ML20133E779

From kanterella
Revision as of 11:19, 4 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That Site Selected for Evaluation on 850619 by Boise Interagency Fire Cache Re Establishment of VHF Radio Communications Sys.Members of Boise Interagency Fire Cache Will Require Escorted Access While Visiting Facility
ML20133E779
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/05/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
References
NUDOCS 8508080014
Download: ML20133E779 (1)


Text

.

f JUN 051985

~

South Carolina Electric and Gas Company ATTN: Mr. O. W. Dixon, Jr.

Vice President, Nuclear Operations P. O. Box 764 (167)

Columbia, SC 29218 Gentlemen:

SUBJECT:

EVALUATION OF SITE FOR THE ESTABLISHMENT OF JHE VHF RADIO COMMUNICATION SYSTEMS The U. S. Nuclear Regulatory Commission has entered into an arrangement with Boise Interagency Fire Cache (part of the Department of Interior) for Boise to evaluate nuclear power plant sites for the establishment of an emergency VHF radio system. This radio system, if installed, will be used as a supporting and backup communications means by the NRC in emergency situations. Your V. C. Summer site has been selected for evaluation on June 19, 1985.

Members of Boise Interagency Fire Cache will require escorted access while visiting your facility. Preferably this escort should be someone who is familiar with communications systems. Boise's access will be limited to emergency response facilities and the surrounding site.

Sincerely, David M. Verre111, Chief Reactor Projects Branch 1 Division of Reactor Projects cc: 0. S. Bradham, Station Manager J. P. Harrison, Manager Nuclear Security '

B. G. Croley, Manager, Nuclear Engineering D. A. Lavigne, Director Surveillance Systems bec: Document Control Desk State of South Carolina NRC Resident Inspector J. Hopkins, Project Manager, NRR an-Brown:es fg[ Q Collins 74 7 WC e AJohnson FCantrell

/85 gl 85 /$/85 8/[/85 b/)/85 8508000014 850605 PDR ADOCK 05000395 F PDR 5501