (21 pgs.)
Acc. No. 8509130242.
2.
09/26/85 PNO-III-85 Main Steam SafetyValves Failure (1 pg.)
3.
01/15/86 LER 82-059 - Salem Generating Station Unit 2 -
(6 pgs. ) Acc. No. 8601220567.
4.
01/21/86 IE Information Notice 86-05: Main Steam SafetyValves Test Failures and Ring Setting Adjustments (2 pgs.) Acc. No.
8601290054.
5.
03/21/86 LER 86-001 - North Anna Power Station, Unit 2 (5 pgs.)
Acc. No. 8603260159.
4 E
i 5
4 4
j
Re: F01A-86-266 APPENDIX B 1.
Undated Handwritten Note Re: Oconee 1 (1 page) 2.
Undated Handwritten Notes Re: Main Steam Safety Valve Test Failures (2 pages) 3.
Undated Handwritten Note to Gary from Mark C. (1 page) 4.
Undated Handwritten Note Re: A Related MSSV Problem (1 page)
~
5.
Undated Various Figures (2 pages) 6.
Undated Memo to Dennis Crutchfield from Robert Bosnak Re: Inadequate Main Steam Safety Valve Capacity at Seabrook w/ enclosure Handwritten Note to Crutchfield Re: Seabrook (9 pages) 7.
Undated Generic Issue Information (1 page) 8 Undated Memo to Hugh Thompson from Robert Bernero Re: Safety Implications of Main Steam Safety Valves w/ enclosure Handwritten Insert (5 pages)
)
9.
Undated Handwritten Note to Gary from Mary (1 page)
- 10. Undated Handwritten Memo Re: Request for DSR0 Prioritization of a Generic Issue on the Reliability of PWR Main Steam Safety Valves w/ enclosure Generic Issue Information (9 pages)
- 11. Undated Memo to List from David Jaffe Re: Daily Highlight - Calvert Cliffs Unit 2 Main Steam Safety Valves (1 page)
- 12. Undated Agenda U-1 w/ enclosure MSSV Unit 1 Lift Setpoint Test (4 pages)
- 13. Undated Agenda U-2 w/ enclosure Charts (18 pages)
- 14. Undated Sheet Re: Opening Pressure Tolerance (1 page)
- 15. Undated Sheet Re: Safety Valve Operating Requirements (2 pages)
- 16. Undated Handwritten Sheet Re: Production Testing (1 page)
- 17. Undated Memo to Gary Holahan from Frank Cherny Re: MEB Comment on Draft NUREG-0844 (4 pages)
- 18. Undated Handwritten Memo to Gary Holahan Re: MEB Coninent on Draft NUREG-0844 (5 pages)
Re: F01A-86-266
- 19. Undated Various Charts Re: Boiling Water, Pressurized Water, Gas
. Cooled Reactor Service (8 pages)
- 20. Undated Handwritten Chart Re: North Anna 1 (2 pages) 21.
10/30/84 Memo Slip to Joel from Bill Troskoski Re: Steam Generator Safety (1 page) 22.
12/00/84 Seabrook - Crosby Main Steam Safety Valve Flow Deficiency (5 pages)
- 23. 01/23/85 Memo to List from Helen Nicolaras Re: Daily Highlight -
Main Steam Safety Valves Repeatedly Delayed to Reseat After Reactor Trips (1 page)
- 24. 01/29/85 Handwritten Note Re: Oconee Steam Gen Safety (1 page)
- 25. 02/05/85 Memo to Frank Cherny from Robert Baer Re: 50.55(e) Report on Crosby Main Steam Valve Ring Settings w/ enclosure Ltr. dtd.
1/17/85 to Richard Starostecki from J. DeVincentis (3 pages)
- 26. 02/08/85 Handwritten Note to M. Wegner Re: Seabrook MSSV's (1 page)
- 27. 02/20/85 Handwritten Note Re: Seabrook MSSV (1 page)
- 28. 02/26/85 Handwritten Notes Re: Relief Valves (6 pages)
?
- 29. 02/27/85 Letter to Harold Gregg from J. DeVincentis Re: Seabrook Main Steam Safety Valve Ring Setting Deficiency w/ enclosure Test Procedure for Wyle High Flow Steam System Safety / Relief Valves (65 pages)
- 30. 03/12/85 Handwritten Note Re: Oconne MSSV Blowdown (1 page)
- 31. 06/27/85 Handwritten Note Re: PSNH Back Pressure Effect (2 pages)
- 32. 07/10/85 Note to E. Weiss from D. Tarnoff Re: Operating Reactors Events Briefing w/ enclosure Guidelines for Presenters (5 pages)
- 33. 07/15/85 Handwritten Note Re: Call to Crosby (1 page)
- 34. 07/16/85 Handwritten Note Re: MSSVLift(1page)
- 35. 07/16/85 Operation Reactors Events Briefing (15 pages)
- 36. 07/16/85 Letter to Robert Oller from Joseph Greene Re: Conference Call of July 15, 1985 w/ enclosure Crosby Instruction Manual (45 pages)
Re: 86-266
- 37. 07/18/85 Note to E. Weiss from Daniele Tarnoff Re: Operating Reactors Events Briefing w/ enclosure Tentative Agenda (2 pages)
- 38. 07/23/85 Handwritten Note Re: Briefing (1 page)-
- 39. 07/05/85 IE Information Notce Re: Inadequate Capacity of Main Steam Safety Valves in PWR Plants (7 pages)
- 40. 08/02/85 Memo to Hugh Thompson from Dennis Crutchfield Re: Summary of the Operating Reactors Events Meeting on July 23, 1985 w/ enclosures List of Attendees and Operating Reactors Events Briefing (29 pages)
- 41. 08/02/85 Handwritten Memo to D. Crutchfield from RJB Re: Transmittal of Proposed IE Information Notice Re: Main Steam Safety Valves w/ enclosure IE Notice (3 pages)
- 42. 08/05/85 Handwritten Note to Frank from Bob Re: Questions on Valve Manufacturers w/ enclosure Charts (3 pages)
- 43. 08/09/85 Route Slip to Frank Cherny from Warren Swenson w/ enclosure Report from Region II 92 pages)
- 44. 08/09/85 Memo to Dennis Crutchfield from Robert Bosnak Re: Transmittal of Proposed IE Information Notice Re: Main Steam Safety Valves w/ attachment IE Notice (3 pages)
- 45. 08/13/85 Figure Re: Main Steam Safety Valve (2 pages)
- 46. 08/15/85 Route Slip to Gary Hanner from Hal Gregg w/ enclosure Figure (2 pages)
- 47. 08/27/85 Letter to Richard Starostecki from John DeVincentis w/ enclosure List of Addresses (3 pages)
- 48. 08/30/85 Note to F. Cherny from R. Hernan Re: 09/10/85 ACRS Meeting on OR Events w/ enclosures Memo dtd 8/29/85 to Jesse Ebersole from Richard Major and Proposed Schedule (5 pages) 1
- 49. 09/00/85 IE Information Notice Re: Main Steam Safety Valve Test Failures and Ring Setting Adjustments (5 pages)
- 50. 09/09/85 Memo to Edward Jordan from Hugh Thompson Re: IE Notice Regarding Main Steam Safety Valve Test Failures at Wyle Laboratories w/ enclosure Draft IE Notice (5 pages) i
- 51. 09/09/85 Memo to Gary Holahan from Frank Cherny Re: MEB Comment on Draft NUREG-0844 "NRC Integrated Program for the Resolution of USE A-3, A-4 and A-5 Regarding Steam Generator Tube Integrity (2 pages)
- 52. 09/10/85 Tentative Agenda for ACRS Subcommittee Meeting (3 pages)
- 53. 09/13/85 Note to EQB from Bob Bosnak Re: OR Events Assigned to CSE w/ enclosure Followup Items (7 pages)
- 54. 09/20/85 Handwritten Note to Gary w/ enclosure Followup Items (2 pages)
- 55. 09/25/85 IE Information Notice Re: Main Steam Safety Valve Test Failures and Ring Setting Adjustments (6 pages)
- 56. 09/25/85 Handwritten Note to Mary from Gary H. Re: Testing w/ enclosure IE Information Notice Re: Main Steam Safety Valve Test Failures and Ring Setting Adjustments (4 pages)
- 57. 09/27/85 Memo to Dennis Crutchfield from Robert Bosnak Re: July 23, 1985 Operating Reactor Events Briefing Open Item - Inadequate Main Steam Safety Valve Capacity at Seabrook w/ enclosure Handwritten Note to Frank Cherny from Brian (4 pages) 58.
10/11/85 Letter to Larry Vaughan from John Watz Re: 10 CFR 21 w/ enclosures Note to B. Br'anson, Note to Bolger and Traveler and Procedure Checklist (5 pages) 59.
10/22/85 Handwritten Note to Frank Re: Calvert Cliffs w/ enclosure Main Steam Safety Valve Failures List (3 pages) 9 60.
11/04/85 Telecopy Transmittal to NRR from North Anna Re: Crosby Test Report w/ enclosure Crosby Report No. 4156 (9 pages) 61.
11/14/85 LER SCSS Data (49 pages) 62.
11/19/85 Handwritten Note Re: Region II MSSV Testing (1 page) 63.
11/20/85 Main Steam Safety Valve Test History Unit 1 NAPS (2 pages) 64.
11/26/85 Handwritten Notes Re: Calvert Cliffs (2 pages) 65.
11/26/85 Calvert Cliffs MSSV Meeting Agenda U-2 (23 pages) 66.
12/09/85 Memo to Gary Holahan from Brian Sheron Re: Followup on PWR MSSV Problem w/ enclosed Memo dtd. 11/22/85 to Hugh Thompson from Robert Bernero and Safety Implications (8 pages) 67.
12/10/85 Meeting Minutes (1 page) 68.
12/13/85 Memo to Ashok Thadani from D. Jaffe Re: Summary of Meeting with Baltimore Gas & Electric Company Concerning Operability of Steam Line Safety Valves w/ enclosures List of Addresses and Charts (25 pages)
Re: F0IA-86-266 69.
12/20/85 Memo to Robert Bosnak from Frank Cherny Re: Trip Report -
Meeting of ASME Section III Sub w/ attachment Synopsis (2 pages) group on Pressure Relief l
- 70. 02/21/86 North Anna, Unit 2 - Failure of Multiple Main Steam Safety l
Relief Valves (3 pages)
- 71. 03/12/86 Meeting Minutes - ASME (2 pages)
- 72. 03/17/86 Memo to Karl Kniel from Brian Sheron Re: Request for Prioritization of a Generic Issue of the Reliability of PWR Main Steam Safety Valves w/ attachments Generic Issue Information Ltr. dtd.1/17/85 to Richard Starostecki (45 pages)
- 73. 03/28/86, Memo to Robert Bosnak from Frank Cherny Re: Trip Report -
Meeting of ASME Section III Subgroup on Pressure Relief w/ attachment Synopsis (3 pages)
- 74. Undated IE Information Notice Re: Main Steam Safety Valves Test Failures and Ring Setting Adjustments (8 pages) l 1
- - -