Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K1051999-10-19019 October 1999 Ack Receipt of Ltr Dtd 990707,which Transmitted Rev 29 to Callaway Plant Physical Security Plan,Under Provisions of 10CFR50.54(p).Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML20217G2071999-10-14014 October 1999 Forwards Insp Rept 50-483/99-10 on 990913-16.No Violations Noted.Insp Was to Review Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise ML20217B5901999-10-0505 October 1999 Informs That Staff Concludes That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Callaway Plant,Unit 1 ML20217B5711999-10-0505 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & Uec Responses for Callaway NPP Unit 1 ,990224 & 990628.Informs That Staff Reviewed Responses & Concluded That All Requested Info for GL 98-01 Provided ML20212G0221999-09-22022 September 1999 Forwards Insp Rept 50-483/99-11 on 990812-20.No Violations Noted.Team Found,Weakness in flow-accelerated Corrosion Monitoring Program Resulted in No Previous Insp of Pipe Segment Which Failed ML20212D9341999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Callaway Plant.In Area of Ep,C/As Taken in Response to Problems Identified During Previous Exercises Warrant More in-dept Review.Details of Insp Plan Through March 2000 Encl ML20217D5791999-09-15015 September 1999 Provides Formal Documentation of Reviews & Discussions Re Technical Ltr Rept for Proprietary Info.Review of Ltr Was Discussed in Telcon & Via e-mail Messages. Summary of Telcons as Documented on 990708,included ML20212A4921999-09-13013 September 1999 Forwards Insp Rept 50-483/99-08 on 990725-0904.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212A4701999-09-10010 September 1999 Rssponds to NRC 990709 RAI Re Util Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection Iwe. Acceptance Criteria for Liner Plate Pressure Boundary Thickness Will Be Limited to 10% Nominal Thinning ML20212B1521999-09-10010 September 1999 Forwards Insp Rept 50-483/99-07 on 990809-13.No Violations Noted.Inspectors Used Annual Licensed Operator Requalification Exams to Assess Licensed Operator Performance ML20211N0321999-09-0202 September 1999 Forwards SE Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20211B0241999-08-18018 August 1999 Ack Receipt of Ltr Dtd 990714,transmitting Scenario for Licensee Upcoming Biennial Exercise.Based on Review,Nrc Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20210T9121999-08-13013 August 1999 Forwards Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20210R7241999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data Rept for Callaway Nuclear Plant for 990101-990630,IAW 10CFR26.71(d) ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ULNRC-04085, Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power1999-08-11011 August 1999 Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power ML20210P0371999-08-10010 August 1999 Forwards SE Granting Licensee 980710 Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code for Second 10-year Interval ISI at Plant,Unit 1 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ULNRC-04079, Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210H6381999-07-30030 July 1999 Forwards SE Accepting Relief Request for Approval for Use of Alternate Exam Requirement for Plant Inservice Insp Program A93443, Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves1999-07-28028 July 1999 Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves ULNRC-04075, Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves1999-07-28028 July 1999 Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves ULNRC-04076, Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs1999-07-28028 July 1999 Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs ULNRC-04070, Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power1999-07-27027 July 1999 Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power 05000483/LER-1998-008, Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved1999-07-27027 July 1999 Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved ULNRC-04071, Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-021999-07-27027 July 1999 Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-02 ML20210B5611999-07-20020 July 1999 Forwards Review of Ltr & Encl Objectives for Plant,Unit 1,1999 Emergency Plan Exercise Scheduled for 990914 ML20210B4021999-07-19019 July 1999 Ack Receipt of Facility Emergency Plan Implementing Procedure EIP-ZZ-00101, Classification of Emergencies, Rev 23,issued on 990513,under Provisions of 10CFR50,App E, Section V ML20210B4401999-07-19019 July 1999 Ack Receipt of Revs to Facility Radiological Emergency Response Plan,Chapters 8.0 & 4.0,issued Respectively on 990512-14,under Provisions of 10CFR50,App E,Section V ML20212A3291999-07-15015 July 1999 Forwards Scenario Manual Containing Description of Callaway Plant 1999 Biennial Emergency Response Plan Exercise to Be Conducted 990914.Correspondence to Satisfy 60-day Submittal Requirement ML20209F3471999-07-0909 July 1999 Forwards Response to NRC 990624 RAI to Complete NRC Review of Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection IWE ML20209E5591999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.TAC MA0531 Closed ML20209H2471999-07-0707 July 1999 Forwards Rev 29 to Physical Security Plan,Per 10CFR50.54(p). Rev Withheld,Per 10CFR73.21 ML20196J9501999-07-0202 July 1999 Ack Receipt of Plant Ep,Rev 22,received on 981207 & Submitted Under Provision of 10CFR50,App E,Section V.Changes Does Not Decrease Effectiveness of EP & Continues to Meet Stds of 10CFR50.47(b).NRC Approval Not Required ML20209B6851999-06-28028 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Nuclear Power Plants. Disclosure Rept Encl ML20209C0171999-06-28028 June 1999 Forwards Special Rept 99-01 Re Fifteenth Year Inservice Containment Bldg Tendon Surveillance Failure.Observed Voids in Sheathing Filler Grease Do Not Indicate Degradation of post-tensioning Sys,Based on Encl Evaluation ML20196F8101999-06-25025 June 1999 Informs That J Donohew Will Assume Project Manager Responsibilities,Effective 990621 ML20196H2521999-06-25025 June 1999 Forwards Insp Rept 50-483/99-05 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20196F8181999-06-24024 June 1999 Forwards RAI Re 990111 Request for Relief from Certain ASME Code ISI Requirements for Containment Liners.Response Requested within 30 Days from Date of Agreement ML20196G5621999-06-21021 June 1999 Informs NRC of Implementation of Amend 132 to Callaway License NPF-30 to Allows Installation of Electrosleeves for Steam Generator Tube Repair for Two Cycles Following Installation of First Electrosleeve IR 05000483/19990041999-06-18018 June 1999 Refers to GL 96-05 Issued by NRC on 960918,UE Responses & 970313 & NRC Insp Rept 50-483/99-04,dtd 990427. Forwards Request for Addl Info Re GL 96-05 Program at Callaway Plant,Unit 1 ML20212J2441999-06-18018 June 1999 Submits Request for Alternate Exam Requirements for Plant Re ISI Program Plan.Plant Does Not Torque Bolted Connections to Stress Values Greater than 100 Ksi ML20195H0971999-06-14014 June 1999 Discusses Une 990407 Request That Proprietary Document Entitled, Thermal Stability Assessment - Electrosleeved Tubes, Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20207H3751999-06-14014 June 1999 Discusses 990407 Une Request That Proprietary Version of Document Entitled, Evaluation of Severe Accident Simulation, Dtd April 1999,be Withheld from Public Disclosure.Determined Info Proprietary & Will Be Withheld ML20195H9731999-06-11011 June 1999 Forwards Requested Addl Info Related to Relief Request ISI-16,encountered During Refuel 9 ML20195J9301999-06-0808 June 1999 Informs That Refuel 9 OAR-1 Owners Data Rept for ISI & Summary Rept for Interval 2 Was Submitted with Typographical Error,In That Commercial Service Date Should Be 841219,vice 941219.Please Substitute Encl Corrected Document ML20207G3201999-06-0707 June 1999 Ack Receipt of Change Notice 98-008 Dtd 980918,which Transmitted Changes to Callaway Plant Ep,Rev 21,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required.No Violations Identified ML20207G3151999-06-0707 June 1999 Ack Receipt of Callaway Plant EP Implementing Procedure EIP-ZZ-001001M,Classification of Emergencies,Rev 22,issued on 981222 Under 10CFR50,App E,Section V Provisions.No Violations Identified ML20195C5131999-05-28028 May 1999 Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27 A98803, Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS1999-05-27027 May 1999 Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS 1999-09-22
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARML20195G2121988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App D Document & Releasable Portions of Documents E/1 Through E/3. App D & Releasable Portions of Documents E/4 Through E/6 Available in Pdr.Portions Withheld (Ref FOIA Exemption 5) NUREG/CR-5009, Forwards NUREG/CR-5009, Assessment of Use of Extended Burnup Fuel in Lwrs. Rept Concludes That Environmentally, Burnup Increase Would Have No Significant Impact Over That of Normal Burnup.W/O Encl1988-10-26026 October 1988 Forwards NUREG/CR-5009, Assessment of Use of Extended Burnup Fuel in Lwrs. Rept Concludes That Environmentally, Burnup Increase Would Have No Significant Impact Over That of Normal Burnup.W/O Encl ML20205S3841988-10-13013 October 1988 Partial Response to FOIA Request for Documents.App D,E & F Records Encl & Available in Pdr.App F Records Partially Withheld (Ref FOIA Exemption 6) ML20236V5241987-11-18018 November 1987 Forwards 870806 SALP Rept,In Response to Question Re Performance of Plant ML20236D1691987-10-21021 October 1987 Responds to Re Replacement of Fuel Rods W/Filler Rods & Vantage-5 Fuel for Cycle 3 Operation at Facility.Encl Safety Evaluation Discusses Safety Considerations That Were Evaluated Before Approving Util Application IA-84-901, Final Response to FOIA Request Re Plant Proposed Civil Penalty.Forwards App B & D Documents.App B & C Documents Partially & Completely Withheld,Respectively (Ref FOIA Exemptions 5 & 7).App B,D & E Documents Available in PDR1987-05-26026 May 1987 Final Response to FOIA Request Re Plant Proposed Civil Penalty.Forwards App B & D Documents.App B & C Documents Partially & Completely Withheld,Respectively (Ref FOIA Exemptions 5 & 7).App B,D & E Documents Available in PDR ML20214L0681987-05-26026 May 1987 Final Response to FOIA Request Re Plant Proposed Civil Penalty.Forwards App B & D Documents.App B & C Documents Partially & Completely Withheld,Respectively (Ref FOIA Exemptions 5 & 7).App B,D & E Documents Available in PDR ML20214F9491987-05-15015 May 1987 Requests Notification Re Whether Organization Wishes to Remain on Mailing List for Facility Info within 30 Days of Ltr Receipt ML20214F6431987-05-15015 May 1987 Requests Notification of Wish to Remain on Mailing List to Receive Info Re Facility within 30 Days of Ltr Receipt or Name Will Be Removed from List ML20214F6021987-05-15015 May 1987 Requests Ltr Notifying NRC of Wish to Remain on Mailing List & to Continue to Receive Info Re Facility within 30 Days of Ltr Receipt ML20215H8901987-05-0505 May 1987 Sixth Partial Response to FOIA Request for Documents Re Allegations.Forwards App C & D Documents.App B Documents Also Available in PDR ML20206P1391987-04-16016 April 1987 Partial Response to FOIA Request for Info.Forwards App a Documents.App a Documents Also Being Made Available in PDR ML20203N3701986-09-26026 September 1986 Fourth Partial Response to FOIA Request for Region IV Allegation Data Forms & Background Records.Portions of App E & F Documents Forwarded & Available in PDR & App G & H Documents Withheld (Ref FOIA Exemptions 6 & 7) ML20206G7401986-06-18018 June 1986 Partial Response to FOIA Request for Documents Re Cases Pertaining to Plant from 830101-850820.App a Documents in Pdr.Forwards App B Documents ML20198E6491986-05-0808 May 1986 Partial Response to FOIA Request for All Internal Documents Re IE Info Notice 86-005 & Operability of Main Steam Safety Valves.Encl App a Documents Available in Pdr.App B Documents Being Placed in PDR IA-85-655, Final Response to FOIA Request for Four Categories of Documents Re QC at Facility.Documents Listed in App D Completely Withheld (Ref FOIA Exemptions 5 & 7)1986-01-0303 January 1986 Final Response to FOIA Request for Four Categories of Documents Re QC at Facility.Documents Listed in App D Completely Withheld (Ref FOIA Exemptions 5 & 7) ML20137X0501986-01-0303 January 1986 Final Response to FOIA Request for Four Categories of Documents Re QC at Facility.Documents Listed in App D Completely Withheld (Ref FOIA Exemptions 5 & 7) ML20138J7821985-12-11011 December 1985 Requests Notification within 1 Month of Ltr Date If Continued Svc of Documents & Correspondence Desired.Party Will Be Automatically Taken Off Svc List If Notification Not Received ML20138K0491985-12-11011 December 1985 Advises That Copies of NRC Correspondence to Util Will Not Be Sent Since Proceedings to Which Coalition for Environ Intervening Party Completed & OL Issued for Facility ML20138K6091985-12-11011 December 1985 Informs That Documents Filed by Licensee & Correspondence from NRC Re Operation of Facility Will Continue to Be Made Available in NRC & Lpdr.Nrc Will Discontinue Sending Copies as OL Proceedings Completed ML20138M3241985-12-11011 December 1985 Informs That Documents Filed by Licensee & Correspondence from NRC Re Operation of Facility Will Be Available in NRC & Lpdr.Nrc Will Discontinue Sending Copies as OL Proceedings Completed ML20134A6201985-10-22022 October 1985 Further Response to FOIA Request for Four Categories of Documents Re Plant Qc.Forwards Documents Listed on Apps B & C.Portions of App C Documents Withheld (Ref FOIA Exemptions 6 & 7) ML20133J4901985-10-11011 October 1985 Partial Response to FOIA Request for Four Categories of Documents Re QC at Facility.Documents on App a Available in Pdr.Search Continuing ML20135G4161985-08-0707 August 1985 Responds to FOIA Request for Four Categories of Documents Re Philippine Nuclear Power Plant.App a Documents Encl.App B Documents Available at Pdr.App C Document Withheld (Ref FOIA Exemption 4) NUREG-0748, Responds to FOIA Request for Four Categories of Documents Re Philippine Nuclear Power Plant.App a Documents Encl.App B Documents Available at Pdr.App C Document Withheld (Ref FOIA Exemption 4)1985-08-0707 August 1985 Responds to FOIA Request for Four Categories of Documents Re Philippine Nuclear Power Plant.App a Documents Encl.App B Documents Available at Pdr.App C Document Withheld (Ref FOIA Exemption 4) IA-84-701, Further Response to FOIA Request for Documents Generated During 840612 Interviews Re Facility or Specific Allegations Made During Interviews.Forwards App a Documents.Documents Also Available in PDR1985-07-22022 July 1985 Further Response to FOIA Request for Documents Generated During 840612 Interviews Re Facility or Specific Allegations Made During Interviews.Forwards App a Documents.Documents Also Available in PDR ML20134D6761985-07-22022 July 1985 Further Response to FOIA Request for Documents Generated During 840612 Interviews Re Facility or Specific Allegations Made During Interviews.Forwards App a Documents.Documents Also Available in PDR IR 05000483/19850021985-07-15015 July 1985 Notifies That Insp of Concerns Noted in Re Certification of Level III Inspectors Completed & Documented in Paragraph 4 of Encl Insp Rept 50-483/85-02.Info Deleted ML20133H6171985-06-27027 June 1985 Final Response to FOIA Requests for Documents Re Contacts Between Nrc/Doe & White House Officials Concerning Callaway, Diablo Canyon & Shearon Harris Plants.Forwards Listed Documents.Documents Also in PDR IA-85-354, Final Response to FOIA Requests for Documents Re Contacts Between Nrc/Doe & White House Officials Concerning Callaway, Diablo Canyon & Shearon Harris Plants.Forwards Listed Documents.Documents Also in PDR1985-06-27027 June 1985 Final Response to FOIA Requests for Documents Re Contacts Between Nrc/Doe & White House Officials Concerning Callaway, Diablo Canyon & Shearon Harris Plants.Forwards Listed Documents.Documents Also in PDR IA-84-355, Further Response to FOIA Request for Documents Re Contacts Between Doe/Nrc & White House,Utils,State Regulatory Agencies & Financial Community Concerning Facilities. Forwards Listed Documents.Documents Also in PDR1985-06-17017 June 1985 Further Response to FOIA Request for Documents Re Contacts Between Doe/Nrc & White House,Utils,State Regulatory Agencies & Financial Community Concerning Facilities. Forwards Listed Documents.Documents Also in PDR ML20128Q6911985-06-17017 June 1985 Further Response to FOIA Request for Documents Re Contacts Between Doe/Nrc & White House,Utils,State Regulatory Agencies & Financial Community Concerning Facilities. Forwards Listed Documents.Documents Also in PDR ML20126F3821985-06-14014 June 1985 Advises That Time for Commission to Review Director'S Decision DD-85-7 Expired.Commission Declined Review.Decision Became Final Agency Action on 850611.Served on 850617 IA-85-355, Responds to FOIA Requests for Records Re Contacts W/Federal Govt,State Regulatory Commissions,Util & Financial Community Concerning OLs for Facilities.Listed Document Available in Pdr.Search for Addl Documents Still in Progress1985-06-10010 June 1985 Responds to FOIA Requests for Records Re Contacts W/Federal Govt,State Regulatory Commissions,Util & Financial Community Concerning OLs for Facilities.Listed Document Available in Pdr.Search for Addl Documents Still in Progress ML20129A1811985-06-10010 June 1985 Responds to FOIA Requests for Records Re Contacts W/Federal Govt,State Regulatory Commissions,Util & Financial Community Concerning OLs for Facilities.Listed Document Available in Pdr.Search for Addl Documents Still in Progress ML20128P9271985-05-15015 May 1985 Responds to FOIA Request for Any & All Records Re Insp Rept 50-483/84-45.Forwards App a Documents.Info Available in Pdr.App B Document Partialy Withheld (Ref FOIA Exemption 5) ML20127D9171985-05-10010 May 1985 Ack Receipt of 850326 Request for Action Under 10CFR2.206 for Order to Show Cause Why OL Should Not Be Suspended or Revoked Due to Qualification of Const & Operations QA Personnel ML20126H3351985-04-15015 April 1985 Responds to FOIA Request for Documents Re Electrical Cable Separation Deficiencies at Facility.Forwards Apps a & B Documents.Documents Also Available in PDR ML20126E1931985-03-11011 March 1985 Responds to FOIA Request for Five Categories of Documents. Forwards Documents Listed on App.Documents Also Available in PDR ML20134A6281985-02-13013 February 1985 Forwards Memo Documenting Concerns Re Certification of Level III Inspectors Per .Concerns Assigned to Region III for Resolution.Insps Will Be Completed within 90 Days. Info Deleted ML20127C4351985-01-11011 January 1985 Informs That Considerable Insp Resources Expended to Pursue Matters Raised in 840928 Petition.Decision Will Be Issued on Petition After Insp Efforts & Evaluation of Results Completed IR 05000483/19840301984-09-28028 September 1984 Partially Withheld Ltr Extending Appreciation for Cooperation Re Const Deficiencies.Insp Rept 50-483/84-30 Discussing Technical Concerns Encl.Other Concerns Forwarded to Regions II & IV ML20148G5501978-11-0303 November 1978 Responds to to Rc Deyoung Re Review of Site & Its Relationship to New Madrid Fault.Repts That Aslp Concluded Favorably on All Aspects of Plant Constr Permit Appl W/Copy of from Drs Nieto & Cording 1988-11-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217K1051999-10-19019 October 1999 Ack Receipt of Ltr Dtd 990707,which Transmitted Rev 29 to Callaway Plant Physical Security Plan,Under Provisions of 10CFR50.54(p).Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML20217G2071999-10-14014 October 1999 Forwards Insp Rept 50-483/99-10 on 990913-16.No Violations Noted.Insp Was to Review Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise ML20217B5901999-10-0505 October 1999 Informs That Staff Concludes That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Callaway Plant,Unit 1 ML20217B5711999-10-0505 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & Uec Responses for Callaway NPP Unit 1 ,990224 & 990628.Informs That Staff Reviewed Responses & Concluded That All Requested Info for GL 98-01 Provided ML20212G0221999-09-22022 September 1999 Forwards Insp Rept 50-483/99-11 on 990812-20.No Violations Noted.Team Found,Weakness in flow-accelerated Corrosion Monitoring Program Resulted in No Previous Insp of Pipe Segment Which Failed ML20212D9341999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Callaway Plant.In Area of Ep,C/As Taken in Response to Problems Identified During Previous Exercises Warrant More in-dept Review.Details of Insp Plan Through March 2000 Encl ML20212A4921999-09-13013 September 1999 Forwards Insp Rept 50-483/99-08 on 990725-0904.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212B1521999-09-10010 September 1999 Forwards Insp Rept 50-483/99-07 on 990809-13.No Violations Noted.Inspectors Used Annual Licensed Operator Requalification Exams to Assess Licensed Operator Performance ML20211N0321999-09-0202 September 1999 Forwards SE Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20211B0241999-08-18018 August 1999 Ack Receipt of Ltr Dtd 990714,transmitting Scenario for Licensee Upcoming Biennial Exercise.Based on Review,Nrc Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20210T9121999-08-13013 August 1999 Forwards Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P0371999-08-10010 August 1999 Forwards SE Granting Licensee 980710 Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code for Second 10-year Interval ISI at Plant,Unit 1 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6381999-07-30030 July 1999 Forwards SE Accepting Relief Request for Approval for Use of Alternate Exam Requirement for Plant Inservice Insp Program ML20210B5611999-07-20020 July 1999 Forwards Review of Ltr & Encl Objectives for Plant,Unit 1,1999 Emergency Plan Exercise Scheduled for 990914 ML20210B4401999-07-19019 July 1999 Ack Receipt of Revs to Facility Radiological Emergency Response Plan,Chapters 8.0 & 4.0,issued Respectively on 990512-14,under Provisions of 10CFR50,App E,Section V ML20210B4021999-07-19019 July 1999 Ack Receipt of Facility Emergency Plan Implementing Procedure EIP-ZZ-00101, Classification of Emergencies, Rev 23,issued on 990513,under Provisions of 10CFR50,App E, Section V ML20209E5591999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.TAC MA0531 Closed ML20196J9501999-07-0202 July 1999 Ack Receipt of Plant Ep,Rev 22,received on 981207 & Submitted Under Provision of 10CFR50,App E,Section V.Changes Does Not Decrease Effectiveness of EP & Continues to Meet Stds of 10CFR50.47(b).NRC Approval Not Required ML20196F8101999-06-25025 June 1999 Informs That J Donohew Will Assume Project Manager Responsibilities,Effective 990621 ML20196H2521999-06-25025 June 1999 Forwards Insp Rept 50-483/99-05 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20196F8181999-06-24024 June 1999 Forwards RAI Re 990111 Request for Relief from Certain ASME Code ISI Requirements for Containment Liners.Response Requested within 30 Days from Date of Agreement IR 05000483/19990041999-06-18018 June 1999 Refers to GL 96-05 Issued by NRC on 960918,UE Responses & 970313 & NRC Insp Rept 50-483/99-04,dtd 990427. Forwards Request for Addl Info Re GL 96-05 Program at Callaway Plant,Unit 1 ML20207H3751999-06-14014 June 1999 Discusses 990407 Une Request That Proprietary Version of Document Entitled, Evaluation of Severe Accident Simulation, Dtd April 1999,be Withheld from Public Disclosure.Determined Info Proprietary & Will Be Withheld ML20195H0971999-06-14014 June 1999 Discusses Une 990407 Request That Proprietary Document Entitled, Thermal Stability Assessment - Electrosleeved Tubes, Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20207G3151999-06-0707 June 1999 Ack Receipt of Callaway Plant EP Implementing Procedure EIP-ZZ-001001M,Classification of Emergencies,Rev 22,issued on 981222 Under 10CFR50,App E,Section V Provisions.No Violations Identified ML20207G3201999-06-0707 June 1999 Ack Receipt of Change Notice 98-008 Dtd 980918,which Transmitted Changes to Callaway Plant Ep,Rev 21,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required.No Violations Identified ML20207E2711999-05-25025 May 1999 Ack Receipt of in Response to & Insp Rept Confirming Commitment as Stated by M Taylor During Telephonic Exit Meeting on 990413 ML20207A8711999-05-24024 May 1999 Informs That NRR Reorganized,Effective 990328.Forwards Organization Chart ML20207A4131999-05-19019 May 1999 Forwards Insp Rept 50-483/99-03 on 990321-0501.One Violation of NRC Requirements Identified & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy ML20206K6511999-05-10010 May 1999 Forwards RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20206N3981999-05-10010 May 1999 Responds to Comments & Questions Submitted to NRC Staff Re Recent License Amend Issued by NRC to Callaway Unit 1 License.Provides Context for Conclusion That Reracking of Callaway SFP Maintains Adequate Protection of Public Safety ML20206H1101999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam, Administered on 990407,to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheets & Results to Appropriate Individuals.Without Encl ML20206H1821999-05-0606 May 1999 Forwards RAI Re Licensee Request for Relief from Certain ASME Code ISI Requirements Submitted by .Response Requested within 30 Days of Receipt of Ltr ML20206F4931999-05-0303 May 1999 Forwards Exam Rept 50-483/99-302 on 990416.Insp Included Evaluation of Applicant for Reactor Operator License ML20205S2571999-04-19019 April 1999 Discusses Plans to Sponsor Testing of Electrosleeved Tubes to Better Understand Behavior of Electrosleeve Matl Under Severe Accident Conditions ML20205Q5461999-04-19019 April 1999 Forwards Safety Evaluation Relief Request from Certain ASME Section XI Requirements for Concrete Containment ISI for Plant ISI Program ML20205K7641999-04-0808 April 1999 Ack Receipt of Re Comments & Questions Concerning Recent Amend to Plant,Unit 1.Response to Comments & Questions Should Be Completed by mid-May ML20205J8701999-04-0606 April 1999 Ack Receipt of ,In Response to NRC Insp Rept 50-483/99-02,dtd 990225 Re Verbal Commitment Made During Exit Meeting for Insp.Understands Next Rev of Security Plan Will Include Increased Min Staffing of Three Armed Guards ML20205J8721999-04-0505 April 1999 Refers to Meeting Conducted in Emergency Operations Facility at Callaway Plant on 990401 Re Plant Performance Review for Plant Completed on 990211.Year 2000 Readiness Issues & New Reactor Licensee Performance Assessment Also Discussed ML20205J9401999-04-0505 April 1999 Forwards Insp Rept 50-483/99-01 on 990207-0330.One Violation Occurred & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy IR 05000019/20250011999-04-0202 April 1999 Informs That Version of Topical Rept BAW-10219P,Rev 3 Dtd Oct 1998 & Document 51-5001925-01,dtd 980828 Will Be Marked as Proprietary & Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20205A3821999-03-19019 March 1999 Advises of NRC Planned Insp Effort Resulting from Callaway Plant Performance Review for Period 970510-990125. Historical Listing of Plant Issues & Details of NRC Insp Plan for Next 8 Months Encl ML20204E7281999-03-18018 March 1999 Ack Receipt of Which Transmitted Rev 28 to Callaway Plant Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Util Determined Changes Do Not Decrease Effectiveness of Plan ML20204E3671999-03-18018 March 1999 Informs That During 990128 Telcon Between D Lantz & H Bundy, Arrangements Were Made for Administration of Retake Written Operator Licensing Exam at Plant,During Wk of 990419 ML20204B7091999-03-15015 March 1999 Informs That Changes Described in ,Submitting Rev 20 to Plant Operational QA Manual,Appear Consistent with Guidelines for non-reduction in Committments ML20204C4241999-03-15015 March 1999 Forwards Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20207F4731999-03-0404 March 1999 Discusses 990302 Public Meeting Re Program Updates & Organizational Changes in Emergency Preparedness & Security. List of Attendees & Licensee Presentation Encl ML20207L6491999-03-0404 March 1999 Informs That Util 990111 Response to Request for Addl Info Re Question 4 Will Be Marked as Proprietary & Will Be Withheld from Public Disclosure Pursuant to 10CFR2.709(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended 1999-09-22
[Table view] |
Text
-- .
I U.S. NUCLEA7 CEIULATORY COMMISSl!N Nsc Foi.s s.toutSt Nuvstasi g
/* ,,,%-
" i m F01A-84-901 eESPONSE TYPE g r t ! RESPONSE TO FREEDOM O '
L Xh'*^' l l Paatia' i
- \,*e.e / INFORMATION ACT (FOlA) REQUEST ^ I MM 2 6 gg oocasT NuustRiS ur een c.a.
REQutStiR Ms _ Micholo Varricchin PART 1.--RECORDS RELEASED OR NOT LOCATED ISee checked bones)
No agency records subpoet to the request have been located.
No additsonal agency records subsect to the request have been located.
Agency records subsect to the request that are identifed in Appendiu Q are already available for public inspection and copying in the NRC Public Docurnent Room, XX 1717 H Street, N W., Washmgton, DC.
(yy Agency records subsect to the request that are identifed in Appendix b* OUd O are being made avadaNe for puNec inspecten and copying in the NRC Public Document Room,1717 H Street. N W., Washmgton, DC, in a folder under the FOIA number and requester name.
The nonpropretary version of the proposalts) that you agreed to accept in a telephone conversaten vnth a member of my staff is now bemg made availab's for public inspection and coymg at the NRC Pubhc Document Room,1717 H Street, N W.. Washington, DC. in a folder under this FOIA number and requester name.
Enclosed is information on how you may obtain access to and the charges for copymg records placed in the NRC Pubhc Document Room,1717 H Street, N.W., Washing
)
Agency records subsect to the request are enclosed. Any applicaNe charge for copes of the records provided and payment procedures are noted in the comments section.
Records subject to the request have been referred to another Federal agencytes) for revew and direct response to you.
In vow of NRC's response to this request. no further action is being taken on appeal letter dated PART ll.A-lNFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain informaton m the requested records is being withheld from public declosure pursuant to the FOIA exemptions described in and for the reasons stated in Part II, sec-nX tions a. c. and o. Any rWeased pomons of the documents for which ordy part of the record is being withheld are being made evadable for public inspectson and cop ihe NRC Public Document Room,1717 H Street. N W., Washmgton, DC, in a folder under this FOIA number and requester name.
C_4nts
- n Released portions of records identified on Appendix B are being placed in the PDR.
Records identified on Appendix C are withheld from public disclosure in their entirety for the reasons stated in Part 11.B.5, 6, and 7.
The record identified on Appendix Ds with handwritten notations is being released in its entirety.
Si ATURE. DIRECTOR Df SiON F LES AND RECORDS v s , ' / * / /ts A - l ..
- _< c B705290181 870526 PDR FOIA VARRICC87-901 PDR NRC FORM 464 (Pan h is asi 1
FREEDOM OF INFORMATION ACT RESPONSE FOIA NUMBERtSI: F01A-84-901 DATE u r. u a e _ _ _ _
PART 110- APPLICA LE FOIA EXEMPTIONS IN 6 ' C35(
Records subject to the request that are described in the enclosed Appendices R: C are being withheld in their entirety or in part under FOIA Eaemptions and for the reasons set forth below pursuant to 5 U.S.C. 552(b) and 10 CFR 9.5(a) of NRC Regulations.
- 1. The wthheld information is property classified pursuant to Executive Order 12356 (EXEMPTION 11
- 2. The wthheld information relates solely to the internal personnel rules a.id procedures of NRC. fEXEMPTION 2)
- 3. The withheld informaton a specifically exempted from public declosure by statute indicated: (EXEMPTION 31 Section 141145 of the Atomic Energy Act which prohitsts the disclosure of Restncted Data or Formerly Restricted Data (42 U.S.C. 2161-2165).
Secten 147 of the Atomic Energy Act which prohitzts the disclosure of Unclassified Safeguards Informaten (42 U S C. 21671.
- 4. The withheld informaton is a trade secret or commercial or financial information that is being ethheld for the reason (s) indicated: (EXEMPTION 4)
The informaton is considered to be confidential busmess (propnetary) information.
The mformation is considered to be propnetary information pursuant to 10 CFR 2.790(dH1).
The informaton was st.bmitted and received in confidence from a foreign source pursuant to 10 CFR 2.790(dll2).
- 5. The withheld infom'ation conssts of interagency or intraagency records that are not available through discovery dunng litigation. Declosure of predecisional information X would tend to inhibi the open and frank enchange of ideas essential to the deliberatrve process. Where records are withheld m ther entrety, the facts are inextricatWy intertwmed eth the piedecisenalinformaton. There e'so are no reasonatWv segregable factual portions because the release of the facts would permit an mdirect inquiry into tne predecmonal process of the egency. (EXEMPTION 51
- 6. The wthheld informanon is exempted from pubhc d sclosure because its disclosure would result in a clearly unwarranted invasion of personal privacy. (EXEMPTION 61
- 7. The wthheid informaton conssts of investigatory records compiled for law enforcement purposes and is being withheld for the reason (s) indicated. (EXEMPTION 71 Declosure would irnerfere with en enforcement proceedmg because it could reveal the scope,4recten, and focus of er.forcement efforts. and thus could possetwy allow them to take acton to shield potential wrongdomg or a violaten of NRC requirements from investigators. IEXEMPTION 7(Al)
Disclosure would constitute an unwarranted invasen of personal privacy (EXEMPTION 71C))
The information consrsts of names of individuals and other information :he disclosure of which would revealidentities of confidental sources. (EXEMPTION 7101)
PART ll C-DENYlNG OFFICIALS Pursuant to 10 CFR 9 9 and/or 9.15 of the U.S. Nuclear Regulatory Commessen regulatens, it has been determmed that the informaton withheld a exempt from production or desclosure, and that its production or disclosure is contrary to the public interest. The persons responsible for the demal are those officals identified below as denymg officials and the Drector.
Divsen of Rules and Records Office of Adminstraten, for any denaals that may be appealed to the Executrve Drector for OperatenslEDot DENylNG OFFICIAL TITLE / OFFICE RECORDS DENIED APPELLATE OFFICIAL Mr. Bert Davis Regional Administrator $'c= **
Region III B 1,_B 2,_B 3, C3, C4, C7 X Director, Office of C1, C2, C6, C8 Dr. Thomas F. Murley Nuclear Reactor RegulationC9, CIO, Cll, C12, CL3 X Deputy General Counsel Mr. James P. Murray for Hearings & Enforcenent C5 X PART la D- APPEAL RIGHTS The denial by each denying official identified in Part ll.C may be appealed to the Appellate Official identified in that section. Any such appeal must be in writing and must be made within 30 days of receipt of this response. Appeals must be addressed as appropriate to the Executive Director for Operations or to the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial FOIA Decision."
senc Fonu aos (Port 2>
- asi U.S. NUCLEAR REGULATORY COMMISSION FOIA RESPONSE CONTINUATION
l
.l l
~ Re:'F01A-84-901 APPENDIX B RECORDS PARTIALLY WITHHELD
- 1. 10/16/84 Memorandum for Dircks from Keppler with response to Asselstine (1 page) (Released)
^
Enclosure:
10/16/84 Draf t Memo for Asselstine from Dircks, subject: Callaway.- Late Allegations and Readiness to Proceed Beyond Low Power Operation (3 pages)
(Released)
Enclosure I: Undated - Late Allegations Evaluation (3 pages)
(Portions Withheld - F0IA Exemption.(7)(A). Denying Official: Mr. Bert Davis, R III.
Enclosue II: Undated - Callaway Plant Operating Experience (5 pages)(Released)
- 2. 10/16/84 Memorandum for Denton from Keppler, subject: Callaway Readiness for Full Power License. (2 pages) (Released) w/ enclosures:
Enclosure Enclosure 2(2pages)(Released1 (1 page) (Released))
Enclosure 3 (2 pages) (Portions withheld F0IA Exemption (7)(A) Denying Official: Mr. Bert Davis, R III Enclosure 4 (3 pages) (Released)
- 3. 10/17/84 Memorandum for Asselstine from Dircks, subject: Callaway
- Late Allegations and Readiness to Proceed Beyond Low a Power Operation (2 pages) (Released) w/encisoures:
Enclosure I - Late Allegations Evaluation (3 pages) (Portions i
Withheld-F0IAExemption(7)(A),DenyingOfficial:
Mr. Bert Davis, RIII 3 EnclosureII - Callaway Plant Operating Experience (5 pages)
(Released) 4 1
,,, . , , - . , - - . , . , . - ~ . . - - - - , - - - . . - , - - , , , , . - , . . . - . - , - - - - , . - . - . . , ---- -,nr, ..
GOVERNMENT ACCOUNTABluTY PICJECT 1555 Connecticut Avenue. N.W., Suite 202 Washington D.C. 20036 (202)232-8550 December 3, 1984 FREEDOM OF INFORMATION ACT REQUEST FREEDOM OF INFORMATION ACT REQUEST f c f Administration "* !
U.S. Nuclear Regulatory Commission i ggg Washington, D.C. 20555 To Whom It May Concern:
Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C. 552, the Government Accountability Project (GAP) requests copies of any and all agency records and information, including but not limited to notes, letters, memoranda, drafts, minutes, diaries, logs, calandars, tapes, transcripts, summaries, interview reports, procedures, !
instructions, engineering analyses, drawings, files, graphs, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, books, telephone messages, inter office memoranda, computations, voice recording, and other data compilations, interim and/or final reports, status reports, and any and all other records relevant to and/or generated in connection with and/or as a result of the following in regard to the Callaway Nuclear Power Plant, Unit 1, authorized by NRC operating License No. NFP-25:
- Citizens petition submitted pursuant to 10 CFR 2.206 to the NRC by the Government Accountability Project (. GAP) dated September 28, 1984;
- Review by NRC Region III representatives and NRC commissioners prior to the October 4, 1984 Commission meeting held in Washington, D.C. on the authorization of a full power license for the Callaway plant; l
- Memorandum for Harold Denton (NRR) from James Keppler, Regional Administrator Region III, regarding Callaway Readiness for Full Power l License ard the Enclosure 3 titled Late Allegations Evaluations; I
- Telephone conference at 1 PM CDT on 10/5/84 held with representatives of Region III, I&E, and NRR to review and assess the 48 allegations filed by GAP.
Telephone conversation and personal discussion with the NRC staff and representatives of GAP on October 4,5,8,11,15,1984 for the purpose of obtaining the affidavits which GAP relied upon to prepare allegations;
I' Director December 3, 1984 Office of Administration Page two
- ' Letter dated October 17, 1984 from GAP to Harold Denton (NRR) regarding Callaway;
- Letter dated-November 7, 1984.from Harold Denton (NRR) to Billie Garde (GAP) to acknowledge GAP letter of September 28, 1984 requesting the suspension of the low power license and denial of full power license; i
- Letter dated November 21, 1984 from Frank Miraglia regarding
.the NRC's request for additional information concerning allegations contained in GAP letter of September 28, 1984;
- Enforcement conference held on August 20, 1984 with Region III representatives and utility (. Union Electric) representatives to discuss the routine safety inspection held during July 30-August 3, 1984 and August 13-17, 1984;
- Letter dated October 19, 1984 from Regional Administrator, Region III, James Keppler to Donald Schnell of Union Electric regarding a proposed civil penalty for violation;
- November 30, 1984 conference held inLthe office of-Frank Miraglia with Bill Forney, Callawy plant manager, Attorney Leiberman, Billie Garde and Michele Varricchio (GAP) to discuss the NRC request for additional information.
This request includes all agency records as defined-in 10 C.F.R >
- 9. 3a (b) and the NRC Manual, Appendix 0211, Parts 1.A.2 and A.3 (approved October 8, 1980), whether they currently exist'in the NRC official ~" working" investigative or other files, or at any other !
location, including private residences.
l If any records, as defined in 10 C.F.R. 9.3a(b) and the NRC Manual, supra,and covered by this request have been destroyed and/or ;
removed, or are destroyed and removed after receipt of this request, !
please provide all surrounding records, including, but not limited to, a list of all records which have been or are destroyed and/or removed, a description of the action (.s) taken, relevant date (s) , individual, office and/or agency-wide policies and/or justifications for the action (s), identification of all personnel involved with the actions, and any and all records relevant to, generated in connection with, and/or issued in order to implement the action tsl .
l l
l
Director December 3, 1984
.. Dffice of Administration Page three GAP requests that fees be waived, because " finding the information can be considered as primarily benefitting the general public,"
- 5. U.S.C. 552 (a) (4) (A) . The Government Accountability Project is a non- profit, non-partisan public interest organization concerned with honest and open government. Through legal representation, advice, national conferences, films, publication and public outreach, the Project promotes whistleblowers as agents of government accountability.
Through its Citizens Clinic, GAP offers assistance to local public interest and citizens groups seeking to ensure the health and safety of their communities. The Citizens Clinic is currently assisting several
' citizens groups and intervenors in the Missouri area concerning the construction of the Callaway nuclear power plant.
We are requesting the above information as a part of an ongoing monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.
For any documents or portions therof that you deny due to specific FOIA exemptions, please provide an index itemizing and describing the documents or portions of documents withheld. The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document / portion of document withheld. This index is required under vaughn v. Rosen (I) , 484 F.2d 820 (D.C. Cir. 1973) cert. denied, 415 U.S. 977 (1974).
We look forward to your response to this request within ten days.
Sincerely,'
I' f
hele Varricchio Staff Associate l
1 l
l I
Re: F0IA aa oni APPENDIX C RECORDS TOTALLY WITHHELO NUP.3ER DATE DESCRIPTION & EXEMPTION
- 1. Undated Draft letter w/ annotations to Schnell from Taylor (6 pages) Exemption (5), Denying Official: Dr. Thomas E.
Murley, NRR
- 2. 9/17/84 Memo for Axelrad from Schultz, subject: Union Electronic Company - Callaway Plant Proposed Civil Penalty (22 pages)
Exemption (5),DenyingOfficial: Dr. Thomas E. Murley, NRR.
- 3. Undated Memo for Axelrad from Schultz subject: Union Electric Company - Callaway Plant Proposed Civil Penalty (9 pages) w/encicsed draft enforcement package Exemption'(5).
Denying Official: Mr Bert Davis, RIII,
- 4. Undated Memo for Axelrad from Schultz, subject: Union Electric Company - Chilaway Plant Proposed Civil Penalty, w/ enclosures (17 pages) Exemption (5), Denying Official:
Mr. Bert Davis, RIII.
- 5. 10/2/84 Note to Axelrad from Burns, subject: Union Electric Company - Callaway Unit (EA-84-97) (9 pages) Exemption (5), Denying Official: Mr. James P. Murray, OGC.
- 6. Undated Annotated draf t EA-84-97, Order Imposing Civil Monetary Penalty (6 pages) Exemption (5), Denying Official: Dr.
Thomas E. Murley, NRR
- 7. 10/2/84 Allegation Data Form (1 page) Exemption (7)(A), Denying Official: Mr. Bert Davis, RIII 8.
10/16/84 Memo for Pawlick from Keppler, Subjec't: Request for Investigation - Callaway (50-483) (ATS No. RIII -
84-A-0138) (2 pages) Exemption (7)(A), Denying Official:
Dr. Thomas E. Murley, NRR
- 9. 10/22/84 Memo for Warnick thru Schweibinz from Foster, subject:
Possible Identity, GAP Callaway A11eger (1 page) Exemptions (5),(6),(7)(A)(D)
NRR Denying Official: Dr. Thomas E. Murley,
- 10. Undated Handwritten Notes titled Categories (1 page) Exemption (7)(A), Denying Official: Dr. Thomas E. Murley, NRR
- 11. Undated Handwritten Notes in table form - Callaway ~ Allegations (2 pages) Exemption (7)(A), Denying Official: Dr. Thomas E.
Murley, NRR.
- 12. Undated Handwritten list of issues (1 page) Exemption (7)(A).
Denying Official: Dr. Thomas E. Murley, NRR
- 13. Undated Draft letter to Garde from Lieberman re: acknowledging receipt ofOfficial:
Denying GAP's 9/28/84 letter (4 pages) Exemption (5).
Dr. Thomas E. Murley, NRR
Re: FOI A- 84-901 APPENDIX D RECORDS MAINTAINED IN THE PDR UNDER THE AB0VE REQUEST NUMBER NUMBER DATE DESCRIPTION
- 1. 9/26/84 Letter to the Commissioners from Varricchio and Garde with handwritten notes on investigations, placed in the margins. (17 pages) NOTE: A copy of this record without the added notations in the margins, is available in the PDR as listed on Appendix A 13, AN0: 8410020716.
--,,w-- ,nw g -, - - - , - g
Re: F01A-84-901 4
APPENDIX E RECORDS MAINTAINED AMONG PDR FILES THE FOLLOWING RECORDS ARE FILED IN THE PDR UNDER EA-84-97: ,
1
- 1. Accession No. 8410230058 (3 pages) I
- 2. Accession No. 8410230064 (4 pages)
- 3. Accession No. 8501220571 (5 pages) t i
l
[
i.